Search results
You searched for
2962 results found
I-LAD (Innovating Losses Analysis and Detection) Discovery R4
Start date:
Feb 2025
End date:
May 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Discovery - Round 4
FastTrack Discovery R4
Start date:
Feb 2025
End date:
May 2025
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Discovery - Round 4
RIDES (Rural Industrial DEcarbonisation Support.) Discovery R4
Start date:
Feb 2025
End date:
May 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 4
FLEX-STORE: FLEXible STORE of electrified thermal energy
Start date:
Jan 2025
End date:
Jun 2025
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Discovery - Round 4
3DAR (Dynamic, Data Driven Asset Rating) Discovery R4
Start date:
Feb 2025
End date:
May 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 4
Phased Switch System
Start date:
Sep 2024
End date:
Jan 2028
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Beta - Round 2
PRIDE-Beta
Start date:
Nov 2024
End date:
Oct 2027
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Beta - Round 2
Climate Resilience Decision Optimiser (CREDO+)
Start date:
Sep 2024
End date:
Mar 2028
Status:
Live
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- SIF Beta - Round 2
MultiResilience Project – Enhancing Energy Network Resilience
Start date:
Dec 2024
End date:
Sep 2028
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Beta - Round 2
SIF Black Start Demonstration from Offshore Wind (SIF BLADE)
Start date:
Sep 2024
End date:
Oct 2027
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Beta - Round 2
Flexible Railway Energy Hubs
Start date:
Dec 2024
End date:
Dec 2029
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Beta - Round 2
Powering Wales Renewably (PWR) - Beta
Start date:
Jan 2025
End date:
Jan 2029
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Beta - Round 2

SHIELD - Smart Heat and Intelligent Energy in Low-Income Districts
Start date:
Dec 2024
End date:
Jan 2029
Status:
Live
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- SIF Beta - Round 2
Intelligent Gas Grid - Beta
Start date:
Aug 2023
End date:
Aug 2026
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Beta - Round 1
Velocity design with hydrogen - Beta
Start date:
Aug 2023
End date:
Feb 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Beta - Round 1
HyNTS FutureGrid Compression
Start date:
Sep 2023
End date:
Jan 2027
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Beta - Round 1

HyNTS FutureGrid Deblending
Start date:
Sep 2023
End date:
Jun 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Beta - Round 1

Network-DC Circuit Breakers
Start date:
Sep 2023
End date:
Jun 2027
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Beta - Round 1
Predict4Resilience (P4R) - Beta
Start date:
Aug 2023
End date:
Jan 2027
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Beta - Round 1
Digital Platform for Leakage Analytics – Beta Phase
Start date:
Sep 2023
End date:
Mar 2026
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Beta - Round 1
Crowdflex - Beta
Start date:
Dec 2023
End date:
Jan 2026
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Beta - Round 1

Artificial Forecasting
Start date:
Feb 2025
End date:
Feb 2027
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Beta - Round 1
SIF R3 Alpha: SeaChange
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 3
Electric Thames
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Alpha - Round 3
Flex Direct
Start date:
Nov 2024
End date:
May 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- SIF Alpha - Round 3
HeatNet
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Alpha - Round 3
Road to Power (Alpha)
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Alpha - Round 3
HyScale LOHC Phase 2b (Alpha)
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Alpha - Round 3
Fuel Cell Renewable Energy Equity (FREE) Round 3 Alpha Phase
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 3
Cross Vector Hub (R3A)
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Alpha - Round 3
Fractal Flow Alpha R3
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 3
Nature4Network - Alpha R3
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 3
Wayl-Ease
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 3
CoolDown - SIF Alpha
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Alpha - Round 3
Network Security in a Quantum Future - Alpha
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 3

REVISE – Revisiting and Evaluating Environmental Inputs on Line Ratings
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Alpha - Round 3
SYSMET – SYstem Strength Measurement and EvaluaTion
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 3
LV Optimiser
Start date:
Oct 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 3
Equiflex - Alpha
Start date:
Dec 2024
End date:
Jun 2025
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Alpha - Round 3
Geogrid
Start date:
Jan 2025
End date:
Jul 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 3
Look NortH2
Start date:
Nov 2024
End date:
May 2025
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Alpha - Round 3
Constellation
Start date:
May 2021
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIC
Protection Solutions to perform for Lower Levels of Fault Current on AC Networks (PSL-FC)
Start date:
Jul 2021
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
QUEST
Start date:
Jun 2021
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
DynaLoad – Dynamic loading of transformer insulation
Start date:
Aug 2021
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Retrofit Insulated Cross Arms (RICA)
Start date:
Dec 2021
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIC
Cyber Security for Active and Flexible Energy Networks (Cyber-SAFEN)
Start date:
May 2022
End date:
Apr 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Risk Assessment Methodologies for Pipelines and AGIs 2021 - 2026
Start date:
Apr 2021
End date:
Mar 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

PRCI (Pipeline Research Council International) 2021 - 2026
Start date:
Apr 2021
End date:
Mar 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

EPRG (European Pipeline Research Group) 2021 - 2026
Start date:
Apr 2021
End date:
Mar 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

Right to Heat
Start date:
Feb 2022
End date:
Apr 2025
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-1
Customer Energy Village: Project 1: Energy Efficiency
Start date:
Nov 2021
End date:
Apr 2025
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Non-invasive In-situ Monitoring and Interpretation of SF6 Alternatives in GIS Equipment
Start date:
Feb 2022
End date:
Jan 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Net Zero Transport - Discovery Continuity
Start date:
Feb 2022
End date:
Jul 2025
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Data and Digitalisation - Discovery Continuity
Start date:
Feb 2022
End date:
Feb 2027
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
EPRI Substations (P37) and Analytics (P34) 2021-2025
Start date:
Dec 2021
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
EPRI Research Collaboration on Underground Transmission (P36) 2021-2025
Start date:
Dec 2021
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
EPRI Research Collaboration on Electric & Magnetic Fields Health & Safety (P60) 2021-25
Start date:
Dec 2021
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Pollywood II
Start date:
Apr 2022
End date:
Mar 2025
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Collaborative Local Energy Optimisation (CLEO)
Start date:
Mar 2022
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
A Holistic Intelligent Control System for flexible technologies (T2)
Start date:
Jan 2022
End date:
Aug 2026
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Transmission OHL Crossing Protection Stage 1 (T2)
Start date:
Apr 2022
End date:
Oct 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Project Conan (T2)
Start date:
Apr 2022
End date:
Nov 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Condition Assessment of SF6 Alternatives (CASA)
Start date:
May 2022
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Landslide Protection Asset (T2)
Start date:
Jan 2022
End date:
May 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Co-Simulation
Start date:
Jul 2023
End date:
Jun 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Aerial E-field Inspection System for Live Overhead Transmission Assets
Start date:
Jun 2022
End date:
May 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
BiTraDER
Start date:
May 2022
End date:
Jul 2026
Status:
Live
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- NIC
Equitable Novel Flexibility Exchange (EQUINOX)
Start date:
Mar 2022
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIC
HyNTS Defect Fatigue Behaviour
Start date:
Sep 2022
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Identification and quantification of C4F7N gas arcing by-products and their implication for GIS operation
Start date:
Nov 2022
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
OHL Foundation Uplift
Start date:
Dec 2022
End date:
May 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Voltage Interaction and Thermal Dynamics of Tertiary Connection
Start date:
Apr 2023
End date:
Jul 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Innovative Monitoring of GIS Cable Terminations
Start date:
Mar 2023
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Transformer Research Consortium – Phase 5: Future-proof Transformers in a Digital Twinning and Net-Zero World
Start date:
Nov 2023
End date:
Oct 2027
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
DELIVER: Digital-Twin Enabled Innovation for Energy Network Restoration
Start date:
Jun 2023
End date:
Oct 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
LV De Mesh
Start date:
Apr 2023
End date:
Mar 2025
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Grid forming modelling and stability
Start date:
Apr 2023
End date:
Apr 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Silicone Oil Markers Investigation (SOMI)
Start date:
Jul 2023
End date:
Jan 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Low to no power heat alternatives
Start date:
May 2023
End date:
May 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Optimum Wide Area Power Flow Control Solutions
Start date:
Jun 2023
End date:
Oct 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
T&D Operations Control Centre - Electricity System Restoration Service Simulator/HiL
Start date:
Aug 2023
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Wet Weather Data for OHL Noise Predictions
Start date:
Jul 2023
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HyNTS 100% H2 Metering System
Start date:
Jul 2023
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Blending Infrastructure for the NTS
Start date:
Jul 2023
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Characterisation & Optimisation of Battery Banks in Substations (COBBS)
Start date:
Jul 2023
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Flex Heat Networks
Start date:
Jul 2023
End date:
Aug 2025
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Analysis of the Thermal Influence of Cable Surroundings (AnTICs)
Start date:
Sep 2023
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Repurposing Process for the NTS
Start date:
Jul 2023
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Improving the determination of safety and induced effects in earthing systems
Start date:
Sep 2023
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Use of Innovative Materials and Construction Techniques in the Substation Environment to Accelerate Transition to Net-Zero
Start date:
Sep 2023
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Pollution Monitoring
Start date:
Jul 2023
End date:
Mar 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
ExtenDER
Start date:
Aug 2023
End date:
Dec 2025
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2
Low Power Heat
Start date:
Aug 2023
End date:
May 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Composite membranes for H2 purification
Start date:
Aug 2023
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Near Real-time Data Access 2 (NeRDA 2)
Start date:
Aug 2023
End date:
Feb 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
VoltXpanse: Ultra high voltage onshore energy highway
Start date:
Oct 2023
End date:
Feb 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
CrystalClear - Lifecycle Analysis of SF6 Alternative Technologies and Crystal Formation Impacts
Start date:
Sep 2023
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Surge Arrestors Health Assessment by Monitoring Partial Discharge (SAHARA)
Start date:
Sep 2023
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Practical Transition into wider EMT GB Modelling
Start date:
Jul 2023
End date:
Mar 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2

Cyber Risk Impact Assessment (Cyber-RIAST)
Start date:
May 2024
End date:
Oct 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Sprayed Metal for Effecting Leaking Transformer Repairs (SMELTeR)
Start date:
Oct 2023
End date:
Feb 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Cable Oil DEcontamination by BaCteria (CODEC)
Start date:
Sep 2023
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HyNTS Pipeline Dataset - Database & Automated Assessment
Start date:
Sep 2023
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Headroom – Whole System Thinking
Start date:
Sep 2023
End date:
May 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Spotlight
Start date:
Oct 2023
End date:
Nov 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Low Voltage Power Quality (LVPQ)
Start date:
Oct 2023
End date:
May 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Regional Energy System Optimisation Planning (RESOP)
Start date:
Oct 2023
End date:
Oct 2025
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Homeshield
Start date:
Oct 2023
End date:
Aug 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Interaction of Megawatt e-Trucks with Transmission System (I-MeTTS)
Start date:
Nov 2023
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Visual Inspection and Condition Assessment Platform for OHL Steelwork 2 (VICAP 2)
Start date:
Nov 2023
End date:
Apr 2025
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Condition Assessment of Long Interconnected Cable Systems (CALICS)
Start date:
Dec 2023
End date:
Apr 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Enhanced RMS (e-RMS) models for stability assurance
Start date:
Oct 2023
End date:
Jul 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Asset Design for a Hydrogen Network
Start date:
Nov 2023
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

SMARTer selection of Automatic Sectionaliser links
Start date:
Dec 2023
End date:
Jun 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Domestic Hydrogen Safety Controls (HyBreak)
Start date:
Dec 2023
End date:
Oct 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Impact on NTS Valves & Maintenance
Start date:
Dec 2023
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Detailed Analysis of Transformer Ageing Mechanisms for Intelligent Estimation of Reliability - DATAMInER
Start date:
Jan 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Storm Triage
Start date:
Dec 2023
End date:
Mar 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2
Trading Connections: Exploring a novel approach to connections queues
Start date:
Feb 2024
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Optimise Fault Infeed
Start date:
Mar 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
SF6 Retro-Fill
Start date:
Jul 2024
End date:
Dec 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Development of Microgrids
Start date:
Feb 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
220kV Single Circuit Low Profile Design
Start date:
Mar 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Understanding the impact of Electromagnetic Fields from Interconnectors (BLUEFIN)
Start date:
Mar 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Knowledge Elicitation of Risks to Assets Under LightNing Impulse Conditions (KERAUnIC)
Start date:
Mar 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Anticipating Gas Insulation Leaks from Electrical assets – AGILE
Start date:
Mar 2024
End date:
Apr 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Battery to Bypass Constraints for Smart Local Energy (BBC)
Start date:
Feb 2024
End date:
Jun 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Robot, AI and Drone Enhanced Detection of Discharge (RAIDEDD)
Start date:
Apr 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Proof of Concept of Digitised Condition Monitoring
Start date:
Mar 2024
End date:
Aug 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Interconnected HV secondary substation battery monitor
Start date:
Mar 2024
End date:
Jun 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Electricity Transmission Heat Effects, Resilience Measures to Manage Asset Lifecycles (THERMAL)
Start date:
Mar 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HV Pinpoint
Start date:
Mar 2024
End date:
Oct 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
HOMEflex (Household or Microbusiness Energy Flexibility) Compliance
Start date:
Mar 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2
Active Fault Level Management (AFLM) ED-2
Start date:
Mar 2024
End date:
Jun 2025
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Real Time Fault Level Monitoring Stage 2 (ED-2)
Start date:
Mar 2024
End date:
Jun 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Environmentally Acceptable Wood Pole Pre-treatment Alternatives to Creosote (APPEAL) (ED-2)
Start date:
Apr 2024
End date:
Jun 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Purging approach for the NTS
Start date:
Apr 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

X-FacTOR Stage 2
Start date:
Jan 2025
End date:
Mar 2026
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2
LV De Mesh
Start date:
Apr 2024
End date:
Dec 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
HyNTS Operational Methodologies - Phase 1
Start date:
Apr 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Switchgear Requirements for Future Networks (ED-2)
Start date:
Apr 2024
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Community DSO
Start date:
Apr 2024
End date:
Apr 2028
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIC
Hydrogen Environment Testing of Girth Welds
Start date:
Apr 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
TOTEM (Transmission Owner Tools for EMT Modelling) 2
Start date:
May 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
LCT Harmonic Limits
Start date:
May 2024
End date:
May 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Innovation Highway
Start date:
May 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
PSR Resilience System (ED-2)
Start date:
Apr 2024
End date:
Jun 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Compact Substation (CoSub)
Start date:
May 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Tunnel power cables earthing, safety and protection under electromagnetic transient voltages and currents (TunCab)
Start date:
May 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
intercompatible CAble REpair (iCARE)
Start date:
Apr 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HyNTS Weld T-Sections & Fittings
Start date:
May 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Causal Analysis of Balancing Costs
Start date:
Apr 2024
End date:
Oct 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Re-Heat: Enabling Renewable Heat (ED-2)
Start date:
May 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Hydrogen Blending: National Safety Evidence Review
Start date:
May 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Non-Intrusive Foundation Testing
Start date:
Jun 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
V2G Dynamic Headroom Control
Start date:
Jul 2024
End date:
Jan 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Alternative Jointing 2
Start date:
Jul 2024
End date:
Jun 2028
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Low Power Hot Water Phase II
Start date:
Jul 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
BISEP Live trial with LTS Futures (Phase 2)
Start date:
Jun 2024
End date:
Jul 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
International Evidence Gathering
Start date:
Jun 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Impact of Hydrogen on Gas Cleaning Assets
Start date:
Jul 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Oscillation and regional RoCoF monitoring
Start date:
Feb 2024
End date:
Feb 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

The Implication for the ESO of 24/7 Carbon Free Energy Trading
Start date:
May 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

High Security Control and Protection System
Start date:
Jul 2024
End date:
Jan 2026
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2
Hydrogen & Carbon Ready Electrical and Instrumentation Assets
Start date:
Jul 2024
End date:
Jul 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Investigating Coastal and Estuarine Climate Risks on Electricity Asset Management (ICECREAM)
Start date:
Jul 2024
End date:
Jan 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Use Case & Market Development of Superconducting Technologies
Start date:
Aug 2024
End date:
May 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Sustainable Drainage Systems (SuDS) for Hydrocarbons
Start date:
Sep 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
EcoBuild 3D: Sustainable Substation Foundations
Start date:
Sep 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Digital whole life carbon assessment (DgWLCA)
Start date:
Aug 2024
End date:
Aug 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Low Voltage – Active power Control Transformer (LV-ACT)
Start date:
Aug 2024
End date:
Oct 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Year Ahead Outage Optimiser (YAhOO)
Start date:
Sep 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Mass mobility data for demand forecasting
Start date:
Jul 2024
End date:
Jul 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2

Construction Planning Assumptions Methodology Review
Start date:
Mar 2024
End date:
Jun 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2

Fatigue of pipework at compressor sites
Start date:
Aug 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

NextGen Electrolysis – Producing Green Hydrogen from Contaminated Water
Start date:
Aug 2024
End date:
Jul 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Demand Diversification Service for LMAs Phase 2 – Commercial Trials
Start date:
Sep 2024
End date:
Aug 2025
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2
Virtual Energy System Data Sharing Infrastructure (DSI) Pilot
Start date:
Sep 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

OptiFLOW
Start date:
Sep 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
ALCHEM - (Advanced Low Carbon Hydrogen and Energy Management)
Start date:
Sep 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Neural BB
Start date:
Jun 2024
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Understanding Future Energy Loads from Data Centres
Start date:
Sep 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Internal Sharp Defect Burst Testing in Hydrogen
Start date:
Sep 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
SCADA Solutions for Hydrogen Networks (100% & Blends)
Start date:
Sep 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Blue Light
Start date:
Sep 2024
End date:
Feb 2026
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
HyNTS Variable Gas Blend Measurement System Development - Phase 2
Start date:
Oct 2024
End date:
Feb 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Systems Thinking Approach to Innovation Management
Start date:
Jul 2024
End date:
Jul 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Interventions for Hydrogen by Asset Group Phase 3
Start date:
Sep 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Impact of Hydrogen on NTS Polymer/ Elastomer Materials – Phase 2
Start date:
Oct 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Net Zero Service Termination 2 Project
Start date:
Oct 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
LCT Connections Readiness Indicator
Start date:
Oct 2024
End date:
Apr 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Consumer Building Blocks Phase 2
Start date:
Sep 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2

Thermal Analysis and Consequences of Thermosyphon Installations on Cable (TACTICS)
Start date:
Nov 2024
End date:
May 2027
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
RTSM - Phase 1 - Methodology Development
Start date:
Sep 2024
End date:
May 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
AImee
Start date:
Nov 2024
End date:
Nov 2026
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Electrification of the residential heat sector: Spatial and temporal analysis of electricity demand and flexibility
Start date:
Jun 2024
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Consumer Building Blocks Phase 2
Start date:
Sep 2024
End date:
May 2025
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2

AI for Visibility and Forecasting of Renewable Generation
Start date:
Oct 2024
End date:
Feb 2026
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2
Regional Dynamic Reserve Setting
Start date:
Sep 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

Grid Connection Simulator tool (GridConnectX)
Start date:
Oct 2024
End date:
Apr 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Hydrogen Blending Implementation Plan
Start date:
Oct 2024
End date:
Oct 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Smart Street Rural
Start date:
Nov 2024
End date:
Aug 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Electric Drive Opportunities for Hydrogen Compression
Start date:
Nov 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

ATEX Mechanical Ignition Risks
Start date:
Nov 2024
End date:
May 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Supporting Warm Spaces
Start date:
Sep 2024
End date:
Jun 2026
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Resilient Customer Response NIA
Start date:
Nov 2024
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Lined Rock Caverns for Flexible Hydrogen Storage
Start date:
Oct 2024
End date:
Jun 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Strategic Case for Tidal Range
Start date:
Sep 2024
End date:
May 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Power System Oscillation Characterisation using Wavelets and Trilateration
Start date:
May 2024
End date:
Nov 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

intercompatible CAble REpair (iCARE) 2
Start date:
Jan 2025
End date:
Jan 2027
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Multi-Gas Detection: Phase 2
Start date:
Oct 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Earth Friendly Concrete Trials – Tunnel Linings
Start date:
Jan 2025
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Delta Detect
Start date:
Nov 2024
End date:
Jun 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Gas Inhibitors for Hydrogen Pipelines
Start date:
Dec 2024
End date:
Jun 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Lessons Learnt: Phase Two
Start date:
Nov 2024
End date:
Aug 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
NTS Hydrogen Blending Management Approach
Start date:
Nov 2024
End date:
Jun 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Assessment of the MITS planning backgrounds
Start date:
Oct 2024
End date:
Oct 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Project GaIN
Start date:
Nov 2024
End date:
Apr 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
GERG HYdrogen Service Tightness Criteria
Start date:
Nov 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Visual Inspection and Condition Assessment Platform (VICAP3) - Bar by Bar
Start date:
Dec 2024
End date:
Mar 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
SHINE Non-Electric Boiler
Start date:
Nov 2024
End date:
Jul 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Pole Mounted Switchgear
Start date:
Dec 2024
End date:
Aug 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Hydrogen Storage in Aquifers
Start date:
Dec 2024
End date:
May 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Fibre Health Monitoring Phase 2
Start date:
Jan 2025
End date:
Aug 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
LV Predict II
Start date:
May 2024
End date:
Dec 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Safety Assessment of a Non-Distributed Gas GB Energy System and Usage
Start date:
Nov 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Accessible CO alarm (Phase 1)
Start date:
Jan 2025
End date:
Nov 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
AssetCool
Start date:
May 2025
End date:
May 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
BRIDGES - Building a Resilient and Intelligent Dynamic Grid Enhancement System
Start date:
Mar 2025
End date:
Sep 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Keeping Comms Open
Start date:
Jan 2025
End date:
Dec 2027
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
AQUILA LITE
Start date:
Dec 2024
End date:
Aug 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Intelligent Connections Explorer (ICE)
Start date:
Jan 2025
End date:
Sep 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2
GFM Interaction
Start date:
Jan 2025
End date:
Jun 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Power Wheels
Start date:
Feb 2025
End date:
Jul 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Framework for Risk Analysis and Modelling of Events (FRAME I)
Start date:
Jan 2025
End date:
Jun 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
On Boundary Enhanced LCT Integrating Service Cabinet (OBELISC)
Start date:
Jan 2025
End date:
Jun 2027
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Extreme Weather and Climate Modelling (Dunkelflaute)
Start date:
Jul 2024
End date:
Dec 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

SETTLE
Start date:
Jan 2025
End date:
Dec 2027
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Situational Awareness
Start date:
Dec 2024
End date:
Sep 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Rapid Evaluation Areal Connection Tool (REACT)
Start date:
Jan 2025
End date:
Dec 2025
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Hydrogen Plant Dynamic Models
Start date:
Dec 2024
End date:
Dec 2026
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2

AIDPS: Assessing the Impacts of DC Components from Power Electronic Devices and Geomagnetically Induced Currents
Start date:
Apr 2025
End date:
Feb 2027
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
CommsConnect
Start date:
Jan 2025
End date:
Mar 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Virtual Energy System Data Sharing Infrastructure (DSI) Pilot - SSEN-T Component
Start date:
Jan 2025
End date:
May 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Dynamic Pricing
Start date:
Feb 2025
End date:
Mar 2026
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2
Alternative approaches to the ORPS methodology
Start date:
Jan 2025
End date:
Jun 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

Volta: Real Time Prediction
Start date:
Jan 2025
End date:
Jan 2026
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2

Assessment of Alternative Approaches to setting NTCs
Start date:
Jan 2025
End date:
Jun 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Future Operator Console: Optimised Visualisations
Start date:
Sep 2024
End date:
Sep 2026
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

LV Futures
Start date:
Feb 2025
End date:
Aug 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Data-Driven Oscillation Tracing
Start date:
Apr 2024
End date:
Apr 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

System Short Circuit Tests
Start date:
Feb 2025
End date:
Mar 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Volta – Qualitative Benchmarking and Impact Analysis for Future Dispatching Tools and Capabilities
Start date:
Mar 2025
End date:
Sep 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

Impact of New Technology HGVs
Start date:
Feb 2025
End date:
Nov 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Overhead Line Wind Speed Monitoring
Start date:
Mar 2025
End date:
Aug 2026
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Track to Zero
Start date:
Mar 2024
End date:
Mar 2025
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Environmentally Acceptable Wood Pole Pre-treatment Alternatives to Creosote (APPEAL)
Start date:
Mar 2016
End date:
May 2025
Funding mechanism:
- Network Innovation Allowance
Customer Safeguarding Virtual Training Platform
Start date:
Jun 2023
End date:
Apr 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Predictive Safety Interventions - Beta
Start date:
Aug 2023
End date:
Feb 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Beta - Round 1
INCENTIVE - Innovative Control and Energy Storage for Ancillary Services in Offshore Wind
Start date:
Jul 2023
End date:
Oct 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Beta - Round 1
Network-DC Circuit Breakers
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Alpha - Round 1
INCENTIVE – Innovative control and energy storage for ancillary services in offshore wind
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Alpha - Round 1
HyNTS Deblending for Transport Applications
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 1

Gas System of the Future Digital Twin
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 1
Predictive Safety Interventions - Alpha
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 1
Intelligent Gas Grid - Alpha
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 1
Velocity Design with Hydrogen – Alpha
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 1
HyNTS Compression
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Alpha - Round 1

HyNTS Pipeline Dataset
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 1

HyNTS Protection
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 1

Crowdflex: Alpha
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Alpha - Round 1

Digital Platform for Leakage Analytics – Alpha Round 1
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 1
Thermal Imagery Analysis
Start date:
Nov 2022
End date:
May 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 1
A Holistic Hydrogen Approach to Heavy Duty Transport (H2H) - Alpha
Start date:
Aug 2022
End date:
Feb 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 1
Predict4Resilience (P4R) - Alpha
Start date:
Aug 2022
End date:
Feb 2023
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 1
Heat Balance - Alpha
Start date:
Aug 2022
End date:
Feb 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 1
Eye in the Sky – Utilising satellite data to improve grid resilience
Start date:
Aug 2022
End date:
Feb 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 1
SCADENT - SuperConductor Applications for Dense Energy Transmission
Start date:
Aug 2022
End date:
Feb 2023
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Alpha - Round 1
Local Energy Oxfordshire - Neighbourhoods, (LEO-N); Alpha R2
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Planning Regional Infrastructure in a Digital Environment (PRIDE)
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 2
SIF Black Start Demonstrator from offshore wind (SIF BLADE)
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
RetroMeter Alpha
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Alpha - Round 2
NIMBUS
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Alpha - Round 2
INSIGHT - Innovative Network Status Intelligence Gathered by Holistic use of Telemetry
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Net Zero Terrace Alpha
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
REACT – Rapid Evaluation Areal Connection Tool
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Scenarios for Extreme Events - Alpha
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2

Powering Wales Renewably - Alpha
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 2

Digital Inspector Alpha R2
Start date:
Sep 2023
End date:
Mar 2024
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 2
D-Suite
Start date:
Jan 2024
End date:
Jul 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
NextGen Electrolysis - Wastewater to Green Hydrogen
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
SF6 Whole Life Strategy
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Diversified Flexible Queue Management
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Alpha - Round 2
HyNTS Hybrid Storage
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2

VIVID - Vulnerability Identification Via Informative Data (Alpha R2)
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- SIF Alpha - Round 2
Artificial Forecasting
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Alpha - Round 2
HyNTS Waste Heat Recovery for Electrolysis
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2

Inform
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Whole Energy System Resilience Vulnerability Assessment (WELLNESS)
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Alpha - Round 2
HyCoRe (Alpha)
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Guidelight
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- SIF Alpha - Round 2
CREDO+
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Alpha - Round 2
SHIELD - Smart Heat and Intelligent Energy in Low-Income Districts
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Trinity
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Alpha - Round 2
Park and Flex
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Indus
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Heat Risers
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Lightspeed
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Alpha - Round 2
Watt Heat
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Alpha - Round 2
Heatropolis
Start date:
Oct 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Alpha - Round 2
Full Circle
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
Connectrolyser
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Alpha - Round 2
CommsConnect
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Alpha - Round 2
Hy-Fair - Alpha
Start date:
Oct 2023
End date:
Apr 2024
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- SIF Alpha - Round 2
HyNTS Compression
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

Nuclear Net Zero Opportunities (N-NZO)
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

Green Hydrogen Injection into the NTS
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

HyNTS Deblending
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

Ch4rge Emissions Reduction
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

Hydrogen Barrier Coatings for Gas Network Assets
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

Gas Networks Interoperable Digital Twin
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

HyPark
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF - Discovery
HyNTS Pipeline DataSet
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

Gas Analyser Systems for Hydrogen Blends
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

Hydrogen Metering
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

Excess Gas Turbine Energy Generation
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF - Discovery
CEV: Critical factors for the adoption of smart homes for energy efficiency and implications for consumers and providers
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF - Discovery
Thermal imagery analysis - Condition assessment fluid and pressure
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery
Rail Decarbonisation Planning
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery
Multimodal Hydrogen Transport Refuelling Study
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery
Network-DC Circuit Breakers
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF - Discovery
INCENTIVE - Innovative Control and Energy Storage for Ancillary Services in Offshore Wind
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF - Discovery
NIMBUS - Network Innovation and Meteorology to Build for Sustainability
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF - Discovery
CrowdFlex: Discovery
Start date:
Apr 2022
End date:
Jun 2022
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF - Discovery

Virtual Energy System
Start date:
Apr 2022
End date:
Jun 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery

Digi-GIFT
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF - Discovery
EN-twin-e
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF - Discovery
Predict4Resilience
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF - Discovery
Flexible Heat
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery
HEAT BALANCE
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery
A Holistic Hydrogen Approach to Heavy Duty Transport (H2H)
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery
Resilient and Flexible Multi-Energy Hub Networks for Integrated Green Mobility
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery
Asset Reuse and Recovery Collaboration (ARRC)
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery
Fast Flex
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF - Discovery
Digital Twin - Exploring the societal, operational, and cross industry whole system benefits on the Gas Distribution Network
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF - Discovery
Digital Twins: Exploring the commercial, societal and operational benefits on green hydrogen projects
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF - Discovery
Predictive Safety Interventions
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF - Discovery
Intelligent Gas Grid
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF - Discovery
Velocity Design with Hydrogen
Start date:
Feb 2022
End date:
Apr 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery
NAVIGATION
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF - Discovery
Eye in the Sky - Application of satellite data to improve grid resilience
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF - Discovery
SEGIL - Sustainable Electrical Gas Insulated Lines
Start date:
Mar 2022
End date:
May 2022
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF - Discovery
SCADENT - Super Conductor Applications for Dense Energy Transmission
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF - Discovery
Digital Platform for Leakage Analytics – Discovery Phase
Start date:
Mar 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF - Discovery
Planning Regional Infrastructure in a Digital Environment (PRIDE)
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF - Discovery
EV Respond
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- SIF Discovery - Round 2
Proportional Investment Of Networks in Energy Efficiency Retrofit (PIONEER)
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF - Discovery
TEED (Tyseley Environmental Enterprise District)
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF - Discovery
SYSMET - SYstem Strength Measurement and EvaluaTion
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
BluePrint - Building Industry Collaboration and Methodologies for Developing Offshore Wind Behind Constraint
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 3
REVISE - Revisiting and Evaluating Environmental Inputs on Line Ratings
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
Hydrogen Storage in Aquifers
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
Regional Energy Strategic Modelling (RESM) Discovery
Start date:
Mar 2024
End date:
May 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Discovery - Round 3
Production And long-Term Containment of Hydrides (PATCH) Discovery
Start date:
Mar 2024
End date:
May 2024
Status:
Live
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Discovery - Round 3
Network Security in a Quantum Future
Start date:
Mar 2024
End date:
May 2024
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 3

Probabilistic Pathways for Energy System Planning
Start date:
Mar 2024
End date:
May 2024
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 3

Rural Energy and Community Heat (REACH)
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Discovery - Round 3
Road to Power
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Discovery - Round 3
Carbon and Hydrogen Transportation to SAF production facilities
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3

HyNTS Maritime
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3

B-Linepack+
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3

CoolDown
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
LDES NODE – Long Duration Energy Storage for Network Optimisation, Decarbonisation, and Efficiency
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
Gas Volume for Embedded ElectricalGeneration Modelling
Start date:
Mar 2024
End date:
May 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Discovery - Round 3
Exploring Geological Hydrogen Storage Opportunities for the East Midlands (EMStor) - Discovery
Start date:
Apr 2024
End date:
Jul 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
HIRE - Hybrid Network Improvement and Reliability Enhancement
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 3
Fractal Flow
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 3
LV Optimiser - LVOE
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
EquiFlex
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Discovery - Round 3
Carbon Flex
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- SIF Discovery - Round 3
Data Mate
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 3
Wayl-ease
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Discovery - Round 3
Balancer
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- SIF Discovery - Round 3
Flex Direct
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- SIF Discovery - Round 3
SizeWise
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Discovery - Round 3
Community Led Integrated Planning (CLIP)
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- SIF Discovery - Round 3
HeatNet
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Discovery - Round 3
OptiHeat
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
KnowMyFlex
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Discovery - Round 3
SeaChange
Start date:
Mar 2024
End date:
May 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
WASH
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Discovery - Round 3
Electric Thames
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Discovery - Round 3
Fuel Cell Renewable Energy Equity (FREE)
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
Gridlink
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
SANND (Scenario Analysis for Non Domestic Network Decarbonisation)
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Discovery - Round 3
Cross Vector Energy Hub
Start date:
Mar 2024
End date:
Jun 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Discovery - Round 3
Nature4Networks (R3 Discovery)
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
UN:LOCK - Unblocking Networks: Local Optimisation, Consumers and Knowledge
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
ALCHEM (Advanced Low Carbon Hydrogen and Energy Management)
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3
Look NortH2
Start date:
Mar 2024
End date:
May 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3

MaxFlex
Start date:
Mar 2024
End date:
Jun 2024
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- SIF Discovery - Round 3
Realistic modelling of power-to-gas operability
Start date:
Mar 2024
End date:
May 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 3

REACT
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
INSIGHT (Innovative Network Status Intelligence Gathered by Holistic use of Telemetry and Simulation)
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
SECURE - Securing the future delivery of all HVDC projects by de-risking the HVDC cable supply chain
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Discovery - Round 2
Electrolyser Improvements driven by Waste Heat Recovery
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Discovery - Round 2

Hybrid Storage Systems for site safety and efficiency
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2

Supply Chain Resilience in the Transition
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2

REWIRE (REsidential Whole system Integrated REsilience)
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Discovery - Round 2
RetroMeter
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Net Zero Terrace
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Hy-Fair
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- SIF Discovery - Round 2
Distribution Network Information Modelling (DNIM)
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 2
Looking-Glass
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 2
Calfacto Latent Energy
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Net Zero Community Energy Hubs
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Carnot Gas Plant
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Lightspeed
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
SHIELD - Smart Heat and Intelligent Energy in Low-Income Districts
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
CReDo+ Climate Resilience Demonstrator (extension to new climate risks)
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 2
CommsConnect
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Discovery - Round 2
Connectrolyser
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Full Circle
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Discovery - Round 2
Guidelight
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- SIF Discovery - Round 2
Heatropolis
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Discovery - Round 2
Indus
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Power Block
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Discovery - Round 2
Trinity
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Discovery - Round 2
WARN (Weather Alerts and Risk analysis for Network operators)
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Discovery - Round 2
Watt Heat
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Discovery - Round 2
Heat Risers
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Park & Flex
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Discovery - Round 2
Scenarios for Extreme Events
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- SIF Discovery - Round 2

Powering Wales Renewably
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 2

D-Suite
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Inform
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 2
Diversified Flexible Queue Management
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Discovery - Round 2
Artificial Forecasting
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 2
NextGen Electrolysis - Wastewater to Green Hydrogen
Start date:
Apr 2023
End date:
Jun 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Resilient Customer Response
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- SIF Discovery - Round 2
Integrated Hydrogen Transport Hubs
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Digital Inspector
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- SIF Discovery - Round 2
Local Energy Oxfordshire – Neighbourhoods (LEO-N)
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Dynamic Networks
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Discovery - Round 2
VIVID - Vulnerability Identification Via Informative Data
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- SIF Discovery - Round 2
Whole Energy System Resilience Vulnerability Assessment (WELLNESS)
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- SIF Discovery - Round 2
SIF Black Start Demonstrator from offshore wind (SIF BLADE)
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
SCOHL
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
HyCoRe - Hydrogen Cost Reduction
Start date:
Apr 2023
End date:
Jun 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
SF6 Whole life strategy
Start date:
Apr 2023
End date:
Jul 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- SIF Discovery - Round 2
Shifting Currents
Start date:
Apr 2023
End date:
Jul 2023
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- SIF Discovery - Round 2
EPRI Research Collaboration on Electric & Magnetic Fields Health & Safety (P60) 2016
Start date:
Jan 2016
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
400kV Synthetic Ester Filled Transformer Pilot Project
Start date:
Jul 2013
End date:
Jul 2014
Funding mechanism:
- Network Innovation Allowance
Alternative Bus Bar Protection Solution
Start date:
Mar 2011
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Composite Cross-Arms Study
Start date:
Jun 2008
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Investigation of Aeolian Insulator Noise
Start date:
May 2014
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Cost effective removal of conductor crossing clearance constraints
Start date:
Nov 2016
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Cable Installation Design & Innovation Project (CIDIP)
Start date:
Oct 2013
End date:
Nov 2016
Funding mechanism:
- Network Innovation Allowance
Impact of HVDC Cable Operation on Telecommunication Lines
Start date:
Apr 2014
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Decarbonisation vision for South Wales
Start date:
Nov 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
The application of Parametric Design to automate substation development
Start date:
Aug 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
UltraWire
Start date:
Aug 2013
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
Predicting Vibration Fatigue for Overhead Line Conductor Systems
Start date:
Jul 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Design of a smart tool for detecting hidden errors in protection setting files
Start date:
Sep 2011
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Investigation into the Properties and Behaviour of Liquid Soil (LS) Technology
Start date:
Sep 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
HVDC EngD – Richard Poole
Start date:
Mar 2012
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
No Power Hot Water Phase 2
Start date:
Jun 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Enhanced AC and DC safety voltage limits assessment
Start date:
Oct 2013
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Overhead Lines (P35) 2017
Start date:
Jan 2017
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Rating Impact of Non-isothermal Ground Surface (RINGS)
Start date:
Apr 2012
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Potentials and profiles around earth electrodes and opposite-side injection for large-area earthing
Start date:
Jan 2012
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Substations
Start date:
Sep 2015
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Oil/Paper Insulation HVDC Performance
Start date:
Oct 2010
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Unlocking Transmission Transfer Capacity
Start date:
May 2018
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
Increasing Transmission Boundary Power Flows using an Active Power Control Unit
Start date:
Dec 2018
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
Harmonic compliance management
Start date:
Sep 2018
End date:
Sep 2019
Funding mechanism:
- Network Innovation Allowance
Flexible rating options for DC operation
Start date:
Jan 2012
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Partial discharge monitoring of DC cable (DCPD)
Start date:
Nov 2012
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Simulation of multi-terminal VSC HVDC system by means of Real Time Digital Simulation (RTDS)
Start date:
Oct 2011
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Substations
Start date:
Apr 2013
End date:
Jul 2015
Funding mechanism:
- Network Innovation Allowance
RESNET
Start date:
Sep 2011
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Live Line Working Equipment
Start date:
Aug 2010
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
Optimised Location for Surge Arresters on the Transmission Network
Start date:
Sep 2012
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Transformer Oil Passivation and Impact of Corrosive Sulphur (TOPICS)
Start date:
Oct 2011
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Feasibility study on suitability of protection policy for future energy scenarios
Start date:
Mar 2015
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Noise Assessment of ACCR Conductor
Start date:
Feb 2014
End date:
Nov 2016
Funding mechanism:
- Network Innovation Allowance
Firefly
Start date:
Jun 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Advanced Line Rating Analysis (ALiRA)
Start date:
Jul 2018
End date:
Jul 2020
Funding mechanism:
- Network Innovation Allowance
CSE fault analysis by 3D monitoring
Start date:
Aug 2018
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
Development of a Universal Bushing
Start date:
Sep 2017
End date:
Sep 2019
Funding mechanism:
- Network Innovation Allowance
HyNet Expansion Options
Start date:
Apr 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Substation Time Synchronisation to Safeguard the Network
Start date:
Nov 2018
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
Assessment of Wireless Technologies in a Substation Environment
Start date:
Jan 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Energy Highways
Start date:
Aug 2018
End date:
Mar 2020
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Information and Communication Technology
Start date:
Jan 2018
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
ACE (Advanced Condensing Exchanger) – Phase 2
Start date:
Mar 2019
End date:
Oct 2020
Funding mechanism:
- Network Innovation Allowance
Hydrogen Deblending in the GB Gas Network
Start date:
Jan 2020
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance

Bolt Integrity
Start date:
Jan 2018
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance
Introduction of Environmentally Friendly Alternatives to SF6
Start date:
May 2016
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance
Hydrogen blending - Optimisation of the commercial regime
Start date:
Feb 2020
End date:
Oct 2020
Funding mechanism:
- Network Innovation Allowance
Development of a lone working device, incorporating satellite communications and fall detection.
Start date:
Apr 2017
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
Transient Recovery Voltage Investigation
Start date:
Dec 2018
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Reducing Energy Losses from Transmission Substations
Start date:
Jan 2017
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Risk Assessment Methodologies for Pipelines & AGIs 2019/20
Start date:
Jun 2020
End date:
Jun 2021
Funding mechanism:
- Network Innovation Allowance

PhotonFix 4A - preparation for field trials
Start date:
Mar 2019
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
Distributed Storage & Solar Study (DS3)
Start date:
Aug 2016
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
Smart Network Design Methodologies
Start date:
Feb 2018
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
Pollywood - Alternative wooden pole system for OHL
Start date:
Mar 2016
End date:
Sep 2019
Funding mechanism:
- Network Innovation Allowance
Geospatial PV Mapping
Start date:
May 2017
End date:
May 2018
Funding mechanism:
- Network Innovation Allowance
Constraint Based Optimisation Solution: Network Reinforcement
Start date:
Mar 2019
End date:
Dec 2019
Funding mechanism:
- Network Innovation Allowance
High Volume Gas Escapes Toolbox - Stage 2
Start date:
Mar 2019
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
The future of heat - a decade to make a difference
Start date:
Oct 2019
End date:
Jan 2020
Funding mechanism:
- Network Innovation Allowance
Cryogenic Pipeline Cracking Technology
Start date:
Oct 2018
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance
VOLL 2
Start date:
Nov 2018
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance
Bridgend Future Modelling Phase 4 – Economic Case For Hybrid Heating
Start date:
Feb 2019
End date:
Sep 2019
Funding mechanism:
- Network Innovation Allowance
Optimisation of weather data to improve energy forecasting
Start date:
May 2018
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance

Virtual Synchronous Machine (VSM) Demonstrator
Start date:
Jan 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance

Remote Site Monitoring Device
Start date:
Mar 2017
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance
Real Time Thermal Ratings – Cables
Start date:
Jun 2018
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
OHL Fault Location Concept and Directional Earth Fault Passage Indication
Start date:
May 2016
End date:
May 2019
Funding mechanism:
- Network Innovation Allowance
SYNAPS Fault Detection, Classification & Location Solution
Start date:
Jun 2018
End date:
Dec 2019
Funding mechanism:
- Network Innovation Allowance
Timed Connection Software Development
Start date:
May 2018
End date:
Mar 2020
Funding mechanism:
- Network Innovation Allowance
Development of Oil-filled Cable Additive- Phase 2
Start date:
Nov 2017
End date:
Dec 2019
Funding mechanism:
- Network Innovation Allowance
LoadShare
Start date:
Sep 2017
End date:
Jan 2020
Funding mechanism:
- Network Innovation Allowance
Detection of Broken/Low Hanging Overhead Line Conductors
Start date:
Feb 2014
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
Deep Excavation Load Analysis
Start date:
Mar 2019
End date:
Feb 2020
Funding mechanism:
- Network Innovation Allowance
Dual Fuel Transport
Start date:
Sep 2018
End date:
Jan 2020
Funding mechanism:
- Network Innovation Allowance
Voltage source converter based series controlled impedance technology
Start date:
Sep 2018
End date:
May 2019
Funding mechanism:
- Network Innovation Allowance
VSC-HVDC Model Validation and Improvement (iCASE)
Start date:
Sep 2015
End date:
Sep 2019
Funding mechanism:
- Network Innovation Allowance
Regional Future Energy Scenarios
Start date:
Nov 2018
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
Safe Removal of Concrete from Underground Assets
Start date:
Nov 2019
End date:
Feb 2020
Funding mechanism:
- Network Innovation Allowance
Development of Tools for the Assessment and Control of Impressed Voltage
Start date:
May 2017
End date:
Nov 2018
Funding mechanism:
- Network Innovation Allowance
Travelling Wave Fault Locator Trial
Start date:
Feb 2016
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
EPRG (European Pipeline Research Group) 2019
Start date:
Jun 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance

Mathematical Baseline and Error Detection Techniques for the Analysis of Unaccounted For Gas (UAG).
Start date:
Apr 2017
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance

Smart SLG Phase 2
Start date:
Mar 2019
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
Transition to Dynamic Cable Rating Operation
Start date:
May 2018
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Secure AGI – Intrusion Detection System (IDS)
Start date:
Oct 2018
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance

Open Source SCADA Platform Phase 2
Start date:
Jun 2018
End date:
Feb 2020
Funding mechanism:
- Network Innovation Allowance

H21 – Strategic Modelling, Major Urban Centers
Start date:
Apr 2017
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
GQ Sample Line Assessment & Tech Watch
Start date:
Dec 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance

Hydrogen Injection into the NTS
Start date:
Sep 2019
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance

PRCI (Pipeline Research Council International) 2019
Start date:
Jun 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance

Non Destructive testing of welds using ultrasonic Time of Flight Diffraction Techniques (TOFD)
Start date:
Jun 2019
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance

Flow Loop Test for Hydrogen
Start date:
Jun 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance

Project Cavendish
Start date:
Mar 2019
End date:
Mar 2020
Funding mechanism:
- Network Innovation Allowance

Valve Care Toolbox 2
Start date:
Feb 2019
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance

Assessment and Creation of Novel PE Pipe Repair Systems
Start date:
Feb 2018
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance
Overpipe geogrid protection against third party damage
Start date:
Jul 2018
End date:
Jan 2020
Funding mechanism:
- Network Innovation Allowance

Introduction of 19 Bar PE Pipeline in the UK Gas Network
Start date:
Sep 2014
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance
PE Repairs Test Specification
Start date:
Jun 2019
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance
Easy Assist ECV
Start date:
Jun 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Flexible biomethane production using carboxylic acids
Start date:
Jan 2017
End date:
Jan 2020
Funding mechanism:
- Network Innovation Allowance
Higher chain alkane gases from Anaerobic Digestion
Start date:
Apr 2017
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
Pathfinder Plus
Start date:
Mar 2019
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
Industrial & Commercial Storage
Start date:
Aug 2016
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
CarConnect
Start date:
Apr 2016
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
Smart Energy Isles
Start date:
Jan 2018
End date:
Dec 2019
Funding mechanism:
- Network Innovation Allowance
Next Generation Wireless Telecoms Analysis
Start date:
Sep 2018
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
Network Islanding Investigation
Start date:
Jan 2019
End date:
Feb 2020
Funding mechanism:
- Network Innovation Allowance
LV Connect & Manage
Start date:
Apr 2016
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
LV Sensitive Earth Fault Protection
Start date:
Mar 2018
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance
Losses Investigation
Start date:
Apr 2015
End date:
May 2019
Funding mechanism:
- Network Innovation Allowance
Entire
Start date:
Jun 2016
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
CADET (Curtailment and Dispatch Estimation Toolkit)
Start date:
Oct 2018
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
Remote Asset INertial Monitoring & Alerting Network (RAINMAN)
Start date:
Jul 2016
End date:
Mar 2020
Funding mechanism:
- Network Innovation Allowance
Virtual World Asset Management
Start date:
Apr 2015
End date:
Feb 2018
Funding mechanism:
- Network Innovation Allowance
Review of Pipeline Girth Weld Inspection
Start date:
Oct 2018
End date:
May 2019
Funding mechanism:
- Network Innovation Allowance
Interoperable LV Automation – Stage 1
Start date:
Sep 2016
End date:
May 2018
Funding mechanism:
- Network Innovation Allowance
Social Constrained Managed Zones (CMZs)
Start date:
Mar 2019
End date:
Dec 2019
Funding mechanism:
- Network Innovation Allowance
SIARA - System Integrity and Restorative Actions
Start date:
May 2018
End date:
Aug 2019
Funding mechanism:
- Network Innovation Allowance
Automated Pipeline BIM Modelling and Cost Estimating Tool – Stage 2
Start date:
Mar 2018
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
Multi-Occupancy Building Cured In Place Lining (NuFlow): Further Development of Technology for Gas Distribution Riser Systems
Start date:
Apr 2018
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
Smart Tester – MP applications
Start date:
Jul 2018
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
HyNet Motion; Optimising Network Delivery of Hydrogen for Vehicle Transport
Start date:
Sep 2018
End date:
Sep 2019
Funding mechanism:
- Network Innovation Allowance
Stent Bag
Start date:
Nov 2013
End date:
Mar 2020
Funding mechanism:
- Network Innovation Allowance
PE Flowstop (up to 10bar(g))
Start date:
May 2016
End date:
Dec 2016
Funding mechanism:
- Network Innovation Allowance
Reuse of Existing Concrete Assets
Start date:
Jul 2016
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Peak Power Forecast
Start date:
Nov 2019
End date:
Feb 2020
Funding mechanism:
- Network Innovation Allowance
East Neuk – A Techno Economic Study into the Energy System
Start date:
Feb 2019
End date:
Aug 2019
Funding mechanism:
- Network Innovation Allowance
Assessing the Gas Network Decarbonisation Pathway
Start date:
Feb 2019
End date:
Jan 2020
Funding mechanism:
- Network Innovation Allowance
Distribution Network Information Modelling – Stage 1
Start date:
Mar 2019
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance
Domestic Carbon Capture
Start date:
Oct 2018
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
Incident Management (Stage 2 - Phase 2)
Start date:
Jan 2019
End date:
Aug 2019
Funding mechanism:
- Network Innovation Allowance
Feasibility study into 2% hydrogen blending at St Fergus and H2 pipeline and hub at Aberdeen
Start date:
Oct 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Composite Repairs to Complex Shapes
Start date:
Mar 2017
End date:
Dec 2019
Funding mechanism:
- Network Innovation Allowance
MEG Fogger Phase 5
Start date:
Jan 2017
End date:
Mar 2020
Funding mechanism:
- Network Innovation Allowance
Hybrid Grid Forming Converter
Start date:
Nov 2018
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance

Oxford Flow Optimised Pressure Reducing Station
Start date:
Sep 2016
End date:
Sep 2019
Funding mechanism:
- Network Innovation Allowance
Mechanical Purge End Fitting
Start date:
Mar 2017
End date:
Mar 2020
Funding mechanism:
- Network Innovation Allowance
ERS Module Regulator Conversion Phase 1
Start date:
Nov 2018
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
Foam Annular Sealant for Keyhole
Start date:
Jan 2019
End date:
Jan 2020
Funding mechanism:
- Network Innovation Allowance
No Power Hot Water Feasibility
Start date:
Jan 2020
End date:
Mar 2020
Funding mechanism:
- Network Innovation Allowance
Management of Brittle Plastic Materials
Start date:
Jan 2018
End date:
Mar 2020
Funding mechanism:
- Network Innovation Allowance
Dark Data Regulator Maintenance
Start date:
Oct 2019
End date:
Jan 2020
Funding mechanism:
- Network Innovation Allowance
33kV Superconducting Fault Current Limiter
Start date:
Jan 2010
End date:
Jun 2013
Funding mechanism:
- LCNF Tier 1
Compounded Factors
Start date:
Aug 2019
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
Real Time Fault Level Monitoring (RTFLM) - Stage 1
Start date:
Jan 2017
End date:
Sep 2019
Funding mechanism:
- Network Innovation Allowance
DISCERN Knowledge Transfer
Start date:
Feb 2013
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance
PPE Fabric Discovery
Start date:
Nov 2018
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
Phased Array Phase 3
Start date:
Feb 2019
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
Gas Demand Forecast - Phase 3 - Hydrogen
Start date:
Jul 2019
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
Internal Joint Repairs
Start date:
Apr 2019
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
MyDart - Digital asset records tool
Start date:
Dec 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Integrated Graphene Based Pre-heating System phase 2
Start date:
Jan 2019
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
Syphon Waste Water Remediation
Start date:
Feb 2017
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
Making every contact count – Enhancing protocols for disconnection and condemning ‘in-house’ applian
Start date:
Jun 2016
End date:
Dec 2019
Funding mechanism:
- Network Innovation Allowance
Alternative Gas pinpointing phase 2
Start date:
Feb 2019
End date:
Oct 2019
Funding mechanism:
- Network Innovation Allowance
Applied Integrated Vegetation Management
Start date:
Jan 2016
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Transition to low voltage DC distribution networks – Phase 1
Start date:
Mar 2018
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Overhead Line Vibration Monitoring System
Start date:
Nov 2015
End date:
Nov 2019
Funding mechanism:
- Network Innovation Allowance
UK-wide wind power: Extreme and Variability
Start date:
Aug 2012
End date:
May 2014
Funding mechanism:
- Network Innovation Allowance

Modelling of Embedded Generation within Distribution Networks and Assessing the Impact
Start date:
Aug 2012
End date:
Aug 2014
Funding mechanism:
- Network Innovation Allowance

Quantifying benefits and risks of applying advanced network control and demand response technologies
Start date:
Oct 2010
End date:
Oct 2013
Funding mechanism:
- Network Innovation Allowance

Impact of extreme events on power production at the scale of a single wind-farm
Start date:
Jan 2013
End date:
Jul 2014
Funding mechanism:
- Network Innovation Allowance

Optimising the operation of an integrated DC link within an AC system (ICase Award)
Start date:
Oct 2011
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance

A Combined Approach to Wind Profile Prediction
Start date:
Sep 2011
End date:
Sep 2015
Funding mechanism:
- Network Innovation Allowance

Seconomics - Digital Risk and Cyber Security
Start date:
Apr 2012
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance

Mathematics of Balancing Energy Networks Under Uncertainty
Start date:
Jan 2012
End date:
Jul 2015
Funding mechanism:
- Network Innovation Allowance

Scalable Computational Tools and Infrastrucutre for Interoperable and Secure Control of Power System
Start date:
Oct 2012
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance

Protection and Fault Handling in Offshore HVDC Grids
Start date:
Jul 2012
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance

UK Regional Wind: Extreme behaviour and predictability
Start date:
Aug 2013
End date:
Aug 2015
Funding mechanism:
- Network Innovation Allowance

Visualization of Renewable Energy Models
Start date:
Oct 2013
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance

Development of Dynamic Demand Models in DIgSILENT PowerFactory
Start date:
May 2014
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance

Reactive Power Exchange Application Capability Transfer (REACT)
Start date:
May 2013
End date:
May 2015
Funding mechanism:
- Network Innovation Allowance

Enhanced Weather Modeling for Dynamic Line rating (DLR)
Start date:
Aug 2013
End date:
Aug 2016
Funding mechanism:
- Network Innovation Allowance

Control and Protection Challenges In Future Converter Dominated Power Systems
Start date:
Oct 2013
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance

Electricity Demand Archetype Model 2
Start date:
Nov 2013
End date:
Nov 2014
Funding mechanism:
- Network Innovation Allowance

Facilitating Enhanced Network Capacity Evaluation
Start date:
Nov 2013
End date:
Aug 2014
Funding mechanism:
- Network Innovation Allowance

Industrial and Commercial Gas & Electric Scenario Modeling
Start date:
Nov 2013
End date:
Nov 2014
Funding mechanism:
- Network Innovation Allowance

Project Samuel - Grid Data and Measurement Systems
Start date:
Dec 2013
End date:
Jun 2015
Funding mechanism:
- Network Innovation Allowance

Improving cyber security culture within operational areas
Start date:
Jan 2016
End date:
Jan 2020
Funding mechanism:
- Network Innovation Allowance

Evolution of Energy Storage and Demand Management Services.
Start date:
Apr 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance

Solar PV Forecasting Phase 1
Start date:
Apr 2016
End date:
Apr 2018
Funding mechanism:
- Network Innovation Allowance

Solar PV Forecasting Phase 2
Start date:
Jul 2016
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance

Transient Voltage Stability of Inverter Dominated Grids and Options to Improve Stability
Start date:
Jun 2016
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance

WI-POD- Wind turbine control Interaction with Power Oscillation Damping control approaches.
Start date:
Jun 2016
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance

SIM - Samuel Inertia Element
Start date:
Aug 2016
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance

Project DESERT (hybrid battery and solar enhanced frequency control)
Start date:
Sep 2016
End date:
Mar 2018
Funding mechanism:
- Network Innovation Allowance

Vector Shift Initial Performance Assessment
Start date:
Feb 2017
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance

EPRI Research Collaboration on Grid Operations and Control
Start date:
Apr 2013
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance

Above Ground Crossing Inspection Mapping
Start date:
Oct 2018
End date:
Aug 2019
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Information and Communication Technology.
Start date:
Apr 2013
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance

Clustering effects of major offshore wind developments
Start date:
Apr 2014
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance

Investigation of sub-synchronous between wind turbine generators and series capacitors
Start date:
Mar 2014
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance

iTesla
Start date:
Apr 2010
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance

Granular Voltage Control (GVC)
Start date:
Apr 2014
End date:
Dec 2014
Funding mechanism:
- Network Innovation Allowance

PV Monitoring: Phase 1
Start date:
Apr 2014
End date:
Oct 2014
Funding mechanism:
- Network Innovation Allowance

Assessment of Distributed Generation Behaviour during Frequency Disturbances
Start date:
Apr 2014
End date:
Feb 2015
Funding mechanism:
- Network Innovation Allowance

Integrated electricity and gas transmission network operating model (ICASE Award)
Start date:
Oct 2012
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance

Smart Grid Forum Work Stream 7
Start date:
Jul 2014
End date:
Dec 2015
Funding mechanism:
- Network Innovation Allowance

Open Source Interconnector Modelling: Phase 1
Start date:
Dec 2014
End date:
Jun 2015
Funding mechanism:
- Network Innovation Allowance

DNO Investigation into Voltage Interaction and Dependency Expectation (DIVIDE)
Start date:
Apr 2015
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance

Black Start Alternative Approaches
Start date:
Mar 2015
End date:
Jun 2015
Funding mechanism:
- Network Innovation Allowance

Detection and control of inter-area oscillations (DACIAO)
Start date:
Oct 2015
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance

Transmission Network Topology Optimisation
Start date:
Sep 2015
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance

South East Smart Grids
Start date:
Aug 2015
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance

PV Monitoring Phase 2
Start date:
Aug 2015
End date:
Aug 2017
Funding mechanism:
- Network Innovation Allowance

Embedded cyber risks within the procurement process
Start date:
Jan 2016
End date:
Jan 2020
Funding mechanism:
- Network Innovation Allowance

SUSCABLE 2
Start date:
Jul 2014
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Development of GB electric vehicle charging profiles
Start date:
Dec 2018
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance

Situational Awareness Using Comprehensive Information
Start date:
Mar 2018
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance

Black Start Capabilities from Non-traditional Technologies
Start date:
Jan 2019
End date:
Aug 2019
Funding mechanism:
- Network Innovation Allowance

System Planning Methods, Tools, and Analytics
Start date:
Mar 2018
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance

Flexibility and Resource Adequacy for System Planning
Start date:
Mar 2018
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance

Risk-Based Analysis into Planning and Resiliency Processes
Start date:
Mar 2018
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance

Application of New Computing Technologies and Solution Methodologies in Grid Operations
Start date:
Mar 2018
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance

System Impacts of Embedded Storage (SIES)
Start date:
Mar 2018
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance

Phase Lock Loop-Related Improvements to Non-Synchronous Generation Models
Start date:
Feb 2018
End date:
Nov 2018
Funding mechanism:
- Network Innovation Allowance

Assessing the stability of small-scale inverter connected PV generation
Start date:
Aug 2017
End date:
Apr 2018
Funding mechanism:
- Network Innovation Allowance

GB Non-renewable Embedded Generation Forecasting Study
Start date:
Jun 2017
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance

Optimisation of Energy Forecasting - analysis of datasets of metered embedded wind and PV generation
Start date:
Jun 2017
End date:
Feb 2018
Funding mechanism:
- Network Innovation Allowance

Cable diagnostics for HVDC cables
Start date:
Jun 2016
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance
Alternative Preheat Solutions
Start date:
Oct 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Smart Data
Start date:
Sep 2012
End date:
Dec 2015
Funding mechanism:
- Network Innovation Allowance
Identify opportunities and developments in EMF Research (2016-2018)
Start date:
Apr 2016
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Electric Transportation (P18)
Start date:
Jan 2018
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
Measuring the Societal Impact of Network Activities
Start date:
Mar 2017
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
LTS Demand Forecasting Tool Scoping Study (Phase 1)
Start date:
Mar 2018
End date:
Aug 2018
Funding mechanism:
- Network Innovation Allowance
Development of Oil-filled Cable Additive
Start date:
Mar 2016
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
European Pipeline Research Group 2018
Start date:
Apr 2018
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance

Low Cost LV Substation Monitoring
Start date:
Mar 2016
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Management of plug-in vehicle uptake on distribution networks
Start date:
Mar 2016
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance
Gas demand forecasting – Phase 2
Start date:
Jun 2018
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance
Electricity and heat
Start date:
Jul 2016
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Combined CP and P remote monitor
Start date:
Jan 2017
End date:
Nov 2018
Funding mechanism:
- Network Innovation Allowance

Green City Vision
Start date:
Aug 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Permanent PE slab protection
Start date:
Nov 2016
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance

WATTS – Weather Analytics for The Transmission System
Start date:
Sep 2018
End date:
May 2019
Funding mechanism:
- Network Innovation Allowance
Development of a Risk Based Approach for Safe Control of Operations
Start date:
Oct 2016
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Automated Loop Restoration
Start date:
Jun 2015
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance
Aerial Imaging Research (AIR)
Start date:
May 2017
End date:
May 2019
Funding mechanism:
- Network Innovation Allowance

Feasibility of Risk based Network Planning
Start date:
Apr 2015
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
Hydrogen in the NTS – foundation research and project roadmap
Start date:
Nov 2018
End date:
May 2019
Funding mechanism:
- Network Innovation Allowance

Valve Pits Insulation
Start date:
Jul 2018
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance

Positioning ballistic screening on substation sites
Start date:
Dec 2018
End date:
Sep 2019
Funding mechanism:
- Network Innovation Allowance
Noise Mitigation Tool
Start date:
May 2017
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance

RUL Determination for Compressors 2
Start date:
Nov 2017
End date:
Jun 2019
Funding mechanism:
- Network Innovation Allowance

Future Of Gas Transportation Charging
Start date:
Feb 2019
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
>7 bar Permanent Leak Repair Clamps
Start date:
Oct 2016
End date:
Nov 2018
Funding mechanism:
- Network Innovation Allowance
Health Monitoring of cables using Acoustic Emission Measurement Techniques
Start date:
Sep 2018
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Network Damage Reporter
Start date:
Apr 2015
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
SMART GEO GRID
Start date:
Sep 2018
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Condition Monitoring of Circuit Breakers - iCASE
Start date:
Jun 2016
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
Risk Assessment and Modelling of Smart nEtwork Solutions (RAMSES)
Start date:
Oct 2017
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance
Whole-System Growth Scenario Modelling
Start date:
Oct 2017
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
Partial Discharge in HVDC Cables
Start date:
Aug 2018
End date:
Feb 2019
Funding mechanism:
- Network Innovation Allowance
Composite Core (ACCC) Inspection
Start date:
Dec 2016
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
System Two Assess and Seal System (STASS)
Start date:
Apr 2017
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
Activating Community Engagement (ACE)
Start date:
Apr 2015
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
Development of An Improved Distribution Load Estimates Methodology
Start date:
Apr 2015
End date:
Nov 2015
Funding mechanism:
- Network Innovation Allowance
Transformer Intrascope Phase 2
Start date:
Dec 2015
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
Improving Demand Forecasting
Start date:
Oct 2016
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
Phase Identification Unit to Assist in Underground Fault Location
Start date:
Feb 2018
End date:
May 2019
Funding mechanism:
- Network Innovation Allowance
Gas Quality Impacts on Industrial and Commercial applications
Start date:
Sep 2017
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
Carbon Portal
Start date:
Apr 2018
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Project REACH (Reaching Everyone and Connecting Homes)
Start date:
Jul 2018
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
FreeNonDom
Start date:
Jul 2018
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
Climate Change Impact Mapping
Start date:
Mar 2017
End date:
Jul 2020
Funding mechanism:
- Network Innovation Allowance
Power Transformer Real Time Thermal Rating
Start date:
Jun 2014
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Faraday Grid Deployment Trial
Start date:
Oct 2018
End date:
Oct 2021
Funding mechanism:
- Network Innovation Allowance
Detection and prevention of formation of Islands via SCADA.
Start date:
Jan 2016
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance
Enhanced Voltage Control
Start date:
Nov 2015
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance
Value of Lost Load to Customers
Start date:
Oct 2015
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance
Pole Current Indicator
Start date:
May 2017
End date:
Nov 2018
Funding mechanism:
- Network Innovation Allowance
DEDUCE (Determining Electricity Distribution Usage with Consumer Electronics)
Start date:
Oct 2017
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance
Harmonic Effect on Network Assets (HENA)
Start date:
Mar 2017
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
Assessment & Testing of Alternative Cut-outs
Start date:
Nov 2017
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
SF6 Alternatives
Start date:
May 2017
End date:
May 2019
Funding mechanism:
- Network Innovation Allowance
Pressurised Cable Active Control and Monitoring
Start date:
Sep 2015
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance
Smart Charging Architecture Roadmap
Start date:
Apr 2018
End date:
Feb 2019
Funding mechanism:
- Network Innovation Allowance
Recharge the Future
Start date:
Oct 2017
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
Global Earthing Systems (GES)
Start date:
Mar 2017
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance
Tier 2 Foam bags
Start date:
Dec 2016
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance
Domestic Energy Storage & Control
Start date:
Sep 2016
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
Black Cab Green
Start date:
Aug 2017
End date:
Aug 2018
Funding mechanism:
- Network Innovation Allowance
Improved Statistical Ratings for Distribution Overhead Lines
Start date:
Jul 2015
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Solar Storage
Start date:
Apr 2015
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
Mobile Asset Assessment Vehicle (MAAV)
Start date:
Jul 2016
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
FREEDOM - Flexible Residential Energy Efficiency Demand Optimisation and Management
Start date:
Oct 2016
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
Top Tee Siphon Adaptor (TTSA)
Start date:
Dec 2015
End date:
Aug 2019
Funding mechanism:
- Network Innovation Allowance
Common Information Model
Start date:
May 2016
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
Hydrogen Heat and Fleet Viability Assessment
Start date:
May 2018
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
LCT Detection
Start date:
Oct 2018
End date:
Feb 2019
Funding mechanism:
- Network Innovation Allowance
Serviboost Phase 2
Start date:
May 2017
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Risk Assessment Methodologies for Pipelines and AGIs 2018
Start date:
Apr 2018
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance

Valve Care Toolbox
Start date:
Sep 2017
End date:
May 2018
Funding mechanism:
- Network Innovation Allowance

Bond and Bolt Saddle System
Start date:
Apr 2014
End date:
Feb 2019
Funding mechanism:
- Network Innovation Allowance
Vacuum Excavation for Local Transmission System (VELTS) - Stage 1
Start date:
Jun 2018
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance
Automated Regulator Maintenance (ARM) (Phase 1)
Start date:
Sep 2015
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
Corrosion Mapping System for Buried Orpheus Regulator Modules – Phase 2
Start date:
Aug 2015
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Self-Amalgamating Tape (Stage 3)
Start date:
Oct 2015
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
Destructive Testing of Set-In and Set-on Nozzle connection welds
Start date:
Aug 2018
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance

Generation of Intelligent P&IDs from Plant3D models
Start date:
Jan 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance

Induction Heating
Start date:
Jul 2017
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance

Sensitivity and Specificity of Stress Concentration Tomography – I CASE award
Start date:
Nov 2014
End date:
Nov 2018
Funding mechanism:
- Network Innovation Allowance

PRCI (Pipeline Research Council International) 2018
Start date:
Apr 2018
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance

Compressor Data Analytics
Start date:
Nov 2017
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance

Incident Management (Stage 2 – Phase 1)
Start date:
Jun 2018
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
LiDAR to support NTS pipeline management
Start date:
Nov 2017
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance

Core Drilling and Flow Stop, WASK
Start date:
Sep 2014
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Techno-Economic Feasibility of Solid State CO2 Capture
Start date:
Oct 2018
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance

Power 2 Tower: Stage 1 Energy Harvesting Feasibility
Start date:
Mar 2016
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Investigation into the use of constrained-layer damping
Start date:
Mar 2014
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance

Investigation into Novel Robotics Locomotion Techniques
Start date:
Mar 2015
End date:
Aug 2018
Funding mechanism:
- Network Innovation Allowance

Artificial Intelligence for Pipe Coating Inspection
Start date:
Nov 2016
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance

Smart SLG Phase 1 – Automated plans
Start date:
Mar 2018
End date:
Nov 2018
Funding mechanism:
- Network Innovation Allowance
Core and Vac Drilling machine Anchorage
Start date:
Feb 2017
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
Temporary provision for Hot Water
Start date:
Oct 2018
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
Safety & Operational Framework for the Temporary Provision of Alternative Natural Gas Systems (SOFTPANG)
Start date:
Feb 2018
End date:
Feb 2019
Funding mechanism:
- Network Innovation Allowance
H21 –Domestic and Commercial Metering
Start date:
Apr 2017
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Strategic Pipeline Heat Study
Start date:
Mar 2017
End date:
Oct 2018
Funding mechanism:
- Network Innovation Allowance
H21 – Alternative hydrogen production and Network storage technologies
Start date:
Apr 2017
End date:
Feb 2019
Funding mechanism:
- Network Innovation Allowance
Novel Seal PPE
Start date:
Dec 2018
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Bonded Saddle for Temporary Mains Access
Start date:
Jun 2017
End date:
Feb 2019
Funding mechanism:
- Network Innovation Allowance
Automatic Thermovision Surveys (ACTS)
Start date:
Apr 2016
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Wireless Gas Detection Assessment
Start date:
May 2014
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance

Investigation of flow physics in gas pipe network
Start date:
Oct 2014
End date:
May 2018
Funding mechanism:
- Network Innovation Allowance

Advanced Manufacturing (3D Printing) of NTS ready components
Start date:
May 2017
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance

Universal Temperature Controller using Artificial Intelligence
Start date:
Mar 2018
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance
ACE (Advanced Condensing Exchanger)
Start date:
Mar 2018
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance
In Pipe Drone Feasibility
Start date:
Jul 2018
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
Sealback II (Testing)
Start date:
Nov 2015
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance
Ironclad (Component Prototype Phase - Graphitisation Stage 2)
Start date:
Mar 2017
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Roadmap to Development & Certification of Hydrogen Blended Gas Detection Equipment
Start date:
Sep 2018
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance
Hydrogen Perceptions, Practices and Possibilities in two UK communities
Start date:
Jan 2019
End date:
Jul 2019
Funding mechanism:
- Network Innovation Allowance
Wireless Instrumentation Field Trial
Start date:
Oct 2015
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
High Volume Gas Escapes (Stage 1)
Start date:
Mar 2018
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
PhotonFix™ (Seeker Particles - Stage 3)
Start date:
Jul 2016
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Hydrogen in natural gas – impact on gas engine CHP
Start date:
Sep 2017
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
Network Constraint Early Warning Systems (NCEWS)
Start date:
Feb 2017
End date:
May 2019
Funding mechanism:
- Network Innovation Allowance
Advanced Mini Bag Kit
Start date:
Jan 2016
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
Hypercube
Start date:
Jan 2018
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
Digital Pressure Test Alert
Start date:
Dec 2016
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
Gas PTii
Start date:
Feb 2014
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
Automated Pressure Tester
Start date:
Sep 2015
End date:
Aug 2018
Funding mechanism:
- Network Innovation Allowance
BioSNG City Conversion
Start date:
Feb 2018
End date:
Nov 2018
Funding mechanism:
- Network Innovation Allowance
ThermalTrax Feasibility Study
Start date:
Feb 2018
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
Modelling of Static and Dynamic Loads
Start date:
Jan 2015
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
CIPP for Services
Start date:
Oct 2017
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Customer-Led Network Revolution
Start date:
Jan 2011
End date:
Dec 2014
Funding mechanism:
- LCNF Tier 2
Low Carbon London
Start date:
Jan 2011
End date:
Jun 2014
Funding mechanism:
- LCNF Tier 2
Validation of Photovoltaic (PV) Connection Assessment Tool
Start date:
Jan 2012
End date:
Nov 2014
Funding mechanism:
- LCNF Tier 1
Distribution Network Visibility
Start date:
Mar 2011
End date:
Mar 2014
Funding mechanism:
- LCNF Tier 1
Demonstrating the Benefits of Short-term Discharge Energy Storage on an 11kV Distribution Network
Start date:
Mar 2011
End date:
Feb 2014
Funding mechanism:
- LCNF Tier 1
Smarter Network Storage (SNS)
Start date:
Jan 2013
End date:
Dec 2016
Funding mechanism:
- LCNF Tier 2
Kent Active System Management (KASM)
Start date:
Jan 2015
End date:
Dec 2017
Funding mechanism:
- LCNF Tier 2
Flexible Urban Networks - Low Voltage
Start date:
Jan 2014
End date:
Dec 2016
Funding mechanism:
- LCNF Tier 2
Flexible Plug and Play Low Carbon Networks
Start date:
Jan 2012
End date:
Dec 2014
Funding mechanism:
- LCNF Tier 2
Smart Paints and Coating Systems
Start date:
Feb 2015
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
MEG Saturation Monitoring
Start date:
Jan 2017
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
Pit Protect
Start date:
Oct 2016
End date:
Mar 2018
Funding mechanism:
- Network Innovation Allowance
Project EVA – Extreme Value Analysis
Start date:
Jan 2017
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance

Customer Self Isolation and Restoration (Stage 2)
Start date:
Oct 2013
End date:
Feb 2014
Funding mechanism:
- Network Innovation Allowance
Cured In-Place Pipe (CIPP) (Stage 2)
Start date:
Aug 2013
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance
Optomole
Start date:
Mar 2013
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance
Robotics
Start date:
Jan 2014
End date:
Jun 2018
Funding mechanism:
- NIC
Iron Mains Condition Assessment System
Start date:
Apr 2012
End date:
Jul 2013
Funding mechanism:
- Network Innovation Allowance
Real-Time Networks Feasibility Study
Start date:
Nov 2014
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance
SynthoScope
Start date:
Mar 2015
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
Orbis Oxifree (TM198) Corrosion Coating
Start date:
Jun 2014
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance
Seeker Particles (Stage 2)
Start date:
Jul 2014
End date:
Jun 2015
Funding mechanism:
- Network Innovation Allowance
Technical Review of Non-conventional Statcom Applications
Start date:
Feb 2017
End date:
Aug 2017
Funding mechanism:
- Network Innovation Allowance
Highly Portable GPR
Start date:
Oct 2016
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
Time Series Data Tool Feasibility Study
Start date:
Oct 2016
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
Subline Structural
Start date:
Mar 2016
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
Carbon Tracing
Start date:
Aug 2016
End date:
Mar 2018
Funding mechanism:
- Network Innovation Allowance
LV Plus
Start date:
Aug 2016
End date:
Aug 2018
Funding mechanism:
- Network Innovation Allowance
Electric Vehicle Emissions Testing
Start date:
Jul 2016
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
Lightning Protection
Start date:
Dec 2013
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
Dynamic Line Rating CAT1
Start date:
Apr 2009
End date:
Apr 2018
Funding mechanism:
- Network Innovation Allowance
Superconducting Cables – Network Feasibility Study
Start date:
May 2016
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Project SYNC (Solar Yield Network Constraints)
Start date:
Sep 2015
End date:
Feb 2018
Funding mechanism:
- Network Innovation Allowance
Airborne Inspection Phase 1
Start date:
Nov 2015
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Fault Passage Indicators for Sensitive Earth Faults
Start date:
Dec 2015
End date:
Mar 2018
Funding mechanism:
- Network Innovation Allowance
Starline/Marwin Valve Bolt Replacement
Start date:
Dec 2013
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
Microstop
Start date:
Sep 2013
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
Thermal imaging Observation techniques for Underground CAble Networks (TOUCAN)
Start date:
Jan 2016
End date:
Sep 2017
Funding mechanism:
- Network Innovation Allowance
ACCESS – Local Constraint Management (Mull)
Start date:
Jul 2015
End date:
Feb 2018
Funding mechanism:
- Network Innovation Allowance
Field Team Support Tool
Start date:
Apr 2015
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
MRPS Digital Map-Based Data Capture and Mobile GIS
Start date:
Apr 2017
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Alternative gas pinpointing
Start date:
Sep 2017
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
H21 - Keighley and Spadeadam designs
Start date:
May 2017
End date:
Apr 2018
Funding mechanism:
- Network Innovation Allowance
Water Ingress Investigation
Start date:
Nov 2016
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
ACSS Conductor Study
Start date:
Mar 2018
End date:
Mar 2019
Funding mechanism:
- Network Innovation Allowance
AMS Governor Clocks
Start date:
Dec 2017
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
Syphon Design for Polyethylene Networks
Start date:
Sep 2016
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
IntEGReL Phase 1
Start date:
Apr 2017
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Cable Oil Regeneration
Start date:
Apr 2013
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
GasLight Q field portable nondestructive PE material analyzer
Start date:
Mar 2015
End date:
May 2018
Funding mechanism:
- Network Innovation Allowance
ATLAS - Architecture of tools for load scenarios
Start date:
Nov 2015
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
Transformer Rating Modelling Tool Enhancement
Start date:
Sep 2015
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
Reliable, low-cost earth fault detection for radial OHL systems
Start date:
Oct 2015
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
Transient and Clearances in the Future Electrical Transmission Systems (ICASE Award)
Start date:
Sep 2012
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Valve Sealant Line Grouted Tee
Start date:
Jun 2016
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance

Cable Extraction
Start date:
Apr 2013
End date:
Feb 2016
Funding mechanism:
- Network Innovation Allowance
Feasibility study on the application of advanced materials
Start date:
Jan 2016
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Portable gas Reading Equipment (PRE)
Start date:
Jan 2017
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
Leakage Sealant Standards
Start date:
Nov 2016
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
GPS Enabled Video in Route-Walk Surveys
Start date:
Mar 2017
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Gas Demand Forecasting
Start date:
Oct 2017
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
Open Source SCADA Platform
Start date:
Sep 2017
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance

PRCI - Pipeline Research Council International - 2017
Start date:
Apr 2017
End date:
Apr 2018
Funding mechanism:
- Network Innovation Allowance

Acoustic Resonance Technology (ART)
Start date:
Jan 2017
End date:
Mar 2018
Funding mechanism:
- Network Innovation Allowance

Endbox G38 Level Detection
Start date:
May 2017
End date:
May 2018
Funding mechanism:
- Network Innovation Allowance
Novel methodology for assessing environmental exposure of OHL routes
Start date:
May 2017
End date:
Nov 2018
Funding mechanism:
- Network Innovation Allowance
Development of fittings analysis model
Start date:
Jan 2017
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
Installation Risk and Technology Assessment Model
Start date:
May 2016
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance

Gas Quality 2020
Start date:
Aug 2016
End date:
Sep 2017
Funding mechanism:
- Network Innovation Allowance

Composite Pipe Supports Phase 2
Start date:
Aug 2016
End date:
Mar 2018
Funding mechanism:
- Network Innovation Allowance

Gas Transmission Network Output Methodology Analytics
Start date:
Aug 2016
End date:
Aug 2017
Funding mechanism:
- Network Innovation Allowance

Alternative Pre-Heat System
Start date:
Sep 2017
End date:
Feb 2018
Funding mechanism:
- Network Innovation Allowance
Data and Schematics Improvement
Start date:
Dec 2017
End date:
May 2018
Funding mechanism:
- Network Innovation Allowance
Risk Assessment Methodologies for Pipelines and AGIs 2017
Start date:
Apr 2017
End date:
Apr 2018
Funding mechanism:
- Network Innovation Allowance

Epoxy Grout Investigation and Analysis
Start date:
Jun 2017
End date:
Mar 2018
Funding mechanism:
- Network Innovation Allowance

European Pipeline Research Group 2017
Start date:
Apr 2017
End date:
Apr 2018
Funding mechanism:
- Network Innovation Allowance

EMAT – In-line Coating Disbondment Detection Assessment
Start date:
Nov 2017
End date:
May 2018
Funding mechanism:
- Network Innovation Allowance

Overhead Line Assessments Using Panoramic Images
Start date:
Jul 2017
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
Directional Earth Fault Passage Indicator Trial
Start date:
Jan 2014
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
Seam weld identification
Start date:
Jul 2016
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance

Next Generation Predictive Emission Monitoring Validation (PEMS)
Start date:
Mar 2016
End date:
Aug 2017
Funding mechanism:
- Network Innovation Allowance

Efficient network constraint management through the use of market signals
Start date:
Jun 2016
End date:
Aug 2017
Funding mechanism:
- Network Innovation Allowance
Optimising overhead line conductor inspection & condition assessment
Start date:
Apr 2016
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
RoadMender reinstatement trial
Start date:
Jan 2016
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
Underground HV Cable Research
Start date:
Sep 2015
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
Vertical Transition Straight Joints Innovative Inspection
Start date:
Sep 2015
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Better Spur Protection
Start date:
Apr 2014
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
Freight Electric Vehicles in Urban Europe (FREVUE)
Start date:
Mar 2013
End date:
Sep 2017
Funding mechanism:
- Network Innovation Allowance
iStop
Start date:
Jul 2017
End date:
Aug 2018
Funding mechanism:
- Network Innovation Allowance
Practical Solution for Overbuilds
Start date:
Dec 2016
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
Remote ECV Isolation
Start date:
Sep 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Digital MPRS Solution
Start date:
Aug 2016
End date:
Sep 2017
Funding mechanism:
- Network Innovation Allowance
Traceability
Start date:
May 2017
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
CNG Vehicle Trial
Start date:
Oct 2015
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
Live ECV Exchange
Start date:
Feb 2018
End date:
Aug 2018
Funding mechanism:
- Network Innovation Allowance
Operational Assessment of Composite Poles
Start date:
Feb 2017
End date:
Feb 2018
Funding mechanism:
- Network Innovation Allowance
Life Cycle Costing and Value Optimisation (ICase Award)
Start date:
Oct 2014
End date:
Apr 2018
Funding mechanism:
- Network Innovation Allowance
Feasibility Study for Sustainable Substation Design
Start date:
Feb 2012
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance
Modelling the tape corrosion process for oil-filled underground cables
Start date:
Oct 2013
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
Clean to Green
Start date:
Jun 2017
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
Remote circumferential pipe cleaning tool
Start date:
Dec 2016
End date:
Mar 2018
Funding mechanism:
- Network Innovation Allowance
Portable Earthing Device
Start date:
Nov 2016
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Detection and Measurement of ACSR Corrosion
Start date:
Nov 2011
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance
NDT of Welds by Ultrasonic Techniques
Start date:
Aug 2017
End date:
Mar 2018
Funding mechanism:
- Network Innovation Allowance

Health and Safety Monitor
Start date:
Dec 2016
End date:
Apr 2018
Funding mechanism:
- Network Innovation Allowance
Controllable Series Impedance at 275 and 400kV (CSI)
Start date:
Jun 2017
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
Novel acoustic attenuation feasibility study
Start date:
Feb 2017
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Transformer Research Consortium
Start date:
Apr 2013
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
Study into the Concept of High Impact, Low Probability Events
Start date:
Nov 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Migration Corrosion Inhibitors
Start date:
Mar 2017
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
I-0052 Optomole Phase 4
Start date:
Sep 2016
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
PRISM (Pipe Replacement in situ Manufacturing) - Material Lifetime Testing
Start date:
May 2016
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Blown Air Extrusion (BAE) Material Lifetime Testing
Start date:
May 2016
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
PRISM (Pipe Replacement in situ Manufacturing) – Below Ground Dead Main Trial and Associated Work
Start date:
Jul 2016
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Tier One Replacement System Stage 5
Start date:
Jul 2015
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
Blown Air Extrusion (BAE) – Proof of Concept 3
Start date:
Sep 2016
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Security Assessment of Industrial Control Systems (ICS)
Start date:
Jun 2016
End date:
Sep 2017
Funding mechanism:
- Network Innovation Allowance
Deployment of Resin-based Pipe Replacement in Services
Start date:
Jul 2017
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
Digital Substation – Virtual Site Acceptance Testing & Training
Start date:
Mar 2015
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Automated Pipeline BIM Modelling and Cost Estimating Tool – Stage 1
Start date:
Oct 2017
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
Resin-based Gas Distribution Pipe Replacement
Start date:
Jun 2017
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
Remote Asset Vibration Monitoring
Start date:
Jul 2017
End date:
Oct 2017
Funding mechanism:
- Network Innovation Allowance
Connections Forecasting Feasibility Study
Start date:
May 2017
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Gas Polymerisation – Stage 2 - Engineering Development
Start date:
Sep 2015
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
Gas Polymerisation - Proof of Concept
Start date:
Aug 2014
End date:
Jul 2015
Funding mechanism:
- Network Innovation Allowance
Proof of Concept for IEC61850 Process Bus Technology
Start date:
Aug 2013
End date:
Feb 2018
Funding mechanism:
- Network Innovation Allowance
Multi-Occupancy Building Cured In Place Lining (NuFlow)
Start date:
Apr 2017
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
Industry and Network Blends – Delivering Reduced Carbon Intensity on the Network
Start date:
May 2017
End date:
May 2018
Funding mechanism:
- Network Innovation Allowance
SynthoTrax I-Seal Robot (Technical Feasibility Study)
Start date:
Jan 2013
End date:
Sep 2013
Funding mechanism:
- Network Innovation Allowance
Corrosion Mapping System for Buried ”Orpheus” Regulator Modules
Start date:
Jan 2013
End date:
Nov 2013
Funding mechanism:
- Network Innovation Allowance
Tornado Max
Start date:
Aug 2013
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
Pneumatic PE Pushing Machine
Start date:
Aug 2013
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance
Portable ‘Gas In Ducts’ Sample System
Start date:
Aug 2013
End date:
Sep 2015
Funding mechanism:
- Network Innovation Allowance
Large CISBOT (Cast Iron Joint Sealing Robot)
Start date:
Aug 2013
End date:
Aug 2014
Funding mechanism:
- Network Innovation Allowance
Bar Hole Zone Rating (Stage 1)
Start date:
Feb 2015
End date:
Aug 2015
Funding mechanism:
- Network Innovation Allowance
Advanced Gas Detection
Start date:
Jan 2015
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Combined Fuel Cell – Heat Pump Research Study
Start date:
Jun 2015
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Utilisation of the Modular NIC Robotics Platform for Service Line Rehabilitation
Start date:
Jun 2015
End date:
Feb 2016
Funding mechanism:
- Network Innovation Allowance
Opening up the Gas Market
Start date:
Jan 2014
End date:
Jan 2016
Funding mechanism:
- NIC
Energy Map and Plan
Start date:
Mar 2016
End date:
Nov 2016
Funding mechanism:
- Network Innovation Allowance
Beyond Visual Line of Sight Aerial Inspection Vehicle
Start date:
Mar 2014
End date:
Sep 2015
Funding mechanism:
- Network Innovation Allowance
Robotic Roadworks (Stage 1)
Start date:
Dec 2015
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
Incident Management (Stage 1)
Start date:
Dec 2015
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
Synthotech Service Relay Initiative
Start date:
Jan 2011
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance
Seeker Particles
Start date:
Sep 2013
End date:
May 2014
Funding mechanism:
- Network Innovation Allowance
Osprey Pressure Validator
Start date:
Sep 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance
Small Pressure Pot
Start date:
Oct 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance
RCA GPS Survey
Start date:
Oct 2013
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance
Gas Eco (GECO) Gas Pump
Start date:
Mar 2014
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance
Self-Amalgamating Tape (Stage 2)
Start date:
Oct 2013
End date:
Nov 2014
Funding mechanism:
- Network Innovation Allowance
Long handled PE Top Tee Cutter
Start date:
Jun 2014
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Oscillating Energy Harvester (Phase 2)
Start date:
Feb 2014
End date:
Feb 2016
Funding mechanism:
- Network Innovation Allowance
Acoustic Communications in Gas Mains
Start date:
Feb 2014
End date:
Feb 2016
Funding mechanism:
- Network Innovation Allowance
Acoustek
Start date:
May 2014
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance
Cotter Plate Identification and Remediation (Stage 1)
Start date:
Mar 2014
End date:
Jun 2014
Funding mechanism:
- Network Innovation Allowance
Gas Risk in No Access Properties
Start date:
Apr 2014
End date:
Dec 2015
Funding mechanism:
- Network Innovation Allowance
Aerosol Sealant - Stage 1A - Initial Development
Start date:
Aug 2014
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
40mm Serviflex
Start date:
Nov 2014
End date:
Feb 2016
Funding mechanism:
- Network Innovation Allowance
PE Bodied Valves
Start date:
Feb 2015
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Solutions to Pipeline Graphitisation and Corrosion – Stage 1 - Concept Development
Start date:
Jun 2015
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Interruption Solutions – Live ECV, Meter, and Service Replacement (Stage 1)
Start date:
Oct 2015
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance
Magnetic Filtration in Medium to Low Pressure Networks
Start date:
Aug 2015
End date:
Feb 2017
Funding mechanism:
- Network Innovation Allowance
Phased Array Cable Avoidance
Start date:
Oct 2017
End date:
Apr 2018
Funding mechanism:
- Network Innovation Allowance
Review of MTC Proposed Solutions for Resin Based Service Replacement Solution
Start date:
Feb 2018
End date:
Aug 2018
Funding mechanism:
- Network Innovation Allowance
Dinorwig Thermal Cycling and Cable Rating
Start date:
Feb 2013
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Asset Risk Optimisation
Start date:
Jul 2015
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Ester Fluid Transformer Re-Design
Start date:
Dec 2015
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
Underground Cable Overlay Cost Reduction
Start date:
Sep 2015
End date:
Feb 2017
Funding mechanism:
- Network Innovation Allowance
Alternative Cable Installation Methods (ACIM) – Phase 1 (Feasibility Study)
Start date:
Oct 2015
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
Assessment of Remotely Operated Mulching Methods
Start date:
Nov 2015
End date:
Nov 2016
Funding mechanism:
- Network Innovation Allowance
Innovative Approach for Transmission Harmonics Issues
Start date:
Jan 2017
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance
Locamation SASensor High-Medium Voltage (HMV) Primary Substation Protection
Start date:
Jul 2012
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance
Tunnel Data Capture Enhancement
Start date:
Nov 2015
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
Impact of Biomethane on Gas Networks.
Start date:
Mar 2017
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Water Extraction Reel & Y Branch
Start date:
Nov 2013
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
Immersion Tube Preheating
Start date:
Jan 2013
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Novel Pressure Reduction Station (Stage 1)
Start date:
Jan 2014
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
Robotic Roadworks System (RRS) - Stage 2
Start date:
Nov 2016
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
Total stub end abandonment
Start date:
Jan 2015
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
Development of draft NGG standard for RTP pipelines
Start date:
Apr 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Concrete Removal System for Multi-Occupancy Buildings (MOBs)
Start date:
Mar 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Repair Sleeve for Gas Pipe Systems in Multi-Occupancy Buildings (MOBs)
Start date:
Mar 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Wall Anchors for Gas Pipe Systems in Multi-Occupancy Buildings (MOBs)
Start date:
Mar 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
HyNet – Capital Resources Project
Start date:
Feb 2018
End date:
Jun 2018
Funding mechanism:
- Network Innovation Allowance
Tier One Replacement System Stage 4.2
Start date:
Oct 2014
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance
Trialling Long-Lasting Tower Paints
Start date:
Apr 2016
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance
Remote monitoring Device for Flammable and Toxic Gases
Start date:
Sep 2016
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
Risk Assessment Methodologies for Pipelines and AGI’s 2016
Start date:
Apr 2016
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance

PRCI - Pipeline Research Council International - 2016
Start date:
Apr 2016
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance

European Pipeline Research Group 2016
Start date:
Apr 2016
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance

SENSIT Acoustic Pipe Locator
Start date:
Jun 2015
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
Paw Patrol (Gas Detection Dogs - Phase 2)
Start date:
Aug 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Alternative ECV Exchange Kit
Start date:
Mar 2016
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
Development of DANINT FWAVC software for New Gas Chromatograph
Start date:
Dec 2010
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
T Shale – Part One (scenarios)
Start date:
Jan 2015
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
A new technical specification for future gas composition analysis equipment
Start date:
Jan 2017
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Intelligent CO Monitors
Start date:
Jul 2014
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
Iron Mains Condition Assessment System Phase 3
Start date:
Jul 2014
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
Removable Composite Transition Pieces (CTP)
Start date:
Jul 2013
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance

Hystart
Start date:
Apr 2016
End date:
Aug 2016
Funding mechanism:
- Network Innovation Allowance
Assessment of Bioenergy Resource Potential for UK Biomethane
Start date:
Feb 2017
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Iron Mains Condition Assessment System Phase 3a
Start date:
Dec 2013
End date:
Feb 2014
Funding mechanism:
- Network Innovation Allowance
Unconventional gases within the onshore gas networks
Start date:
Feb 2013
End date:
Dec 2013
Funding mechanism:
- Network Innovation Allowance
e Pipe – Trial internal lining assessment and development of small diameter pipelines.
Start date:
Mar 2013
End date:
Sep 2014
Funding mechanism:
- Network Innovation Allowance
Diurnal Storage (Phase 2)
Start date:
Feb 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance
Asset Health & Criticality Modeling
Start date:
Dec 2013
End date:
Oct 2014
Funding mechanism:
- Network Innovation Allowance
Cornwall Energy Island
Start date:
Feb 2016
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Treatment & Re-use of Gasholder Sludge
Start date:
May 2014
End date:
Nov 2015
Funding mechanism:
- Network Innovation Allowance
Electrical Power Research Institute Programme Engagement
Start date:
Jan 2013
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
Enhanced Real-Time Cable Temperature Monitoring
Start date:
Apr 2015
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
Multi-Occupancy Building CIP (HTC Serline)
Start date:
May 2014
End date:
Jul 2015
Funding mechanism:
- Network Innovation Allowance
Investment Prioritisation in Distribution Systems
Start date:
Dec 2013
End date:
Nov 2015
Funding mechanism:
- Network Innovation Allowance
Ductile Iron Window Cutter Tool
Start date:
Jun 2014
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance
Safe Digging Phased Array Feasibility Study
Start date:
Jan 2017
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Multi-Occupancy Building Cured In Place Lining (NuFlow) trial
Start date:
Mar 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Alternative PE joint preparation
Start date:
Jan 2017
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
Off-Take Reform / Alarm & Demand Management
Start date:
Jan 2015
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
Back Blade Protector
Start date:
Dec 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Cognitive Technology for Technical Standards
Start date:
Dec 2016
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance

Detailed design of 400 kV 240MVA Mobile Substation Bay
Start date:
Sep 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Grid Planning (P 40)
Start date:
Jul 2016
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Substations 2016 (P37)
Start date:
Oct 2016
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Overhead Lines 2016 (P35)
Start date:
Oct 2016
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Cyber Security 2016 (P183)
Start date:
Jun 2016
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
H21 Leeds Citygate
Start date:
Jan 2015
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
Mobile Virtual Reality Modelling
Start date:
Jun 2015
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
Flexible Energy Model
Start date:
Nov 2016
End date:
Feb 2017
Funding mechanism:
- Network Innovation Allowance
33kV Hot Glove Working
Start date:
May 2014
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
I0071 H2 Clusters
Start date:
Nov 2016
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Impact of Distributed Gas Sources on the GB Gas Network
Start date:
Jun 2015
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
Parade (Polemounted Auto-Recloser Automated Distribution Evaluation)
Start date:
Apr 2015
End date:
Aug 2017
Funding mechanism:
- Network Innovation Allowance
Feasibility study – Small Unmanned Aerial Systems
Start date:
Oct 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Non-Intrusive Assessment Techniques for Tower Foundations
Start date:
Oct 2016
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
BioH2 Project: Production of hydrogen by the gasification of waste
Start date:
Oct 2016
End date:
Jun 2017
Funding mechanism:
- Network Innovation Allowance
Cables with Long Electrical Sections
Start date:
Apr 2012
End date:
Aug 2017
Funding mechanism:
- Network Innovation Allowance
Rapid Deployment Ballistic Screens
Start date:
Jul 2011
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance
Optimisation of Node Configuration In Offshore Supergrids
Start date:
Jun 2011
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
T-pylon Structure and Composite Insulator Testing
Start date:
Feb 2014
End date:
Dec 2016
Funding mechanism:
- Network Innovation Allowance
Induced voltages and currents on transmission overhead lines under NSI 4 working practices
Start date:
Feb 2014
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Application of DC circuit-breakers in DC Grids
Start date:
Jul 2012
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Dynamic Ratings for improved Operational Performance (DROP)
Start date:
Apr 2012
End date:
Aug 2016
Funding mechanism:
- Network Innovation Allowance
Multi-terminal VSC HVDC operation, control and ac system integration
Start date:
Oct 2011
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Magnetic Models for Transformers
Start date:
Sep 2009
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Bushing and Instrument Transformer Test Tap Connection Condition Assessment Tool
Start date:
Nov 2013
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
Online Gas in Oil Analysis on Existing HV Cables
Start date:
May 2013
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Electromagnetic transients (EMT) in future power systems – Phenomena, stresses & modelling
Start date:
Mar 2011
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
A New Independent Methodology For P&C Coordination Studies Using Real Time Digital Simulation
Start date:
Sep 2015
End date:
Sep 2017
Funding mechanism:
- Network Innovation Allowance
Bulk Oil Circuit Breaker Bushing In Situ Refurbishment
Start date:
Dec 2013
End date:
Nov 2016
Funding mechanism:
- Network Innovation Allowance
Partial Discharge on Existing HV Cable
Start date:
May 2013
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Enhanced Sensor Development (ICASE Award)
Start date:
Oct 2012
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
Determining a threshold for magnetophosphenes perception at 50Hz
Start date:
Mar 2014
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Avoiding voltage regulation action conflicts. (In conjunction with LCNF project CLASS)
Start date:
Apr 2013
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance

Impact of Seabed Properties on Ampacity and Reliability of Cables (ICASE Award)
Start date:
Oct 2012
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
DC Circuit Breaker Technologies
Start date:
Oct 2012
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
Sunshine Tariff
Start date:
Jul 2015
End date:
Feb 2017
Funding mechanism:
- Network Innovation Allowance
Risk Assessment for Overbuilds
Start date:
Aug 2016
End date:
Nov 2016
Funding mechanism:
- Network Innovation Allowance
Investigation into LPRC pipeline material
Start date:
Jul 2015
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance

PRISM (Pipe Replacement in situ Manufacturing) – Below Ground Yard Trial
Start date:
May 2016
End date:
Nov 2016
Funding mechanism:
- Network Innovation Allowance
Re-Defining Failure
Start date:
Aug 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Gas Generator Preservation Assessment
Start date:
Aug 2014
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance

IEC 61850 Integration of Substation Protection and Control – Test Facility
Start date:
Apr 2013
End date:
Dec 2016
Funding mechanism:
- Network Innovation Allowance
T-Shale Part Two (Summer Flow Modelling)
Start date:
Jan 2015
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
Sustainable Multi Storey Communities
Start date:
Oct 2014
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
Review of Engineering Recommendation P2/6
Start date:
Jan 2015
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
Offtake Optimisation
Start date:
Jul 2016
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
Gas CHP Impact Study
Start date:
May 2015
End date:
Feb 2017
Funding mechanism:
- Network Innovation Allowance
Technical Standards Strategy
Start date:
Jun 2016
End date:
Dec 2016
Funding mechanism:
- Network Innovation Allowance

Meter Validation Assessment Tool (MVAT)
Start date:
Jan 2015
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance

Utilisation of 3D Laser Scanners for pipeline damage and coating assessments.
Start date:
May 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance

Ultrasonic testing of thin wall pipeline girth welds using high frequency probes
Start date:
Apr 2016
End date:
Aug 2016
Funding mechanism:
- Network Innovation Allowance

Infra-red photography for maintenance
Start date:
Apr 2016
End date:
Dec 2016
Funding mechanism:
- Network Innovation Allowance

EPRI Research Collaboration on Overhead Transmission Lines Project
Start date:
Sep 2015
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Electric and Magnetic Fields Health and Safety
Start date:
Sep 2015
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
Smart Urban Low Voltage Network
Start date:
Dec 2009
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Remaining Useful Life (RUL) determination for compressors
Start date:
Aug 2015
End date:
Nov 2016
Funding mechanism:
- Network Innovation Allowance

LV Elbow Joints
Start date:
Mar 2016
End date:
Nov 2017
Funding mechanism:
- Network Innovation Allowance
Development of Specification for PE Repair Systems
Start date:
Sep 2014
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
On-Line Fourier Transform Infrared Siloxane Analyser for Monitoring Biomethane Sites
Start date:
Aug 2014
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
The Prediction of Weather-Related Faults
Start date:
May 2015
End date:
Aug 2016
Funding mechanism:
- Network Innovation Allowance
UAV Platform Development for Automated Asset Condition Diagnosis
Start date:
Mar 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Blown Air Extrusion (BAE) Fully Structural Solution - Proof of Concept
Start date:
Mar 2016
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
PRISM (Pipe Replacement in situ Manufacturing) – Above Ground Trial
Start date:
Mar 2016
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
Asset Information Models (AIM) for Component/Pattern Recognition
Start date:
Mar 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance

Modular Approach to Substation Construction - Design Development
Start date:
Apr 2014
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
Alternative to Wood Poles – Feasibility Study
Start date:
Jul 2015
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Review of the FWACV Billing Regime
Start date:
Feb 2015
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Project Concur
Start date:
Mar 2016
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Future Network Modelling Functions
Start date:
Mar 2016
End date:
Sep 2017
Funding mechanism:
- Network Innovation Allowance
Analytical Approaches to Asset Management
Start date:
Feb 2016
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Classification of Wind Exposed Overhead line Spans
Start date:
Feb 2016
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
Selective Catalytic Reduction (SCR) Pre-FEED Environmental and Technical Study
Start date:
Feb 2016
End date:
Feb 2017
Funding mechanism:
- Network Innovation Allowance

Project Futurewave - Phase 3 (Pilot)
Start date:
Feb 2016
End date:
Feb 2017
Funding mechanism:
- Network Innovation Allowance
Assessment and bench marking of low carbon heating technologies
Start date:
Feb 2016
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
MEG Fogger Trial Phase 4a
Start date:
May 2015
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
MEG Fogger Trial Phase 3
Start date:
Nov 2014
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance
Time Series Data Quality
Start date:
Feb 2016
End date:
Feb 2017
Funding mechanism:
- Network Innovation Allowance
Environmental Containment solutions for Midel 7131
Start date:
Feb 2016
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Global Analysis of Smart Grid Telecommunications Solutions
Start date:
Feb 2016
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
SMART Pressure Sensor device
Start date:
May 2015
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
CO2 Capture through mineralisation
Start date:
Jan 2015
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Development of Gas Industry Specification for Polymeric Pipe Lining Systems for Multi-Occupancy Buil
Start date:
Mar 2015
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance
New techniques for the measurement of pipeline depth of cover
Start date:
Jan 2016
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance

Project Blackout
Start date:
Jan 2016
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Gas to the Future
Start date:
Jan 2016
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
WEKO Seal Removal
Start date:
Jan 2015
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance
Nitrogen Sleeve Epoxy End-Seal Repair Solution
Start date:
Jan 2016
End date:
Jan 2019
Funding mechanism:
- Network Innovation Allowance

Low Carbon Garbage Collection – City Blue Print
Start date:
Jan 2015
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
Network Optimisation Project (NOP)
Start date:
Jan 2016
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
Development of a Standard 33kV Damped Harmonic Filter Design
Start date:
Nov 2015
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
KOBUS Gas Pipe Puller
Start date:
Nov 2014
End date:
Feb 2016
Funding mechanism:
- Network Innovation Allowance
Provision of Temporary Gas Supplies
Start date:
Jul 2014
End date:
Dec 2017
Funding mechanism:
- Network Innovation Allowance
Shunt Reactor Switching Innovation Study
Start date:
Mar 2014
End date:
Jul 2014
Funding mechanism:
- Network Innovation Allowance
Investigation into the development of an MVDC Demonstration Project
Start date:
Jul 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance
Smart Transmission Zone Proposal
Start date:
Oct 2013
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance
Prognostics and Health Monitoring of Grid Connected Assets
Start date:
Dec 2012
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Tyne Tunnel guided wave trial
Start date:
Jan 2014
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance
TD Williamson Guided Wave Non Destructive Testing Inspection For High Rise Buildings
Start date:
Jul 2014
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance
Electric Boulevards (Continuation of Project LCNF_WPDT1009)
Start date:
Jan 2013
End date:
Sep 2015
Funding mechanism:
- Network Innovation Allowance
Network Outperformance Measure Risk Trading Methodology
Start date:
Apr 2015
End date:
Dec 2016
Funding mechanism:
- Network Innovation Allowance
Guided Wave Non Destructive Testing Inspection of Mains Pipelines
Start date:
May 2014
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance
Geospatial Information System (GIS) Pipeline Costing Tool
Start date:
Dec 2015
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance

Network Outperformance Measure Risk Trading Methodology Stage 2
Start date:
Dec 2015
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Blown Air Extrusion
Start date:
Oct 2015
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Low Carbon Energy Solutions
Start date:
Jun 2014
End date:
Dec 2016
Funding mechanism:
- Network Innovation Allowance
Investigation of Switchgear Ratings
Start date:
Dec 2015
End date:
Dec 2016
Funding mechanism:
- Network Innovation Allowance
Distributed Photonic Grid Instrumentation
Start date:
May 2015
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance
Service Water Extraction
Start date:
Dec 2014
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Rapid Steel Pipe Cutter
Start date:
Dec 2015
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
Pole Reclassification System Evaluation
Start date:
Nov 2015
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance
Network Resilient Zone Utilising Standby Generation – Feasibility Study
Start date:
Jul 2015
End date:
Feb 2016
Funding mechanism:
- Network Innovation Allowance
Fracture Monitoring Using Acoustics
Start date:
Mar 2013
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
Remote Water Removal System
Start date:
Oct 2014
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
Spatial district heating analysis and impact on gas and power demand
Start date:
Apr 2015
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance

Western Isles Network Resilient Zone Utilizing Embedded Generation – Feasibility Study
Start date:
Nov 2015
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance
Enhanced Operational Forecasting
Start date:
Sep 2015
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance

Gas Infrastructure Serviceability Performance Assessment
Start date:
Oct 2015
End date:
Aug 2016
Funding mechanism:
- Network Innovation Allowance
Gas Detection Dogs
Start date:
Oct 2015
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
Project Futurewave – Phase 2 (Digital Prototype)
Start date:
Jun 2015
End date:
Dec 2015
Funding mechanism:
- Network Innovation Allowance
PRISM (Pipe Replacement in situ Manufacturing) – 6" Line Trial
Start date:
Mar 2015
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
OHL Condition Assessment
Start date:
Feb 2014
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Overhead Line Vibration Monitoring Phase 2
Start date:
Oct 2015
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
ServiBoost
Start date:
Oct 2015
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
LV Connectivity Modelling
Start date:
Oct 2015
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Modelling Asset Risk
Start date:
Sep 2015
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
Voltage Reduction Analysis
Start date:
Sep 2015
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Solid Cable Replacement Prioritisation
Start date:
Sep 2015
End date:
Feb 2017
Funding mechanism:
- Network Innovation Allowance
Small Bore Cable Replacement Technology
Start date:
Sep 2015
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
Composite Shell Joint Retrofit Trial
Start date:
Sep 2015
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
Bridgend Future Modelling – Phase 3 – Required Policy Changes
Start date:
Sep 2015
End date:
Dec 2015
Funding mechanism:
- Network Innovation Allowance
Data Intelligence for Network Operations (DINO) Phase 1.
Start date:
Sep 2015
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Business Models Enhancement (BME)
Start date:
Aug 2015
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
Study of crater formation threshold during gas leakage on high pressure pipes
Start date:
Jan 2014
End date:
Feb 2016
Funding mechanism:
- Network Innovation Allowance
Siloxane Impact Study
Start date:
Oct 2014
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
Jointing Techniques for PE Gas Pipelines up to 10 bar
Start date:
Feb 2015
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
Improving Customer Operations by 24 hour site Safety Monitoring
Start date:
Dec 2014
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance
Renewable Power Trial and Demonstration
Start date:
Aug 2014
End date:
Feb 2016
Funding mechanism:
- Network Innovation Allowance

Leyland CNG Filling Station
Start date:
Jul 2015
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Overhead Transmission Lines Project
Start date:
Jan 2014
End date:
Jul 2015
Funding mechanism:
- Network Innovation Allowance

EPRI Research Collaboration on Substations
Start date:
Jan 2014
End date:
Jul 2015
Funding mechanism:
- Network Innovation Allowance

EPRI Research Collaboration on Underground Transmission
Start date:
Jan 2014
End date:
Jul 2015
Funding mechanism:
- Network Innovation Allowance
Cathodic Protection for Pipelines within a Tunnel
Start date:
Jul 2015
End date:
Dec 2015
Funding mechanism:
- Network Innovation Allowance

Impact of Electrolysers on the Distribution Network
Start date:
Oct 2013
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
Composite Pipe Supports
Start date:
Sep 2012
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance

Above Ground Installation Integrity Decision Support Tool
Start date:
May 2014
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance

Network Resilient Zone Utilising Embedded Generation – Feasibility Study
Start date:
Jul 2015
End date:
Sep 2015
Funding mechanism:
- Network Innovation Allowance
Demand Scenarios with Electric Heat and Commercial Capacity Options
Start date:
Apr 2015
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
Risk Assessment Methodologies for Pipelines and AGI’s 2014
Start date:
Apr 2014
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance

Bridgend Future Modelling – Phase 2 – Willingness to Pay
Start date:
Jun 2015
End date:
Aug 2015
Funding mechanism:
- Network Innovation Allowance
Evaluation of a Novel Variant of ACCC HTLS Conductor
Start date:
May 2015
End date:
May 2016
Funding mechanism:
- Network Innovation Allowance
Fence Feet Improvements
Start date:
Dec 2014
End date:
Aug 2015
Funding mechanism:
- Network Innovation Allowance
Mobile Generation Re-Sync at 11kV and 33kV
Start date:
Jun 2015
End date:
Apr 2017
Funding mechanism:
- Network Innovation Allowance
Gas Quality Study for NTS Unconventional Gas Supplies
Start date:
May 2015
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance

Distribution Asset Thermal Modelling
Start date:
Jul 2015
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
Substation Earth Monitor
Start date:
Apr 2015
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
Pipeline Failure Rate Determination Due To Inland Natural Landsliding
Start date:
Jun 2014
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance
Portable Valve Actuation
Start date:
May 2015
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance

Technologies and strategies to reduce gas leakage expenditure profile
Start date:
Jan 2014
End date:
Jul 2015
Funding mechanism:
- Network Innovation Allowance
NTS Block Valve Connections
Start date:
Apr 2015
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance

Multi-Occupancy Building Cured In Place Lining (Nu Flow)
Start date:
Feb 2015
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance
Project Futurewave
Start date:
Sep 2014
End date:
May 2015
Funding mechanism:
- Network Innovation Allowance
Portable Radiometric Arc Fault Locator (RAFL)
Start date:
Apr 2015
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
Lead Crystal Battery Assessment
Start date:
Apr 2015
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance
Development of “AGI safe”
Start date:
Feb 2014
End date:
Aug 2016
Funding mechanism:
- Network Innovation Allowance

Medium Voltage DC (MVDC)
Start date:
Dec 2014
End date:
Dec 2015
Funding mechanism:
- Network Innovation Allowance
Smart Building Potential Within Heavily Utilised Networks (Re-registered LCNF T1 Project)
Start date:
Apr 2015
End date:
Oct 2016
Funding mechanism:
- Network Innovation Allowance
ECHO – Energy Control for Household Optimisation (Continuation of Project LCNF_WPDT1010)
Start date:
Aug 2013
End date:
Jan 2017
Funding mechanism:
- Network Innovation Allowance
Voltage Control System Integration - D-SVC Phase 2 (Continuation of Project LCNF_WPDT1011)
Start date:
Dec 2014
End date:
Jul 2017
Funding mechanism:
- Network Innovation Allowance
Ultrapole
Start date:
Apr 2015
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
Development of Packaged Solution for Bio Methane Injection
Start date:
Jun 2011
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance
Sealback II
Start date:
Nov 2012
End date:
Sep 2015
Funding mechanism:
- Network Innovation Allowance
New Suite of Transmission Structures
Start date:
Dec 2013
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance
Bridgend Future Modelling
Start date:
Apr 2015
End date:
Jun 2015
Funding mechanism:
- Network Innovation Allowance
Controlled Backfill for Peat Land
Start date:
Mar 2015
End date:
Sep 2016
Funding mechanism:
- Network Innovation Allowance
Protection Settings to Cater for the Evolving Transmission Network
Start date:
Mar 2015
End date:
Jul 2015
Funding mechanism:
- Network Innovation Allowance
Predictive Analytics Part Two
Start date:
Feb 2015
End date:
Nov 2016
Funding mechanism:
- Network Innovation Allowance
High Altitude Aerial Surveillance (HAAS)
Start date:
Jan 2015
End date:
Jul 2018
Funding mechanism:
- Network Innovation Allowance

Hot Tap Buried Sample Probe
Start date:
Jul 2013
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance

Pipeline Installation Techniques
Start date:
Mar 2015
End date:
Jul 2015
Funding mechanism:
- Network Innovation Allowance

Biomethane Connection Guidelines
Start date:
Oct 2013
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance
Demand Allocation Phase 2
Start date:
Feb 2015
End date:
Nov 2015
Funding mechanism:
- Network Innovation Allowance
Predictive Analytics
Start date:
Dec 2012
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance
Smarter Network Control
Start date:
Feb 2015
End date:
Nov 2015
Funding mechanism:
- Network Innovation Allowance
Examination of the relationship between leakage and operating pressure in MP systems
Start date:
Feb 2015
End date:
Dec 2015
Funding mechanism:
- Network Innovation Allowance
SEAMS Analytical Pilot
Start date:
Nov 2013
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance
The impact of biomethane on odorisation in gas distribution networks
Start date:
Feb 2014
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance
Thin Walled PE Liners
Start date:
Jan 2014
End date:
May 2015
Funding mechanism:
- Network Innovation Allowance
Optimise Own Energy Use
Start date:
Jul 2008
End date:
Feb 2015
Funding mechanism:
- Network Innovation Allowance
Resource and asset reuse toolkit
Start date:
Feb 2014
End date:
Feb 2016
Funding mechanism:
- Network Innovation Allowance

Metering and Gas Quality Training Simulator
Start date:
Nov 2013
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance

Alternative Tower Construction
Start date:
Apr 2013
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance
National Transmission System (NTS) Constraint Modelling
Start date:
May 2014
End date:
May 2017
Funding mechanism:
- Network Innovation Allowance

Pressure to Gas (Phase 2)
Start date:
Dec 2014
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance
Management of wastewater
Start date:
Dec 2014
End date:
Jun 2015
Funding mechanism:
- Network Innovation Allowance
Novel vibration measurement technologies
Start date:
Dec 2013
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance

Condition Monitoring of Power Assets (COMPASS)
Start date:
Oct 2014
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance
Pipeline and Farm Equipment Loading Review
Start date:
Oct 2014
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance

PRCI - Pipeline Research Council International 2014
Start date:
Apr 2014
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance

EPRG - European Pipeline Research Group -2014
Start date:
Apr 2014
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance

PRISM (Pipe replacement in situ manufacturing) – Strategy and High Level Plan for Delivery.
Start date:
Oct 2014
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance
Network Investment Stakeholder Engagement
Start date:
Feb 2014
End date:
Feb 2015
Funding mechanism:
- Network Innovation Allowance

Load cycling and radial flow in mass impregnated HVDC Submarine cables
Start date:
Oct 2011
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance
Magnetically Controlled Shunt Reactor (MCSR)
Start date:
Dec 2013
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance
Asset Health Modelling (Pipelines, Special Crossings, Block Valves)
Start date:
Sep 2014
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance
Building Information Modelling (BIM) investigation into enhanced techniques
Start date:
Aug 2014
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance

Dynamic Assessment of Wind Generation Synthetic Inertia Contribution to the GB Power System
Start date:
Oct 2013
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance
Research into sustainable energy and relieving fuel poverty in Multi Storey Buildings
Start date:
Jan 2013
End date:
Jul 2013
Funding mechanism:
- Network Innovation Allowance
Sustainable Commercial Model For Networks
Start date:
Jun 2013
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance
Transformer Intrascope
Start date:
Apr 2013
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance
Insulated Cross Arms – 132kV Trials
Start date:
Apr 2011
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance
DC/DC Converter
Start date:
Sep 2013
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Insulated Cross Arms – Lecht & St Fergus Trials
Start date:
Jan 2010
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance
HVDC Nanocomposite Insulation
Start date:
Jun 2012
End date:
Dec 2015
Funding mechanism:
- Network Innovation Allowance
NIC Proposal Development
Start date:
Jun 2013
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance
HVDC Cable Condition Monitoring System
Start date:
Oct 2013
End date:
Apr 2015
Funding mechanism:
- Network Innovation Allowance
Low Frequency Electricity Transmission Technology Evaluation
Start date:
Dec 2013
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance
Pig trap door seals
Start date:
Feb 2013
End date:
Jan 2014
Funding mechanism:
- Network Innovation Allowance

Asset Health Modelling
Start date:
Oct 2011
End date:
Sep 2013
Funding mechanism:
- Network Innovation Allowance
Alternatives to Venting
Start date:
Apr 2009
End date:
Aug 2013
Funding mechanism:
- Network Innovation Allowance

Development of a Risk Based Asset Management Tool
Start date:
Nov 2013
End date:
Nov 2014
Funding mechanism:
- Network Innovation Allowance

Variable Envelope Compressor Economic Study (VECES)
Start date:
Aug 2014
End date:
Nov 2015
Funding mechanism:
- Network Innovation Allowance

Develop novel mitigation method for high frequency main pipework vibration
Start date:
Feb 2012
End date:
Dec 2014
Funding mechanism:
- Network Innovation Allowance

Feasibility study of onsite non-welded interlocking pipe construction
Start date:
Jul 2014
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance

External Contamination Detection & Measurement at Entry Points
Start date:
Jan 2009
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance

MiniLog Stray Current Monitoring Devices for Cathodic Protection Re-Life
Start date:
Jan 2013
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance

Backup DC drive electronic starter
Start date:
Jun 2012
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance

Study to determine Stress Concentration Factors (SCF) for alternative design on branch connections
Start date:
Feb 2013
End date:
Jul 2014
Funding mechanism:
- Network Innovation Allowance

Tier One Replacement System Stage 4.1
Start date:
Jun 2014
End date:
Dec 2014
Funding mechanism:
- Network Innovation Allowance
Cast Iron Fitness For Purpose (CIFFP)
Start date:
Dec 2013
End date:
Nov 2014
Funding mechanism:
- Network Innovation Allowance
Network Reliability Asset Replacement Decision Support Tool
Start date:
Jul 2014
End date:
Jul 2016
Funding mechanism:
- Network Innovation Allowance
Pipeline Noise Mitigation
Start date:
Jun 2014
End date:
Jun 2016
Funding mechanism:
- Network Innovation Allowance

Pipeline damage measurement using handheld laser scanners
Start date:
May 2014
End date:
Nov 2014
Funding mechanism:
- Network Innovation Allowance

MEG Improvement Phase 2C
Start date:
May 2014
End date:
Sep 2014
Funding mechanism:
- Network Innovation Allowance
Assessment of Electronic (analogue and Numeric) Protection equipment end of life mechanisms
Start date:
Apr 2014
End date:
Feb 2015
Funding mechanism:
- Network Innovation Allowance
Tablet interface for a SF6 mass flow top-up device
Start date:
Oct 2012
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance
Visual & Acoustic Leakage Detection
Start date:
Jun 2013
End date:
Sep 2013
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Overhead Circuits.
Start date:
Apr 2013
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance

EPRI Research Collaboration on Electromagnetic Fields and Radio Frequencies
Start date:
Apr 2013
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance
Internal Stress Corrosion Cracking (ISCC) Assessment Work
Start date:
Mar 2013
End date:
Jun 2014
Funding mechanism:
- Network Innovation Allowance
European Pipeline Research Group (EPRG)
Start date:
Apr 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance

Optimal use of Quick Response (QR) Codes
Start date:
Apr 2014
End date:
Oct 2014
Funding mechanism:
- Network Innovation Allowance
Alternative Riser Pipe Jointing Method - Pyplok
Start date:
Apr 2014
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
Long term demand forecasting for peak days
Start date:
Apr 2014
End date:
Sep 2014
Funding mechanism:
- Network Innovation Allowance
Review and Validation of the current gas demand forecasting methodology
Start date:
Apr 2014
End date:
Dec 2014
Funding mechanism:
- Network Innovation Allowance
Soil & Groundwater Remediation Technologies for Gasworks and Gasholders Sites
Start date:
May 2014
End date:
Nov 2014
Funding mechanism:
- Network Innovation Allowance
Specification Risk Prioritisation
Start date:
Apr 2014
End date:
Oct 2014
Funding mechanism:
- Network Innovation Allowance
Orifice Plate Deformation
Start date:
Feb 2011
End date:
May 2014
Funding mechanism:
- Network Innovation Allowance

Humber Smartzone Pilot Project
Start date:
Jan 2011
End date:
Mar 2017
Funding mechanism:
- Network Innovation Allowance
Frequency sensitive electric vehicle and heat pump power consumption
Start date:
Apr 2014
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance

Alternative Differential Unit Protection for Cable only and Cable & OHL hybrid installations
Start date:
Jan 2012
End date:
Jan 2014
Funding mechanism:
- Network Innovation Allowance
SF6 Capture & Leakage Repair
Start date:
May 2012
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance
Identifying Opportunities and Developments in Electric and Magnetic Fields Research
Start date:
Apr 2013
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance
Impact Assessment of Seismic Analysis on Electricity Towers and Substation Equipment / Structures
Start date:
Feb 2014
End date:
Mar 2016
Funding mechanism:
- Network Innovation Allowance
Wireless Condition Monitoring Sensors with Integrated Diagnostics
Start date:
Jul 2011
End date:
Jul 2014
Funding mechanism:
- Network Innovation Allowance
Long Term Performance of Silicon Based Composite Insulators
Start date:
Oct 2008
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance
Tier One Replacement System Stage 3
Start date:
Feb 2014
End date:
Aug 2014
Funding mechanism:
- Network Innovation Allowance
Demand Allocation
Start date:
Feb 2014
End date:
Feb 2015
Funding mechanism:
- Network Innovation Allowance
33kV Superconducting Fault Current Limiter
Start date:
Oct 2011
End date:
Oct 2015
Funding mechanism:
- Network Innovation Allowance
PRCI - Pipeline Research Council International
Start date:
Apr 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance

MEG Improvement Phase 2B
Start date:
Feb 2014
End date:
Dec 2014
Funding mechanism:
- Network Innovation Allowance
Computer Vision For Cable Tunnels
Start date:
Jun 2013
End date:
Nov 2014
Funding mechanism:
- Network Innovation Allowance
Incident Investigation Review
Start date:
Aug 2013
End date:
Feb 2015
Funding mechanism:
- Network Innovation Allowance
Acoustic Emission Measurements in Valve Leakage Detection and Quantification
Start date:
Feb 2014
End date:
Aug 2015
Funding mechanism:
- Network Innovation Allowance

Risk Assessment Methodologies for Pipelines and AGI’s
Start date:
Apr 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance

Optimisation of severe winter strategy for pipeline isolation valves
Start date:
Jul 2012
End date:
Jan 2014
Funding mechanism:
- Network Innovation Allowance

Variable Envelope Compressors
Start date:
Dec 2012
End date:
Sep 2014
Funding mechanism:
- Network Innovation Allowance

Turbine and Ultrasonic Meter Uncertainty and Error Analysis Tool
Start date:
Jul 2011
End date:
Jan 2014
Funding mechanism:
- Network Innovation Allowance

Toughness of Fittings
Start date:
Feb 2013
End date:
Feb 2014
Funding mechanism:
- Network Innovation Allowance

The Need for Pressure De-rating Prior To In-Service Welding
Start date:
Oct 2012
End date:
May 2014
Funding mechanism:
- Network Innovation Allowance

Standards Mapping Tool (SMT)
Start date:
Aug 2013
End date:
Feb 2014
Funding mechanism:
- Network Innovation Allowance

Pipeline Risk Ranking Phase II
Start date:
Sep 2013
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance

P9 Semi-Mechanised Hot Tap Welding
Start date:
Mar 2013
End date:
Nov 2013
Funding mechanism:
- Network Innovation Allowance

Epoxy sleeves in place of heavy wall pipe
Start date:
Nov 2012
End date:
Jul 2013
Funding mechanism:
- Network Innovation Allowance

Direct Replacement Preheat Package (DRPP)
Start date:
Jul 2013
End date:
May 2014
Funding mechanism:
- Network Innovation Allowance

Development of AC OHL survey system and evaluation of ER probes
Start date:
Oct 2009
End date:
Feb 2014
Funding mechanism:
- Network Innovation Allowance

Daily gas demand forecasting
Start date:
May 2011
End date:
Sep 2014
Funding mechanism:
- Network Innovation Allowance

BIM (Building Information Modelling)
Start date:
Jun 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance

Assessment of hydrophobic treatment for gas compressor air intake values & screens
Start date:
Dec 2012
End date:
Dec 2013
Funding mechanism:
- Network Innovation Allowance

Architectural Design of Compressor Site
Start date:
Feb 2013
End date:
Jan 2014
Funding mechanism:
- Network Innovation Allowance

Venting Controllers
Start date:
Jul 2012
End date:
Sep 2013
Funding mechanism:
- Network Innovation Allowance
Tier One Replacement System (TORS)
Start date:
Jul 2013
End date:
Oct 2013
Funding mechanism:
- Network Innovation Allowance
PE Asset Life Research
Start date:
Jul 2010
End date:
Dec 2013
Funding mechanism:
- Network Innovation Allowance
MEG Improvement
Start date:
Jun 2012
End date:
Aug 2013
Funding mechanism:
- Network Innovation Allowance
Demand Scaling
Start date:
Oct 2013
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance
CISBOT 18” Cast Iron Demonstration
Start date:
Sep 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance
Alternative Jointing Techniques for Small Diameter PE Pipe
Start date:
Sep 2013
End date:
Jan 2014
Funding mechanism:
- Network Innovation Allowance
Thermal Efficiency Trials
Start date:
Jul 2013
End date:
Jan 2015
Funding mechanism:
- Network Innovation Allowance
Identification and Mitigation of Large Equipment Transport Issues
Start date:
Jan 2014
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance
Feasibility Study for Alternative Pipeline Materials
Start date:
Jan 2014
End date:
Jul 2014
Funding mechanism:
- Network Innovation Allowance

SCT Pipeline Inspection System
Start date:
Jan 2014
End date:
Apr 2016
Funding mechanism:
- Network Innovation Allowance

Pressure to Gas
Start date:
Jan 2014
End date:
Sep 2014
Funding mechanism:
- Network Innovation Allowance
Manual Phased Array for small diameter offtake weld inspection.
Start date:
Dec 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance

Renewable Power on Remote Installations
Start date:
Oct 2013
End date:
Oct 2014
Funding mechanism:
- Network Innovation Allowance

Reliability Assessment of System Integrity Protection Schemes (SIPS)
Start date:
Oct 2012
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance
Transformer & System Reliability
Start date:
Oct 2010
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance
Heat in the Soil Form - Assessment of heat in soil caused by buried infrastructure
Start date:
Sep 2013
End date:
Sep 2014
Funding mechanism:
- Network Innovation Allowance

Control of Debris and Dust from the Treatment of Grade 4 Tower Steelwork (G4T)
Start date:
Nov 2013
End date:
Nov 2014
Funding mechanism:
- Network Innovation Allowance
Understand and Improving Condition, Performance, and Life Expectancy of Substation Assets
Start date:
Dec 2013
End date:
Jun 2014
Funding mechanism:
- Network Innovation Allowance
Combustible Gases in Redundant Oil Filled Cables
Start date:
Dec 2013
End date:
Jun 2014
Funding mechanism:
- Network Innovation Allowance
Cable Stripping Truck
Start date:
Dec 2013
End date:
Jun 2014
Funding mechanism:
- Network Innovation Allowance
13kV Shunt Reactor Refurbishment
Start date:
Dec 2013
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance
Voltage Optimiser Pilot
Start date:
Aug 2011
End date:
Aug 2014
Funding mechanism:
- Network Innovation Allowance
Trial & Performance Assessment of ACCR Conductor (3M)
Start date:
Sep 2011
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance
Fibre-optic Acoustic Monitoring
Start date:
Sep 2012
End date:
May 2015
Funding mechanism:
- Network Innovation Allowance
ThermoMechanical Forces in XLPE Cable
Start date:
Jul 2012
End date:
Jan 2016
Funding mechanism:
- Network Innovation Allowance
Evaluation of Inspection Techniques for Sleeved Crossings
Start date:
Jul 2013
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance

Ramp Rate Study System
Start date:
Oct 2013
End date:
Apr 2014
Funding mechanism:
- Network Innovation Allowance

On Site Chemical Analysis of Pipeline Materials
Start date:
Sep 2013
End date:
Jan 2014
Funding mechanism:
- Network Innovation Allowance

Development of a new design vent silencer
Start date:
Aug 2012
End date:
Aug 2015
Funding mechanism:
- Network Innovation Allowance

Compressor Balance of Plant Environmental Study
Start date:
Aug 2013
End date:
Mar 2015
Funding mechanism:
- Network Innovation Allowance

Gas quality limits in emergency situations
Start date:
Apr 2013
End date:
Mar 2014
Funding mechanism:
- Network Innovation Allowance

Combined Accurate Detection with Minimal Excavation
Start date:
Aug 2013
End date:
Dec 2013
Funding mechanism:
- Network Innovation Allowance
Carbon Monoxide Gascoseeker
Start date:
Nov 2011
End date:
Nov 2013
Funding mechanism:
- Network Innovation Allowance
Renewable Technology Used for Pre-Heating Feasibility Study
Start date:
Jun 2012
End date:
Mar 2013
Funding mechanism:
- Network Innovation Allowance
Study of proposed sources and quantities of Biomethane to Grid
Start date:
Dec 2012
End date:
Sep 2013
Funding mechanism:
- Network Innovation Allowance
LV Interconnected Pairs
Start date:
May 2021
End date:
May 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Inertia Measurement in Island Networks
Start date:
May 2021
End date:
Mar 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Probabilistic Machine Learning Solution for Dynamic Reserve Setting
Start date:
May 2021
End date:
Apr 2022
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- NIA RIIO-2

Enhanced LFDD
Start date:
Jun 2021
End date:
Dec 2022
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
FI-0001 HyNet Homes – Understand Phase (technical)
Start date:
Jul 2021
End date:
Jun 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
CH4RGE – Methane Reduction from Gas Equipment (Stage 2)
Start date:
May 2021
End date:
Mar 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

FI-0003 - Common future end states and transition pathways
Start date:
Jun 2021
End date:
Jun 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
5G – The art of the possible
Start date:
Jun 2021
End date:
Mar 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Hydrogen Deblending Feasibility Phase 2
Start date:
Nov 2021
End date:
Oct 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

HyNTS - Hydrogen Fuel Gas for NTS Compressors
Start date:
Sep 2021
End date:
Jul 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Project Vulnerability and Energy Networks, Identification and Consumption Evaluation (VENICE)
Start date:
Jul 2021
End date:
Aug 2023
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-1
FI-0002 Hydrogen Village Consumer Research
Start date:
Jun 2021
End date:
Dec 2021
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Alternative Jointing Techniques
Start date:
Jul 2021
End date:
Nov 2022
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- NIA RIIO-1
Stability Market Design
Start date:
Jun 2021
End date:
Dec 2021
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

SWIC Hydrogen Supply Pipeline Infrastructure
Start date:
Jul 2021
End date:
Jan 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Regional Decarbonisation Pathways
Start date:
Jul 2021
End date:
Jul 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Net Zero Service Termination Project
Start date:
Aug 2021
End date:
Aug 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
LV Predict
Start date:
Jul 2021
End date:
Jan 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Resilient Electric Vehicle Charging: “REV”
Start date:
Jul 2021
End date:
Dec 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

SWIC Market-Accelerating Hydrogen Distribution and Storage
Start date:
Aug 2021
End date:
Jan 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Biomethane Study
Start date:
Sep 2021
End date:
Jan 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
ADAPT-DC
Start date:
Sep 2021
End date:
Sep 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
HGR&D ST - Assessment Methodologies
Start date:
Jul 2021
End date:
Mar 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Empower
Start date:
Sep 2021
End date:
Feb 2023
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-1
Innovative Replacement for Underground Substations
Start date:
Sep 2021
End date:
Oct 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Energy Storage Strategy
Start date:
Aug 2021
End date:
Sep 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Impedance Scan Methods
Start date:
Jun 2023
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
H21 Occupied Trials Phase 1 - Safety Case
Start date:
Sep 2021
End date:
Dec 2021
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Tools of Engagement Phase 2
Start date:
Sep 2021
End date:
Jul 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Consumer Vulnerability Impact Assessment Tool
Start date:
Sep 2021
End date:
Dec 2021
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-2
Solar PV Nowcasting
Start date:
Sep 2021
End date:
Jul 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Reactive Power Market Design
Start date:
Sep 2021
End date:
Jul 2022
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- NIA RIIO-2

Grangemouth to Granton LTS Futures
Start date:
Sep 2021
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
H100 ‘town’ Expansion-Storage Solution: Balgonie Feasibility Study
Start date:
Sep 2021
End date:
Jul 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Virtual OHL Inspections: Combining Statutory Inspection & Condition Based Assessment (CBA)
Start date:
Oct 2021
End date:
Jan 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Phoenix IIoT Demonstrator
Start date:
Oct 2021
End date:
Oct 2022
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
H21 - Wider Impacts of Hydrogen
Start date:
Oct 2021
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
FI-0004 HyNet – Management of Additional Sources of Hydrogen Supply
Start date:
Jul 2021
End date:
Jan 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Introduction of Process mining enabler into SP Energy Networks
Start date:
Oct 2021
End date:
Dec 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Pre-Fix
Start date:
Oct 2021
End date:
Jan 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Data Sharing Protocols
Start date:
Oct 2021
End date:
Dec 2022
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Industrial & Commercial Plant Hydrogen Sensitivity Assessment
Start date:
Oct 2021
End date:
Dec 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
IoT Pressure Sensor Pilot
Start date:
Oct 2021
End date:
Mar 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Switching vulnerable consumers to hydrogen
Start date:
Oct 2021
End date:
Aug 2022
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-2
SWIC: Assessment of potential hydrogen demand in 2030 - 2050
Start date:
Oct 2021
End date:
Sep 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Customer Vulnerability Mapping Tool
Start date:
Oct 2021
End date:
Dec 2022
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-2
Retrofitting Oil Source Heat Recovery to Transformers
Start date:
Nov 2021
End date:
Oct 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
North East Scotland Pre-FEED
Start date:
Oct 2021
End date:
Dec 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HyPurge
Start date:
Oct 2021
End date:
Apr 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Silent Power II
Start date:
Oct 2021
End date:
Mar 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
The Value of Flexible Heat Demand as a Service to Distribution Networks
Start date:
Sep 2021
End date:
Mar 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Active Creosote Extraction (ACE)
Start date:
Nov 2021
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Advanced Dispatch Optimisation
Start date:
Nov 2021
End date:
Jul 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

HyDew
Start date:
Nov 2021
End date:
Mar 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Heat - Discovery Continuation
Start date:
Feb 2022
End date:
Dec 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Role and value of electrolysers in low-carbon GB energy system
Start date:
Sep 2022
End date:
Dec 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Asset Reuse and Recovery Collaboration (ARRC) - Discovery Continuity
Start date:
Feb 2022
End date:
Dec 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Predict4Resilience - Discovery Continuity
Start date:
Feb 2022
End date:
Dec 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Multifunctional graphene coatings for pipeline protection
Start date:
Jan 2022
End date:
Apr 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

H100 Fife Phase 2 Village Pre-FEED
Start date:
Oct 2021
End date:
Apr 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HyNTS FutureGrid Phase 1 – Transmission Test Facility NIC
Start date:
Apr 2021
End date:
Dec 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIC

HyScale Academic Review
Start date:
Dec 2021
End date:
Feb 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Levenmouth Wastewater Treatment Works
Start date:
Dec 2021
End date:
Jul 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Recommissioning Grangemouth to Granton
Start date:
Nov 2021
End date:
Nov 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Long Term, Large Scale Hydrogen Storage Database
Start date:
Nov 2021
End date:
Feb 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Level-Up
Start date:
Dec 2021
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Decarbonisation of Heat – Integrated Market Study
Start date:
Dec 2021
End date:
Mar 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

A Statistical model for determining cut out failures
Start date:
Dec 2021
End date:
Jun 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Inhibition of Hydrogen Embrittlement Effects in Pipeline Steels
Start date:
Dec 2021
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

NTS Materials Testing to Enable Hydrogen Injection in High Pressure Pipelines
Start date:
Dec 2021
End date:
Nov 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Optimal Outage Planning System
Start date:
Dec 2021
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

A Common Framework for a Virtual Energy System
Start date:
Dec 2021
End date:
Sep 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Approach for Long-term Planning accounting for Carbon Assessment (ALPACA)
Start date:
Jan 2022
End date:
Mar 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Flexible Operation of Water Networks Enabling Response Services (FLOWERS)
Start date:
Jan 2022
End date:
Jul 2023
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- NIA RIIO-1
Assessment of Climate Change Event Likelihood Embedded in Risk Assessment Targeting Electricity Distribution (ACCELERATED)
Start date:
Jan 2022
End date:
Mar 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Visual Inspection and Condition Assessment Platform for OHL Steelwork (VICAP)
Start date:
Apr 2022
End date:
Sep 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Alternative Approaches to Tower Painting Preparation
Start date:
Feb 2022
End date:
Jan 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Overhead Line Sagging Monitoring Using 5G Signals
Start date:
Jul 2022
End date:
Oct 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Technical assessment and feasibility study into water requirements for hydrogen production
Start date:
Jan 2022
End date:
Aug 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Servitudes and Easements
Start date:
Jan 2022
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Community DSO
Start date:
Jan 2022
End date:
Dec 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
The Role for Hydrogen as an Electricity System Asset
Start date:
Jan 2022
End date:
Mar 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Low Profile 132kV Steel Poles
Start date:
Jan 2022
End date:
Nov 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hyperspectral Imaging
Start date:
Jan 2022
End date:
Jul 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Collaborative Visual Data Twin Phase 1
Start date:
Feb 2022
End date:
Jan 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Gas and electricity transmission infrastructure outlook
Start date:
Feb 2022
End date:
Jan 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Street Score 2
Start date:
Feb 2022
End date:
Jan 2023
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Secure Edge Platform
Start date:
May 2022
End date:
Aug 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Environmental Risk and Assurance (ERA)
Start date:
Jan 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Decarbonising Utility Transport using Whole System Thinking
Start date:
Feb 2022
End date:
Nov 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Bio CNG – SIU Feasibility Study
Start date:
Feb 2022
End date:
Feb 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Neighbourhood Green
Start date:
Feb 2022
End date:
Feb 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Emerge
Start date:
Feb 2022
End date:
Aug 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Community Resilience
Start date:
Mar 2022
End date:
Dec 2023
Status:
Live
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-2
Glenmavis Masterplan Options Appraisal
Start date:
Jan 2022
End date:
Aug 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
'D3' - Data-driven Network Dynamic Representation for Derisking the HVDC and Offshore Wind
Start date:
Feb 2022
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Demand Forecasting Encapsulating Domestic Efficiency Retrofits (DEFENDER)
Start date:
Mar 2022
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Variable Hydrogen Blend Compression
Start date:
Mar 2022
End date:
Dec 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Centralised PAC
Start date:
Aug 2022
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Smart Meter Innovations and Test Network (SMITN)
Start date:
Mar 2022
End date:
Jul 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Hydrogen Entry Unit Design
Start date:
Feb 2023
End date:
Aug 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Stratus
Start date:
Apr 2022
End date:
Sep 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Automated Transformer Monitoring System
Start date:
Mar 2022
End date:
Aug 2023
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Probabilistic planning for stability constraints
Start date:
Jan 2022
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Autonomous Aerial, Thermal Inspections of Substations
Start date:
May 2022
End date:
Dec 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Probabilistic Modelling for Connection Studies
Start date:
Mar 2022
End date:
Mar 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
FI 0015 Hydrogen Blending: Functional Spec for Commercial Frameworks (Phase A)
Start date:
Apr 2022
End date:
Jul 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
FI-0017 - Exit Strategy Mechanism
Start date:
Apr 2022
End date:
Mar 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Customer Led Electric Vehicle Early Registration (CLEVER)
Start date:
Apr 2022
End date:
Nov 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Low Power Hot Water
Start date:
Apr 2022
End date:
Nov 2023
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-2
Hydrogen Economy: Reassessing Approaches to Connecting Large Electrolyser Sites (HERACLES)
Start date:
Apr 2022
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Retrofit Excess Flow Valves (EFVs)
Start date:
May 2022
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Failure Modes and Permeation Testing of PE
Start date:
May 2022
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
SWIC - Hydrogen Peaking Plant Feasibility Study
Start date:
Apr 2022
End date:
Mar 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Fibre Health Monitoring
Start date:
Aug 2022
End date:
Jan 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Portable – Low Voltage Fault Passage Indicators (Portable – LV FPI)
Start date:
May 2022
End date:
Mar 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Hydrogen Skills & Competencies (HGR&D NSIB)
Start date:
Aug 2022
End date:
Sep 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2

TOTEM (Transmission Owner Tools for EMT Modelling) Extension
Start date:
May 2022
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Project Synthesis – Effective Regional Inertia Monitoring and Automatic Control with a Whole System Approach (T2)
Start date:
Apr 2022
End date:
Mar 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
FI-0011 - Functional Specification: Hydrogen Blending Infrastructure
Start date:
May 2022
End date:
Mar 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Novel methods for sealing SF6 leaks
Start date:
Jun 2022
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Assessment of Legacy Gas Pipeline Steels to Hydrogen Embrittlement Effects
Start date:
Sep 2022
End date:
Mar 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

New Pipeline AI Route Planning
Start date:
Jun 2022
End date:
Sep 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Industrial Fuel Switching Phase One
Start date:
Jun 2022
End date:
Jan 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Leakage Management in the Energy System Transition
Start date:
Jun 2022
End date:
Feb 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Vulnerability in the Energy System Transition
Start date:
Jun 2022
End date:
Jun 2023
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-1
H21 Ignition Consequence Research
Start date:
Feb 2023
End date:
Jan 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
ATEX Equipment & SR/25 Modification Assessment
Start date:
Jul 2022
End date:
Apr 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Impact of Hydrogen on NTS Polymer / Elastomer Materials – Phase 1
Start date:
Jun 2022
End date:
Feb 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

New online tools for Assessment of Bushing Condition
Start date:
Jul 2022
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Solving Intelligent LV – Evaluating Responsive Smart Management to Increase Total Headroom (SILVERSMITH)
Start date:
Jun 2022
End date:
May 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Generating Additional Markets for Mature Access to Flexibility (GAMMA Flex)
Start date:
Jun 2022
End date:
Mar 2023
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- NIA RIIO-1
Running Cool
Start date:
Jun 2022
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
ANM - Balancing Coordination Demonstration (ABCD)
Start date:
Jun 2022
End date:
May 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-1
System value from V2G peak reduction in future scenarios based on strategic transport and energy demand modelling
Start date:
Jul 2022
End date:
Jan 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Cable Alternative Cooling Technologies for Underground Systems (CACTUS)
Start date:
Jul 2022
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Navigator
Start date:
Jul 2022
End date:
Sep 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
H100 Specific Fire & Risks
Start date:
Jun 2022
End date:
Apr 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen MOBS Data Analysis Phase 1
Start date:
Jun 2022
End date:
Sep 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HOMEflex (Household or Microbusiness Energy Flexibility)
Start date:
Jun 2022
End date:
May 2024
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- NIA RIIO-1
FIC (Future of Interconnectors)
Start date:
Jul 2022
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

HyScale LOHC Phase 2 Project
Start date:
Jun 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Improving Carbon Monoxide Awareness
Start date:
Apr 2022
End date:
Feb 2023
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Security of Supply for Vulnerable Consumers (SSVC)
Start date:
Aug 2022
End date:
Sep 2024
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-1
Switch Oil Markers
Start date:
Aug 2022
End date:
May 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Village Safety Framework
Start date:
Jul 2022
End date:
Dec 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
VFES - Vulnerability Future Energy Scenarios
Start date:
Aug 2022
End date:
Mar 2024
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-1
PSR Communication Review
Start date:
Sep 2022
End date:
Feb 2023
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-1
Project Helix
Start date:
May 2022
End date:
Mar 2024
Status:
Live
Strategy themes:
- Consumer vulnerability
Funding mechanism:
- NIA RIIO-2
Insulating Dielectrics: Esters & Alternative Liquids
Start date:
Sep 2022
End date:
Feb 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Interventions for Hydrogen by Asset Group
Start date:
Aug 2022
End date:
Jan 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Village Trial Hydrogen Appliance Supply Chain
Start date:
Aug 2022
End date:
Mar 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Rural Electrification 2.0
Start date:
Aug 2022
End date:
Dec 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
High Voltage (HV) Auto Quote
Start date:
Sep 2022
End date:
Jun 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Data Historian Replacement
Start date:
May 2022
End date:
Mar 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Enhance Power Flow Control Capability of GB Network
Start date:
Sep 2022
End date:
Nov 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Ice Mapping
Start date:
Aug 2022
End date:
Feb 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Hydrogen Conversion Strategy - Pipework
Start date:
Aug 2022
End date:
Aug 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Use of Automatic Isolation Valve (AIV) Systems with Hydrogen – AIVs in LP and MP Services
Start date:
Aug 2022
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Q-Flex
Start date:
Sep 2022
End date:
Aug 2023
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- NIA RIIO-1
Automated Identification of Sub-Synchronous Oscillations (SSO) Events
Start date:
Sep 2022
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Strength to Connect
Start date:
Oct 2022
End date:
Mar 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

LV Fault Passage Indicator
Start date:
Sep 2022
End date:
Jun 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Enduring Cross-Border Balancing
Start date:
Sep 2022
End date:
Mar 2023
Strategy themes:
- Flexibility and commercial evolution
Funding mechanism:
- NIA RIIO-2

Research the Impact of Hydrogen on CP & Degradation of Coatings
Start date:
Oct 2022
End date:
May 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

CageCapture™ SF6 Flange Guard
Start date:
Sep 2022
End date:
Feb 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
CageCapture™ ™ SF6 Paint Detection
Start date:
Sep 2022
End date:
Jan 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
NeatHeat
Start date:
Sep 2022
End date:
Jun 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Inertia Measurement Method Optimisation
Start date:
Sep 2022
End date:
Sep 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Peak Demand Forecasting
Start date:
Aug 2022
End date:
Jan 2023
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2

Hydrogen Production Technologies on the NTS
Start date:
Oct 2022
End date:
Apr 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

SR25 Calculator update
Start date:
Sep 2022
End date:
Dec 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
End User Behaviour – Impact on Safety
Start date:
Aug 2022
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hypurge Safe Tooling
Start date:
Sep 2022
End date:
Feb 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
A Needs based segmentation of Low Income and Vulnerable Customers
Start date:
Sep 2022
End date:
Mar 2023
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-1
Ignition Probability in Small Services
Start date:
Sep 2022
End date:
Mar 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Non-intrusive Tower Foundation Inspections using UGW (NITFI)
Start date:
Oct 2022
End date:
Sep 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Implications of Hydrogen Purity
Start date:
Sep 2022
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Potential for Salt cavern storage of hydrogen in and near South Wales
Start date:
Sep 2022
End date:
Feb 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Gas & Fire Detection and Suppression – Hydrogen Compression
Start date:
Oct 2022
End date:
Aug 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

REVEAL
Start date:
Sep 2022
End date:
Jan 2023
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2

LPG to Hydrogen Village: Feasibility and concept design
Start date:
Oct 2022
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HyCompact Laboratory Testing
Start date:
Sep 2022
End date:
Aug 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Power Protect
Start date:
Oct 2022
End date:
May 2024
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Energy water nexus
Start date:
Mar 2023
End date:
Nov 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
AI Centre of Excellence
Start date:
Sep 2022
End date:
Dec 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

COMMANDER – Coordinated Operational Methodology for Managing and Accessing Network Distributed Energy Resources
Start date:
Oct 2022
End date:
Jan 2024
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2

Automated Tunnel and Shaft inspections
Start date:
Oct 2022
End date:
Oct 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Hydrogen for Industrial Estate Heating
Start date:
Nov 2022
End date:
Jan 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Precision Thermography for Hydrogen Pipelines Inspection
Start date:
Oct 2022
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Dynamic Risk Based Patrolling
Start date:
Oct 2022
End date:
Apr 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Identification of NTS Opportunities in the Transport Sector
Start date:
Nov 2022
End date:
Sep 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Shift 2.0
Start date:
Oct 2022
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Our View
Start date:
Oct 2022
End date:
Feb 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
EUSE – Hazardous Areas Within Buildings
Start date:
Nov 2022
End date:
Jan 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
EUSE - Ventilation Within Buildings
Start date:
Nov 2022
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HVT Legislative and Regulatory Analysis
Start date:
Aug 2022
End date:
Mar 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Asset Data Intelligence
Start date:
Aug 2022
End date:
Jan 2023
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2
TapSOS – Digitalisation of the emergency number – Phase 1
Start date:
Aug 2022
End date:
Nov 2022
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Wide Area Control Framework
Start date:
Jan 2023
End date:
Oct 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Easy Assist Remote Actuation
Start date:
Nov 2022
End date:
Feb 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Powercast
Start date:
Nov 2022
End date:
Feb 2024
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-1
Truly Sustainable D&T Substations
Start date:
Nov 2022
End date:
May 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Impact of Hydrogen & Hydrogen Blends on Linepack
Start date:
Jan 2023
End date:
Jan 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

BC Forecasting
Start date:
Nov 2022
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

3MD (Market Monitoring Model Development)
Start date:
Nov 2022
End date:
Oct 2023
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2

Virtual Energy System – Common Framework Demonstrator
Start date:
Nov 2022
End date:
Jul 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2

Technical and Commercial Impact of High Pressure Carbon Transportation
Start date:
Nov 2022
End date:
Apr 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Supporting vulnerable residents during power cuts
Start date:
Oct 2022
End date:
Mar 2023
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Smart Gas Pressure Sensor
Start date:
Sep 2023
End date:
Feb 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Consumer Building Blocks
Start date:
Nov 2022
End date:
Jul 2023
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2

Service Provider Capability Mapping
Start date:
Oct 2022
End date:
Jan 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

FutureGrid Phase 1 – 5% Hydrogen Blend Test
Start date:
Dec 2022
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Hydrogen Village - Property Market Evaluation
Start date:
Nov 2022
End date:
Apr 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Visualising the opportunity for pipeline hydrogen for mobility applications
Start date:
May 2023
End date:
Dec 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Storm AI
Start date:
Dec 2022
End date:
Mar 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
H2London Feasibility Study
Start date:
Nov 2022
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HyLights: Hydrogen Gas Lamp Feasibility
Start date:
Dec 2022
End date:
Mar 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen for Aviation
Start date:
Jan 2023
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HyNTS Variable Gas Blend Metering and Gas Analyser System Development - Phase 1
Start date:
Jan 2023
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Hydrogen Village Regulation Project
Start date:
Feb 2023
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Multi Gas Detection
Start date:
Jan 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Safe venting & recompression of hydrogen
Start date:
Jan 2023
End date:
Dec 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Digital Exclusion
Start date:
Feb 2023
End date:
Sep 2023
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Lessons from the Past: What can we learn from past energy transitions in the Gas Industry
Start date:
Jan 2023
End date:
Aug 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Carbon Intensity Modelling
Start date:
Jan 2023
End date:
Dec 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Co-optimisation of Energy and Frequency-containment services (COEF)
Start date:
Jan 2023
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Swarfless Cut Isolation System for SF6 Outages and Repairs (SCISSORs)
Start date:
Feb 2023
End date:
Oct 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Future of the Transmission Network Charging Methodology
Start date:
Jan 2023
End date:
Mar 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Corrosion Mapping
Start date:
Feb 2023
End date:
Apr 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Hydrogen MOBS Asset Information Review Phase 2
Start date:
Jan 2023
End date:
May 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Common Planning Pathways
Start date:
Feb 2023
End date:
Aug 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

DETECTS II
Start date:
Mar 2023
End date:
Feb 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Distributed ReStart – Redhouse Live Trial
Start date:
Feb 2023
End date:
Dec 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Course-correction Dispatch Instructor
Start date:
Feb 2023
End date:
Mar 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Switchgear Requirements for Future Networks
Start date:
Mar 2023
End date:
Mar 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Revamp Interconnector Ramping Arrangements (RIRA)
Start date:
Feb 2023
End date:
Apr 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Hydrogen Production for Thermal Electricity Constraints Management
Start date:
Mar 2023
End date:
Aug 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Green Heat for Local Communities (GHLC)
Start date:
Apr 2023
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Fluid Cable Care Phase 3
Start date:
Mar 2023
End date:
Sep 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Step Up Transformer
Start date:
Mar 2023
End date:
Dec 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
European Hydrogen Distribution Insights
Start date:
Apr 2023
End date:
Jun 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
High Volume Gas Escapes Tool – update for hydrogen
Start date:
Mar 2023
End date:
May 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
PSR Resilience System
Start date:
Apr 2023
End date:
Mar 2024
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-1
Whole Energy System Network Planning Review
Start date:
Mar 2023
End date:
Jul 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2

Integrated Hydrogen Transport Hubs
Start date:
Mar 2023
End date:
Apr 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
XR Facilitating Training and Operations (X-FacTOR)
Start date:
May 2023
End date:
Dec 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Readi
Start date:
Mar 2023
End date:
Mar 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
Power Supply for Pole Mounted LV Monitoring Devices where no Neutral is Present.
Start date:
Mar 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
Resilient and Flexible Railway Multi-Energy Hub Networks for Integrated Green Mobility (Hubs)
Start date:
Feb 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
DER Visibility
Start date:
Mar 2023
End date:
May 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Open Innovation Phase 2
Start date:
Apr 2023
End date:
Apr 2024
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-1
STARTZ (Stability Requirements Calculation Toward Net-Zero)
Start date:
Mar 2023
End date:
Aug 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Orbital Eye
Start date:
Apr 2023
End date:
Oct 2023
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
BISEP - H2 Testing with LTS Futures (Phase 1)
Start date:
Mar 2023
End date:
Sep 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Appliance Supply Chain - Technical Specification & Development Strategy
Start date:
Mar 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
EasyKey
Start date:
Apr 2023
End date:
Jan 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Hydrogen Storage Feasibility Study
Start date:
May 2023
End date:
Sep 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Collaborative Visual Data Twin - Phase 2 (CVDT)
Start date:
May 2023
End date:
May 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Network Intelligence through Probabilistic Risk Assessment Methodology (NIPRAM) to improve electricity system restoration
Start date:
Jul 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HVT Appliance Development Business Case
Start date:
Apr 2023
End date:
Sep 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Autonomous Inspection & Monitoring of High Voltage Assets (AIM High)
Start date:
Jun 2023
End date:
Oct 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Vulnerability Visualisation Tool Phase 2
Start date:
Mar 2023
End date:
Mar 2024
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Stopple Testing to 100% Hydrogen
Start date:
Jun 2023
End date:
Sep 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Model-driven Strategy for Balancing Optimisation (MSBO)
Start date:
Apr 2023
End date:
Jun 2024
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2

AGI Pipework Integrity Monitoring for Hydrogen – Phase 1
Start date:
Jun 2023
End date:
Dec 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Probabilistic Projections
Start date:
Jun 2023
End date:
Dec 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Characteristics of hydrogen and natural gas blends in the NTS
Start date:
Jun 2023
End date:
May 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Hydrogen Technical and Safety Case for Domestic Heat
Start date:
Apr 2023
End date:
Aug 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Network Diversification & Resilience
Start date:
Aug 2023
End date:
Nov 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Net Zero Infrastructure Planning - Risks & Opportunities
Start date:
Jun 2023
End date:
Oct 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Understanding the Whole System Impacts of Nuclear Co-Generation on Electricity Transmission Infrastructure
Start date:
Aug 2023
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Gas Control System – Impact Assessment (Future requirements)
Start date:
Jun 2023
End date:
Jan 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Domestic Hydrogen Sensor Research
Start date:
Jun 2023
End date:
Feb 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
MASiP- Digital Integrated Monitoring System
Start date:
Sep 2023
End date:
Dec 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Vorte Heating Solution
Start date:
Aug 2023
End date:
Jan 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Hydrogen Fuel Gas for GTs – Emissions Impact
Start date:
Jul 2023
End date:
Nov 2023
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Impact of Hydrogen on NTS Oils & Greases – Phase 1
Start date:
Jul 2023
End date:
Jan 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Impact of Hydrogen on NTS actuators
Start date:
Jul 2023
End date:
Jul 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

National Gas Customer Centricity
Start date:
Jul 2023
End date:
Jul 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Dispatch Optimiser Transformation (DOT)
Start date:
Jul 2023
End date:
Dec 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Forecasting the Risk of Congestion
Start date:
Jun 2023
End date:
Dec 2023
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2

Aerial inspections of OHLs from Beyond Visual Line of Sight (BVLOS)
Start date:
Mar 2024
End date:
Dec 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Supporting Off-Grid Communities
Start date:
Jul 2023
End date:
Aug 2024
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
RealSim: Real-Time Phasor-EMT Simulations
Start date:
Jun 2023
End date:
Nov 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

OHL Collision Avoidance
Start date:
Aug 2023
End date:
Feb 2025
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Demand Flexibility Service Evaluation
Start date:
May 2023
End date:
Apr 2024
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2

QWID FLEXER
Start date:
Sep 2023
End date:
Feb 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Compressor Fleet Failure Mode and Effects Analysis for Hydrogen
Start date:
Sep 2023
End date:
May 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

New Approach to Losses
Start date:
Sep 2023
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen compatibility of components - Phase 2: Further analysis
Start date:
Aug 2023
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Data-Driven Online Monitoring and Early Warning for GB System Stability (DOME)
Start date:
Jul 2023
End date:
Dec 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Alternative Metering (Baselines)
Start date:
Sep 2023
End date:
Mar 2024
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2

Satelline
Start date:
Sep 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Linepack opportunities in the current and future energy system
Start date:
Sep 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

The Economics of Electrolysers Using Curtailed Electricity
Start date:
Sep 2023
End date:
Nov 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Lower Cost Excavation and Repair for Hydrogen Pipelines
Start date:
Sep 2023
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Hy-Voltage
Start date:
Oct 2023
End date:
Sep 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Exploring the Economic Benefits of Co-optimising Procurement of Energy, Response and Reserve
Start date:
Sep 2023
End date:
Mar 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Dispersion of Helium Releases in Domestic Properties
Start date:
Sep 2023
End date:
Jul 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen MOBs QRA and Testing Phase 3
Start date:
Oct 2023
End date:
Jun 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HyNTS Dataset - Physical Data Extraction (ILI)
Start date:
Oct 2023
End date:
May 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

InterCast
Start date:
Oct 2023
End date:
Dec 2023
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2

Trial on Implementation of Wide Area Monitoring and Control System (WAMCS)
Start date:
Sep 2023
End date:
Aug 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

MinGFM
Start date:
Sep 2023
End date:
Feb 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Ancillary Components Product Suitability for Use with Hydrogen - Verification Evidence
Start date:
Oct 2023
End date:
May 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hazardous Areas Impact Mitigation Phase 1
Start date:
Nov 2023
End date:
Jan 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen MOBs Standards and Procedures Phase 4
Start date:
Oct 2023
End date:
Jun 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Additional Welfare Decision Tool Phase 2
Start date:
Oct 2023
End date:
Aug 2024
Status:
Live
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Great Britain Hydrogen Distribution QRA
Start date:
Oct 2023
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Modelling Hydrogen Impact on Pipeline Steels (HIPS) – Phase 1
Start date:
Dec 2023
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

BESS P28
Start date:
Nov 2023
End date:
Nov 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Technical and Safety Case for Domestic Heat – Phase 2
Start date:
Nov 2023
End date:
Jan 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
VoltaVisor
Start date:
Oct 2023
End date:
Mar 2024
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

Emissions Mitigations – Purging for a Hydrogen Future
Start date:
Nov 2023
End date:
May 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
FastOut
Start date:
Oct 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

GB Inertia Forecasting with Regional Extrapolation
Start date:
Dec 2023
End date:
May 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Virtual Energy System: Common Socio-technical Framework Development
Start date:
Nov 2023
End date:
Feb 2024
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2

MASiP H2 Technical & System Development
Start date:
Dec 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Materials Qualification for Hydrogen TD1 Pipelines
Start date:
Dec 2023
End date:
Nov 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Farm of the Future
Start date:
Feb 2024
End date:
Nov 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Hydrogen Ignition Risk from Static & Autoignition - Stage 1
Start date:
Dec 2023
End date:
Mar 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Biomethane and Hydrogen Interactions
Start date:
Dec 2023
End date:
Aug 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Storage Legal Assessment
Start date:
Nov 2023
End date:
Jan 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Blending in LPG Feasibility Study
Start date:
Jan 2024
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
APEX (Alternative Power for Equitable Communities)
Start date:
Mar 2024
End date:
Aug 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2
Demand Diversification Service for LMAs
Start date:
Feb 2024
End date:
Sep 2024
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2
Pathfinder Development
Start date:
Feb 2024
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HVT Appliance Development – Phase 1
Start date:
Oct 2023
End date:
Dec 2023
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Generative AI Discovery
Start date:
Feb 2024
End date:
Mar 2024
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2

Carbon Transportation Technical Demonstration - Phase 1
Start date:
Feb 2024
End date:
Aug 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Network policies and procedures - Development roadmap
Start date:
Feb 2024
End date:
Aug 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Customer Demand Profiling for Hydrogen Networks
Start date:
Jan 2024
End date:
Apr 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Accessibility module for CO alarms (Phase 1)
Start date:
Mar 2024
End date:
Jul 2024
Strategy themes:
- Supporting consumers in vulnerable situations
Funding mechanism:
- NIA RIIO-2
Connected Island
Start date:
Apr 2024
End date:
Dec 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
IGEM Downstream Hydrogen Standards Development
Start date:
Mar 2024
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen & Carbon Dryness Management
Start date:
Apr 2024
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Green Hydrogen Production Impacts on Water Usage
Start date:
Mar 2024
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HVDC Assets Life Cycle Assessment (HVDC - LCA)
Start date:
Apr 2024
End date:
Jul 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Thermoplastic liners for Transmission Feasibility
Start date:
Feb 2024
End date:
May 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
AI Centre of Excellence – GB Energy Industry Data Science Fellowship
Start date:
Feb 2024
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Market Signals for the Electrification of Heating
Start date:
Mar 2024
End date:
Jan 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Assessment for Suitability of Ventilation for Boiler Compartments
Start date:
Mar 2024
End date:
Aug 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Consequence Assessment of Internal Domestic Pipework Depressurisation
Start date:
Apr 2024
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
HyDrive
Start date:
Apr 2024
End date:
Jan 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Energy Users: Regional Customer Archetypes (EUReCA)
Start date:
May 2024
End date:
Aug 2024
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2
Pre-heating Requirement for Hydrogen Transportation
Start date:
May 2024
End date:
Nov 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Equal LCTs
Start date:
Feb 2024
End date:
Nov 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hydrogen Technical and Safety Case for Domestic Heat – Phase 3
Start date:
Apr 2024
End date:
Sep 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Regional Whole Systems Strategic Planning (RWSSP) Methodology: Problem Statement Development
Start date:
Mar 2024
End date:
Jul 2024
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

1mol% oxygen on the National Transmission System
Start date:
Jun 2024
End date:
Aug 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Below 7 barg PRI Suitability Assessment
Start date:
Jun 2024
End date:
Jan 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Gas Separation within UK Gas Networks
Start date:
May 2024
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
New Aspects of Trading to Understand Risks to the Environment (NATURE)
Start date:
Jun 2024
End date:
Dec 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Transitioning and Repurposing Oil Pipelines for Hydrogen (TROPHy)
Start date:
May 2024
End date:
Dec 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Electrolyser Horizons: Unveiling the Techno-economic Landscape for Sustainable Hydrogen Production in GB.
Start date:
May 2024
End date:
Feb 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
High Temperature Low Sag Conductors (HTLS) Non-Destructive Inspection Device
Start date:
Jun 2024
End date:
Feb 2025
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Hydrogen Ignition Risk from Static & Autoignition - Stage 2a
Start date:
Jun 2024
End date:
Sep 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Hazardous Areas Impact Mitigations (HAIM) Phase 2
Start date:
Jul 2024
End date:
Dec 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
NDT Fatigue crack growth rate of hydrogen pipelines
Start date:
Jun 2024
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Air (Oxygen) Ingress in Isolated Installations
Start date:
Jun 2024
End date:
Dec 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Application of LV Monitoring in Network Planning
Start date:
Sep 2024
End date:
Dec 2024
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Strategic Education Roadmap
Start date:
Jul 2024
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
MASiP H2– Technical Development
Start date:
Jun 2024
End date:
Dec 2024
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Detecting LCTs from Smart Meter Consumption Data
Start date:
Sep 2024
End date:
Oct 2024
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2
Space Weather Impact for Future Electricity System Resilience (SWIFTER)
Start date:
May 2024
End date:
Jan 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

Battery Storage Modelling for Enhanced Connection Assessments (BaTSeC)
Start date:
May 2024
End date:
Jan 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

H100 Quantitative Risk Assessment for Emergency Purging
Start date:
Jun 2024
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
H100 Interference Damage Management Project
Start date:
Sep 2024
End date:
Jan 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Sensitive I&C Users for Strategic Hydrogen Network Planning
Start date:
Sep 2024
End date:
Feb 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Future Energy Innovation Scenarios
Start date:
Aug 2024
End date:
Sep 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
FastPress
Start date:
Mar 2024
End date:
Aug 2024
Status:
Live
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2

Hydrogen Behavioural Change
Start date:
Sep 2024
End date:
Dec 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

CHIP Composite Pipelines
Start date:
Sep 2024
End date:
Feb 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

NTS Materials Pipeline Assessment
Start date:
Sep 2024
End date:
Jan 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Compatibility assessment of dispatch options with GB cross-border markets
Start date:
Aug 2024
End date:
Nov 2024
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2

Heat Networks - Optimising Stranded Assets
Start date:
Sep 2024
End date:
Feb 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Incorporating the impact of climate change in power system modelling
Start date:
Apr 2024
End date:
Apr 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Heat Network Transition Study
Start date:
Oct 2024
End date:
Feb 2025
Status:
Live
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- NIA RIIO-2
Dispatch Transparency Methodology
Start date:
Oct 2024
End date:
Jul 2024
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

H100 Design of Purging Trailer for Emergency Operations
Start date:
Oct 2024
End date:
Jan 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Accelerating Progress
Start date:
Nov 2024
End date:
Feb 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2
Quantitative assessment of self and central scheduling
Start date:
Jul 2024
End date:
Oct 2024
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Dispatch Decision Intelligence
Start date:
Aug 2024
End date:
Feb 2025
Status:
Live
Strategy themes:
- Data and digitalisation
Funding mechanism:
- NIA RIIO-2

Centralised Strategic Network Plan Decision Making Tool (CSNP)
Start date:
Nov 2024
End date:
Jan 2025
Status:
Live
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2

Options for optimising GB Data Centres
Start date:
Dec 2024
End date:
Jan 2025
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-2

Combined On-line Transformer Monitoring
Start date:
Sep 2014
End date:
Sep 2022
Funding mechanism:
- Network Innovation Allowance
Sentinel
Start date:
Sep 2015
End date:
Dec 2023
Status:
Live
Funding mechanism:
- Network Innovation Allowance
Cable Health Assessment - Low Voltage
Start date:
Nov 2015
End date:
Aug 2021
Funding mechanism:
- Network Innovation Allowance
Optimising Oil Regeneration for Transformers
Start date:
Feb 2016
End date:
Sep 2022
Funding mechanism:
- Network Innovation Allowance
Tap Changer Monitoring
Start date:
Feb 2016
End date:
May 2022
Funding mechanism:
- Network Innovation Allowance
Project Avatar
Start date:
Oct 2016
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
Stakeholder attitudes to electricity infrastructure
Start date:
Oct 2013
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
SF6 Management and Alternative Gases
Start date:
Mar 2015
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Investigation of transient and safety issues in gas insulated systems
Start date:
Oct 2016
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Alternatives to SF6 for retro-filling existing equipment
Start date:
Nov 2016
End date:
Nov 2020
Funding mechanism:
- Network Innovation Allowance
Frequency Response Analysis for Transformer Characterisation and Objective Interpretation of Results
Start date:
Jan 2017
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Electric & Magnetic Fields Health & Safety (P60) 2017 -2021
Start date:
Jan 2017
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Condition and Climatic Environment for Power Transformers (ConCEPT)
Start date:
Sep 2017
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Transformer and Transformer Oil Life Optimisation and Management Through Analysis and Modelling
Start date:
Mar 2017
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Automated assessment of steelwork condition using innovative imaging techniques
Start date:
Sep 2017
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
EZ valve: Live Insertion of Pipeline Isolation Valves on Risers
Start date:
Sep 2016
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Connecting homes for health
Start date:
Dec 2016
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance
Squeeze free flow stopping on PE mains
Start date:
Sep 2017
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Vonaq Utility Pole Strength Measurement
Start date:
Apr 2015
End date:
Oct 2016
Status:
Live
Funding mechanism:
- Network Innovation Allowance
Integrated substation Condition Monitoring (ISCM)
Start date:
Apr 2015
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
FORESIGHT – LV pre-fault recognition and management
Start date:
Oct 2015
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Vehicle to Grid (V2G) - the network impact of grid-integrated vehicles.
Start date:
May 2017
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance
Silent Night – Hybrid EV Generator
Start date:
May 2017
End date:
Jul 2020
Funding mechanism:
- Network Innovation Allowance
Integrel – Baseline Implementation
Start date:
Jul 2017
End date:
Jul 2022
Funding mechanism:
- Network Innovation Allowance
Microresilience
Start date:
Sep 2017
End date:
Sep 2020
Status:
Live
Funding mechanism:
- Network Innovation Allowance
Customer-Led Distribution System
Start date:
Sep 2017
End date:
Jun 2021
Funding mechanism:
- Network Innovation Allowance
Olympic Rings for RIIO
Start date:
Sep 2014
End date:
Nov 2020
Funding mechanism:
- Network Innovation Allowance
Mains and Service Replacement through Keyhole
Start date:
Jul 2014
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Cured In-Place Pipe (CIPP) (Stage 3)
Start date:
Oct 2015
End date:
Apr 2022
Funding mechanism:
- Network Innovation Allowance
Small Diameter PE Flowstop
Start date:
May 2016
End date:
Nov 2020
Funding mechanism:
- Network Innovation Allowance
100% Hydrogen
Start date:
Jan 2017
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
IGEM Gas Quality Standard Working Group
Start date:
Jan 2017
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Forged Carbon Fiber Products (FCFP) - Stage 1
Start date:
Mar 2017
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance
Partial Discharge Monitoring to Reduce Safety Criticality
Start date:
Jan 2015
End date:
Oct 2020
Funding mechanism:
- Network Innovation Allowance
Transmission System Fault Level Monitoring
Start date:
Jun 2017
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Linkbox Monitoring using Narrow Band IoT
Start date:
Dec 2017
End date:
Dec 2019
Funding mechanism:
- Network Innovation Allowance
Mini-Mole
Start date:
Apr 2015
End date:
Sep 2018
Funding mechanism:
- Network Innovation Allowance
EVOLUTION
Start date:
Dec 2015
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
SINE Post
Start date:
Jan 2017
End date:
Jan 2021
Funding mechanism:
- Network Innovation Allowance
Active Fault Level Management (AFLM)
Start date:
Feb 2017
End date:
Mar 2024
Funding mechanism:
- Network Innovation Allowance
Secondary Communications Phase 2 - Consultancy Engagement
Start date:
Jan 2017
End date:
Jan 2018
Funding mechanism:
- Network Innovation Allowance
Instrument for the identification of Live and Not Live HV and LV cables
Start date:
May 2017
End date:
Nov 2020
Funding mechanism:
- Network Innovation Allowance
Weather Normalised Demand Analytics (WANDA)
Start date:
Aug 2017
End date:
Dec 2018
Funding mechanism:
- Network Innovation Allowance
Connected Worker Phase 1 - Field Data Automated Capture
Start date:
Oct 2017
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
Endbox G38 Level Detection Phase 2
Start date:
Oct 2017
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
Low Cost Fault Current Measurement of Wooden Poles
Start date:
Nov 2017
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance
Managing uncertainty in future load-related investment
Start date:
Feb 2016
End date:
Dec 2019
Funding mechanism:
- Network Innovation Allowance
Trial of Open Innovation Model in the Utilities Sector
Start date:
Oct 2015
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
The Planning Data Exchange System between Network Licensees to Enable a Smarter Grid
Start date:
Jan 2017
End date:
Jan 2022
Status:
Live
Funding mechanism:
- Network Innovation Allowance
11kV power electronics providing reactive compensation for voltage control
Start date:
Jun 2016
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance
Low Voltage Network Modelling and Analysis Environment
Start date:
Jun 2011
End date:
Oct 2012
Funding mechanism:
- LCNF Tier 1
Low Voltage Network Solutions
Start date:
Apr 2011
End date:
Mar 2014
Funding mechanism:
- LCNF Tier 1
Low Voltage Current Sensor Technology Evaluation
Start date:
Dec 2011
End date:
Jun 2013
Funding mechanism:
- LCNF Tier 1
Trial of Orkney Energy Storage Park (Phase 2)
Start date:
Oct 2011
End date:
Aug 2012
Funding mechanism:
- LCNF Tier 1
Seasonal Generation Deployment
Start date:
Jan 2011
End date:
Apr 2013
Funding mechanism:
- LCNF Tier 1
Early Learning of Low Voltage Network Impacts from Estate PV Cluster
Start date:
Jul 2011
End date:
Feb 2013
Funding mechanism:
- LCNF Tier 1
Demonstrating the Functionality of Automated Demand Response
Start date:
Jun 2011
End date:
Aug 2012
Funding mechanism:
- LCNF Tier 1
Voltage Management on Low Voltage Busbars
Start date:
Apr 2011
End date:
Oct 2013
Funding mechanism:
- LCNF Tier 1
Clyde Gateway
Start date:
Jan 2012
End date:
Mar 2014
Funding mechanism:
- LCNF Tier 1
Voltage Control System Demonstration Project
Start date:
Mar 2014
End date:
Mar 2015
Funding mechanism:
- LCNF Tier 1
Hook Norton Low Carbon Community Smart Grid
Start date:
Feb 2012
End date:
Oct 2013
Funding mechanism:
- LCNF Tier 1
Photovoltaic Impact on Surburban Networks
Start date:
Nov 2012
End date:
Nov 2013
Funding mechanism:
- LCNF Tier 1
Ashton Hayes Smart Village
Start date:
Jan 2012
End date:
Oct 2013
Funding mechanism:
- LCNF Tier 1
Network Management on the Isles of Scilly
Start date:
Aug 2012
End date:
Aug 2013
Funding mechanism:
- LCNF Tier 1
The Bidoyng Smart Fuse
Start date:
Jan 2012
End date:
Dec 2014
Funding mechanism:
- LCNF Tier 1
Interconnection of WPD and NGC SCADA Systems
Start date:
Dec 2011
End date:
Dec 2012
Funding mechanism:
- LCNF Tier 1
Trial Evaluation of Domestic Demand Side Management (DDSM)
Start date:
Oct 2010
End date:
Aug 2012
Funding mechanism:
- LCNF Tier 1
Demonstrating the Benefits of Monitoring Low Voltage Network with Embedded PV Panels and EV Charging Point
Start date:
Sep 2010
End date:
Oct 2011
Funding mechanism:
- LCNF Tier 1
1MW Shetland NaS Battery
Start date:
Sep 2010
End date:
Mar 2014
Funding mechanism:
- LCNF Tier 1
Implementation of Real-Time Thermal Ratings
Start date:
Jan 2012
End date:
Jun 2013
Funding mechanism:
- LCNF Tier 1
SoLa Bristol
Start date:
Dec 2011
End date:
Jan 2015
Funding mechanism:
- LCNF Tier 2
Flexible Approaches for Low Carbon Optimised Networks (FALCON)
Start date:
Nov 2011
End date:
Sep 2015
Funding mechanism:
- LCNF Tier 2
Thames Valley Vision
Start date:
Jan 2012
End date:
Mar 2017
Funding mechanism:
- LCNF Tier 2
Capacity to Customers
Start date:
Jan 2012
End date:
Dec 2014
Funding mechanism:
- LCNF Tier 2
Flexible Networks for a Low Carbon Future
Start date:
Jan 2012
End date:
Dec 2014
Funding mechanism:
- LCNF Tier 2
Low Voltage Network Templates
Start date:
Apr 2011
End date:
Jul 2013
Funding mechanism:
- LCNF Tier 2
Northern Isles New Energy Solutions (NINES)
Start date:
Nov 2011
End date:
Dec 2013
Funding mechanism:
- LCNF Tier 2
Lincolnshire Low Carbon Hub
Start date:
Jan 2012
End date:
Feb 2015
Funding mechanism:
- LCNF Tier 2
Accelerating Renewable Connections (ARC)
Start date:
Jan 2013
End date:
Dec 2016
Funding mechanism:
- LCNF Tier 2
Customer Load Active System Services (CLASS)
Start date:
Jan 2013
End date:
Sep 2015
Funding mechanism:
- LCNF Tier 2
FLEXDGRID - Advanced Fault Level Management in Birmingham
Start date:
Dec 2012
End date:
Mar 2017
Funding mechanism:
- LCNF Tier 2
My Electric Avenue (I²EV)
Start date:
Jan 2013
End date:
Dec 2015
Funding mechanism:
- LCNF Tier 2
Orkney Energy Storage Park (Phase 1)
Start date:
Jun 2012
End date:
Mar 2015
Funding mechanism:
- LCNF Tier 1
Low Voltage (LV) Network Connected Energy Storage
Start date:
Jan 2012
End date:
Mar 2014
Funding mechanism:
- LCNF Tier 1
Active Network Management with Hydro Generation
Start date:
Mar 2012
End date:
Dec 2014
Funding mechanism:
- LCNF Tier 1
Temperature Monitoring Windfarm Cable Circuits
Start date:
Oct 2012
End date:
Mar 2015
Funding mechanism:
- LCNF Tier 1
Community Energy Action
Start date:
Oct 2012
End date:
May 2014
Funding mechanism:
- LCNF Tier 1
Implementation of an Active Fault Level Management Scheme
Start date:
Feb 2012
End date:
Dec 2014
Funding mechanism:
- LCNF Tier 1
Smart Urban Low Voltage Network
Start date:
Jul 2012
End date:
Mar 2015
Funding mechanism:
- LCNF Tier 1
Accelerated Network Modelling
Start date:
Apr 2010
End date:
Mar 2011
Funding mechanism:
- IFI
Chromatic Oil Analysis (Phase 2)
Start date:
Jul 2009
End date:
Feb 2010
Funding mechanism:
- IFI
Customer Research
Start date:
Nov 2011
End date:
Mar 2013
Funding mechanism:
- IFI
Demand Control
Start date:
Oct 2011
End date:
Jan 2012
Funding mechanism:
- IFI
Distribution Transformer Real Time Thermal Ratings
Start date:
Apr 2011
End date:
Mar 2015
Funding mechanism:
- IFI
Dynamic Line Rating
Start date:
Dec 2009
End date:
Jun 2011
Funding mechanism:
- IFI
Earthing
Start date:
Apr 2005
End date:
Mar 2011
Funding mechanism:
- IFI
EA Technology Forums
Start date:
Apr 2009
End date:
Mar 2015
Funding mechanism:
- IFI
Electricity Supply Research (ESR) Network
Start date:
Sep 2010
End date:
Aug 2012
Funding mechanism:
- IFI
ENA Recharges
Start date:
Jun 2011
End date:
Jul 2011
Funding mechanism:
- IFI
CBRM Extension (Wood Pole Over Head Lines and Distribution Substations - Stages 2 &3)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
CBRM Load Related Risk
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Demand-Side Management and Risk
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Collaborative ENA Research & Development Programme
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Engineers Forums: Cable, Overhead Line (OHL), Plant and Protection
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Environmental Monitoring of Distribution Substations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Failure on Demand
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Ground Mounted Fault Passage Indicator
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
High Voltage to Low Voltage Transfer Potentials
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Live Alert
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
132kV Insulated Composite Crossarm Trial
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Advanced Radio Control
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Aluminium Carbon Core Conductor (ACCC)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Assessment of Conducrete
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
BMW Electric Car
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
ENA Research & Development Programme
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Collapse Prediction Relay
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Corvid Behaviour Study
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
DECC Smart Capital Grant Comms Hub
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Surenet LV Sure
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
3 Live Alert – Energised Alert
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
3rd Party Rise Of Earth Potential (ROEP) Risk Assessment
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
4 PURL2
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Alternative Insulating Oils (Phase 1)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
BT 21st Century Protection Solutions (BT21CN)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Cable Identification Devices
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Energy Storage Project
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Electric Power Research Insitute (EPRI)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
ESRI Powerfactory
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Active Distribution Networks with Full Integration of Demand and Distributed Energy Resources (ADDRESS)
Start date:
Apr 2008
End date:
Mar 2009
Funding mechanism:
- IFI
Autonomous Regional Active Network Management System (AURA NMS)
Start date:
Apr 2006
End date:
Mar 2010
Funding mechanism:
- IFI
Automated Asset Registration
Start date:
Apr 2011
End date:
Mar 2012
Funding mechanism:
- IFI
Automated Long Term Development Statement (LTDS) Diagrams
Start date:
Apr 2011
End date:
Mar 2012
Funding mechanism:
- IFI
Bankside Heat Transfer
Start date:
Apr 2006
End date:
Mar 2010
Funding mechanism:
- IFI
Collaborative ENA Research & Development Programme
Start date:
Apr 2006
End date:
Mar 2010
Funding mechanism:
- IFI
Distribution Network Visibility
Start date:
Apr 2010
End date:
Mar 2013
Funding mechanism:
- IFI
Earthing Information System
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI
Growth in City Centres
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Helicopter Mounted Partial Discharge Locator
Start date:
Apr 2010
End date:
Mar 2013
Funding mechanism:
- IFI
Active Fault Current Management
Start date:
Apr 2008
End date:
Mar 2015
Funding mechanism:
- IFI
Climate Change and Seasonal Variation Impacts on Electrical Earthing Installations
Start date:
Jan 2005
End date:
Mar 2014
Funding mechanism:
- IFI
Dynamic Ratings
Start date:
Apr 2008
End date:
Mar 2012
Funding mechanism:
- IFI
Partial Discharge Project and Forum
Start date:
Apr 2008
End date:
Mar 2015
Funding mechanism:
- IFI
Protective Coatings Forum
Start date:
Apr 2008
End date:
Mar 2015
Funding mechanism:
- IFI
Integrated Condition Based Risk Management
Start date:
Apr 2010
End date:
Mar 2013
Funding mechanism:
- IFI
Strategic Technology Programme Module 3 Cable Networks
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 5 Distributed Energy Resources
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 2 Overhead Line
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 4 Substations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Effect of Electric Vehicles on Distribution Networks
Start date:
Apr 2008
End date:
Mar 2012
Funding mechanism:
- IFI
Collaborative ENA Research & Development Programme
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Environmental Monitoring of Fluid Filled Cables
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Harmonic Cable Modelling
Start date:
Oct 2009
End date:
Jan 2010
Funding mechanism:
- IFI
Live Alert
Start date:
Dec 2009
End date:
Dec 2010
Funding mechanism:
- IFI
Load Allocation
Start date:
Apr 2011
End date:
Jul 2012
Funding mechanism:
- IFI
Load Flow
Start date:
May 2010
End date:
Nov 2011
Funding mechanism:
- IFI
Load Related Risk Methodology
Start date:
Aug 2011
End date:
Sep 2011
Funding mechanism:
- IFI
Network Risk (Phase 2)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Low Voltage (LV) Network Automation
Start date:
Apr 2011
End date:
Mar 2013
Funding mechanism:
- IFI
Modular Rezap Fault Master
Start date:
Jul 2006
End date:
Sep 2008
Funding mechanism:
- IFI
Protective Coatings Forum
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Partial Discharge User Group
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 5 Distributed Energy Resources
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Stay Rod Testing
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Detecting Distributed Generation Stage 1
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Distributed Generation and ARM Strathclyde
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Distribution Dynamic Line Rating
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Ecoplugs
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Evaluation of FORD Focus / Tourneo Electric Vehicle on Network
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Lynx Kelvatek LV Switch
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
LV Fault Location Devices
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
LV Jumpers with Integral CB
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
IEC 61850 Application in SP Transmission
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Nanodielectrics
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
High Performance Computing Technologies for Smart Distributed Network Operation (HiPerDNO)
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Increased Capacity from Existing Overhead Line Routes
Start date:
Apr 2013
End date:
Mar 2014
Funding mechanism:
- IFI
Low Carbon Scenario Modelling
Start date:
Apr 2011
End date:
Mar 2012
Funding mechanism:
- IFI
LV Remote Control and Automation
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
National Underground Assets Group (NUAG)
Start date:
Apr 2011
End date:
Mar 2012
Funding mechanism:
- IFI
NaFIRS Analysis
Start date:
Feb 2012
End date:
Jun 2012
Funding mechanism:
- IFI
Oil Regeneration
Start date:
Nov 2011
End date:
Nov 2016
Funding mechanism:
- IFI
OLTC Monitoring
Start date:
Jul 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Overhead Line Fault Location
Start date:
Feb 2012
End date:
Feb 2013
Funding mechanism:
- IFI
Pole Mounted Fault / Load Monitor
Start date:
Apr 2006
End date:
Mar 2015
Funding mechanism:
- IFI
Polymeric Investigation
Start date:
Apr 2009
End date:
Mar 2011
Funding mechanism:
- IFI
Stay Anchor Testing Using Magnetostrictive Sensor Measurements
Start date:
Dec 2010
End date:
Mar 2011
Funding mechanism:
- IFI
Storage
Start date:
Jan 2011
End date:
Jan 2014
Funding mechanism:
- IFI
Strategic Technology Programme Module 3 Cable Networks
Start date:
Apr 2009
End date:
Mar 2015
Funding mechanism:
- IFI
Strategic Technology Programme Module 5 Distributed Energy Resources
Start date:
Apr 2009
End date:
Mar 2015
Funding mechanism:
- IFI
Strategic Technology Programme Module 2 Overhead Line
Start date:
Apr 2009
End date:
Mar 2015
Funding mechanism:
- IFI
Strategic Technology Programme Module 4 Substations
Start date:
Apr 2009
End date:
Mar 2015
Funding mechanism:
- IFI
Superconducting Fault Current Limiter (SFCL)
Start date:
Feb 2006
End date:
Jan 2009
Funding mechanism:
- IFI
Thermodynamic Models Options for Upgrading Cooling for Distribution Transformer
Start date:
Apr 2011
End date:
Jul 2012
Funding mechanism:
- IFI
Transducer Accuracy
Start date:
Apr 2011
End date:
Dec 2012
Funding mechanism:
- IFI
Strategic Technology Programme Module 2 Overhead Line
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 3 Cable Networks
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 4 Substations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Superconducting Fault Current Limiter
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Supergen FlexNet
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Tree Growth Regulator
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Flow Battery Trial
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
GIS Tree Clearance
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Heat Pump Load Profile
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Helicopter Mounted Partial Discharge Detection
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Power Networks Research Academy
Start date:
Jan 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Insulated Composite Crossarm
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Line Mounted Sensor Assessment
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Live Line Tree Felling
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Low Voltage (LV) Connected Batteries
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Microplanet Low Voltage Regulator
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Mobile Condition Monitoring System for Open Busbar Transmission Substations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Mobile Sync GVR
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Nano Composite HVDC Insulation
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Orkney Active Network Management
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Orkney Active Power Network
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Orkney Active Power Network Voltage Control
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Overhead Line Sensor- FMC Tech
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Partial Discharge User Group
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Plugged in Places
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Power Networks Demo Centre (PNDC)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Power Line Carrier Trial Installation and Assessment
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Protective Coatings Forum
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Radio Tele Switching (RTS) Assessment
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
ROCOF Protection Alternative
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Smart Analytics
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 2 Overhead Line
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 3 Cable Networks
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 5 Distributed Energy Resources
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 4 Substations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Supergen Flexnet
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Supergen HiDEF
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Supply Point Monitoring
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Surenet LV Sure
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Tell US GIS
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Tree Growth Regulator
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Trip Timing Module
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Ultra TEV Alarm
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
VOAS Optical Current Transformer
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Wide Area Monitoring Protection & Control (WAMPAC)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Offline Planning Tool for Dynamic Thermal Rating
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Partial Discharge Monitoring in Supergrid Transformers
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
PD Monitoring of Cables (11 & 33kV)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Power Network Demonstration Centre (PNDC)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Psymetrix ACAM Phase 1
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Scottish Power Advanced Research Centre (SPARC)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Sensor Networks (Smart Dust) Phase 2
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 2 Overhead Line
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 3 Cable Networks
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 4 Substations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 5 Distributed Energy Resources
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Asset Lifecycle Value Optimisation (SALVO)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Substation Earth Integrity Monitoring System
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Superconducting Fault Current Limiter (SFCL)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Supergen FlexNet
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Supergen HiDEF
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Transmission SSR & Harmonics
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Vegetation Management ADAS
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Voltage Control ACTIV
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Online Condition Monitoring
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI
Overhead Line Incipient Fault Location
Start date:
Apr 2013
End date:
Mar 2014
Funding mechanism:
- IFI
Power Networks Research Academy
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI
Radio Frequency (RF) Mesh for Smart Grid Communications
Start date:
Apr 2011
End date:
Mar 2012
Funding mechanism:
- IFI
Strategic Technology Programme Module 2 Overhead Line
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 4 Substations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 5 Distributed Energy Resources
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Supergen FlexNet
Start date:
Jan 2007
End date:
Jan 2011
Funding mechanism:
- IFI
Supergen 3 HiDEF Highly Distributed Energy Futures
Start date:
Apr 2010
End date:
Mar 2013
Funding mechanism:
- IFI
Sustainable Asset Risk and Prioritisation Modelling
Start date:
Apr 2011
End date:
Mar 2013
Funding mechanism:
- IFI
Transformer Design for FR3
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Tree Growth Regulator
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Urban Transformer Substation
Start date:
Apr 2011
End date:
Mar 2013
Funding mechanism:
- IFI
Vegetation Management ADAS
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI
Helicopter Mounted Partial Discharge Detection
Start date:
Apr 2008
End date:
Mar 2012
Funding mechanism:
- IFI
Tree Growth Regulator
Start date:
Apr 2008
End date:
Mar 2014
Funding mechanism:
- IFI
SuperGen HiDef
Start date:
Apr 2010
End date:
Mar 2013
Funding mechanism:
- IFI
Understanding Networks with High Penetrations of Distributed Generation and other Low Carbon Technologies
Start date:
Apr 2008
End date:
Mar 2012
Funding mechanism:
- IFI
Substation Communication Development
Start date:
Apr 2008
End date:
Mar 2012
Funding mechanism:
- IFI
Vegetation Management ADAS
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Transient Fault Detection from Disturbance Recorders
Start date:
Apr 2008
End date:
Mar 2014
Funding mechanism:
- IFI
Technical Assessment of Power Quality Issues
Start date:
Apr 2010
End date:
Mar 2015
Funding mechanism:
- IFI
Harmonic Detection and Analysis
Start date:
Apr 2010
End date:
Mar 2014
Funding mechanism:
- IFI
Network Unbalance Source Detection by Optimum Monitoring
Start date:
Apr 2010
End date:
Mar 2014
Funding mechanism:
- IFI
Power Communications Meter
Start date:
Apr 2008
End date:
Mar 2014
Funding mechanism:
- IFI
Sensor Networks (Smart Dust)
Start date:
Apr 2008
End date:
Mar 2015
Funding mechanism:
- IFI
Power Networks Research Academy
Start date:
Apr 2008
End date:
Mar 2015
Funding mechanism:
- IFI
Urban Heat Island Study (KTP)
Start date:
Apr 2008
End date:
Mar 2012
Funding mechanism:
- IFI
OLTC Tap Changer Monitor
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Voltage Optimisation 11kV Network
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Investigating Balancing of LV Networks
Start date:
Apr 2010
End date:
Mar 2010
Funding mechanism:
- IFI
Phasor Measurement Trial
Start date:
Apr 2010
End date:
Mar 2015
Funding mechanism:
- IFI
Smart Grid Equipment – LV Link Box Monitoring
Start date:
Apr 2010
End date:
Mar 2010
Funding mechanism:
- IFI
Smart Grid Design
Start date:
Apr 2010
End date:
Mar 2015
Funding mechanism:
- IFI
Switchgear De-rating
Start date:
Apr 2010
End date:
Mar 2012
Funding mechanism:
- IFI
Supergen FlexNet
Start date:
Apr 2008
End date:
Mar 2012
Funding mechanism:
- IFI
Second Life Car Batteries
Start date:
Apr 2011
End date:
Mar 2012
Funding mechanism:
- IFI
Generating Value from Smart Meter Data
Start date:
Apr 2011
End date:
Mar 2013
Funding mechanism:
- IFI
Wide Area Monitoring Protection & Control (WAMPAC)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Strategic Technology Programme Module 3 Cable Networks
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Microshock PPE Development
Start date:
Jun 2009
End date:
Sep 2011
Funding mechanism:
- IFI
Development of Probabilistic Risk Assessment Procedure for Earthing Systems
Start date:
Oct 2010
End date:
Sep 2012
Funding mechanism:
- IFI
High Level Indoor Isolator Access
Start date:
Dec 2010
End date:
Mar 2014
Funding mechanism:
- IFI
Fixed Maintenance Earth (FME) - Development of Handling Techniques and Tools
Start date:
Dec 2010
End date:
Dec 2011
Funding mechanism:
- IFI
JW420 - Developing Improved Maintenance Tools and Techniques
Start date:
Jun 2011
End date:
Mar 2014
Funding mechanism:
- IFI
33Kv Voltage Transformer (VT) Shutter Locking Device
Start date:
Sep 2010
End date:
May 2012
Funding mechanism:
- IFI
OB 14 Blast Valve Lifting Rig
Start date:
May 2010
End date:
Mar 2011
Funding mechanism:
- IFI
GA ABCB Slow Closing Device
Start date:
Nov 2010
End date:
Sep 2011
Funding mechanism:
- IFI
Fault Current Distribution in New Type of EHV cables
Start date:
Dec 2008
End date:
May 2012
Funding mechanism:
- IFI
Exported Potentials and Profiles Around Earth Electrodes and Opposite-Side Injection for Large-Area Earthing Systems
Start date:
Jan 2011
End date:
Mar 2015
Funding mechanism:
- IFI
Rapid Deployment Ballistic Screen
Start date:
Jul 2011
End date:
Sep 2013
Funding mechanism:
- IFI
NSI5 Earthing Improvements
Start date:
Sep 2008
End date:
Mar 2012
Funding mechanism:
- IFI
Air Receiver Inspection Cover Hinge
Start date:
Mar 2012
End date:
Sep 2021
Funding mechanism:
- IFI
Bascules and Safety Gate Accessories
Start date:
Mar 2012
End date:
Mar 2013
Funding mechanism:
- IFI
Portable Earthing Trailer
Start date:
Sep 2007
End date:
Sep 2013
Funding mechanism:
- IFI
Mobile Transformer Assessment Clinic
Start date:
Mar 2011
End date:
Sep 2012
Funding mechanism:
- IFI
OHL Data Collection (Original Title - Data Visualisation)
Start date:
Oct 2011
End date:
Mar 2012
Funding mechanism:
- IFI
Magnetic Models for Transformers Transformer Core Modelling
Start date:
Oct 2007
End date:
Dec 2014
Funding mechanism:
- IFI
Development of Multi Response Stockbridge Damper at 400kV
Start date:
Feb 2010
End date:
May 2011
Funding mechanism:
- IFI
Further Development of PFT in Service Cable Oil Leak Location Technique
Start date:
Mar 2009
End date:
Mar 2011
Funding mechanism:
- IFI
SALVO
Start date:
Dec 2011
End date:
Mar 2012
Funding mechanism:
- IFI
Impact of Extending Operational Lifetimes of Electromechanical Relays
Start date:
Nov 2011
End date:
Mar 2013
Funding mechanism:
- IFI
Improved Transformer Thermal Monitoring
Start date:
Oct 2010
End date:
Nov 2013
Funding mechanism:
- IFI
Development of OHL Hot Joint Monitoring Tool
Start date:
Nov 2010
End date:
Dec 2023
Funding mechanism:
- IFI
Use of Fibre Optics in Substations to Detect Noise
Start date:
Oct 2007
End date:
Apr 2014
Funding mechanism:
- IFI
Transformer and System Reliability
Start date:
Oct 2010
End date:
Dec 2014
Funding mechanism:
- IFI
Oil-less DGA Sampling (Prospective Trial)
Start date:
Feb 2011
End date:
Nov 2023
Funding mechanism:
- IFI
Tapchanger Spring Measuring Device
Start date:
May 2010
End date:
Nov 2023
Funding mechanism:
- IFI
Transformer Oil Passivation and Impact of Corrosive Sulphur (TOPICS)
Start date:
Feb 2008
End date:
Aug 2008
Funding mechanism:
- IFI
Wireless Condition Monitoring Sensors with Integrated Diagnostics
Start date:
Jul 2011
End date:
Mar 2014
Funding mechanism:
- IFI
Voltage Optimiser Pilot
Start date:
Jan 2004
End date:
Mar 2014
Funding mechanism:
- IFI
A Probabilistic Wind & Ice Map for the UK
Start date:
Aug 2011
End date:
Dec 2023
Funding mechanism:
- IFI

In-situ Remediation of OHL Tower Steelwork
Start date:
Jan 2012
End date:
Mar 2013
Funding mechanism:
- IFI
GIC DGA Monitoring and Alerting
Start date:
Feb 2008
End date:
Feb 2015
Funding mechanism:
- IFI
Non Conventional Current Sensors
Start date:
Oct 2009
End date:
Sep 2013
Funding mechanism:
- IFI

Detection and Measurement of ACSR Corrosion
Start date:
Oct 2013
End date:
Oct 2019
Funding mechanism:
- IFI

Measuring Alcohols to Determine Early Stages of Cellulosic Insulation Degradation
Start date:
Oct 2013
End date:
Oct 2019
Funding mechanism:
- IFI
Partial Discharge Monitoring of DC Cable (DCPD)
Start date:
Nov 2011
End date:
Dec 2013
Funding mechanism:
- IFI
Transformer Lifetime Modelling
Start date:
Sep 2011
End date:
Sep 2015
Funding mechanism:
- IFI
Effective Protective Coatings for OHL Towers
Start date:
Apr 2007
End date:
Apr 1951
Funding mechanism:
- IFI
Phase III Centrifuge Modelling and Field Monitoring of Wind Induced Loads on Transmission Towers
Start date:
Oct 2007
End date:
Oct 2011
Funding mechanism:
- IFI
OHL Conductor Asset Lives
Start date:
Jan 2008
End date:
Sep 2023
Funding mechanism:
- IFI
HVDC EngD - Richard Poole
Start date:
Jan 2012
End date:
Jan 2015
Funding mechanism:
- IFI
Voltage Transformer Comparison
Start date:
Feb 2007
End date:
Mar 2014
Funding mechanism:
- IFI
Architecture for Substation Secondary System (AS3) Project
Start date:
Apr 2010
End date:
Mar 2011
Funding mechanism:
- IFI

Protection Performance Study for IEC61850 Process Bus Architecture of Substation Secondary Systems (AS3)
Start date:
Aug 2004
End date:
Dec 2010
Funding mechanism:
- IFI
Alternative Bus Bar Protection Solution
Start date:
Mar 2011
End date:
Mar 2015
Funding mechanism:
- IFI
Design of a Smart Tool for Detecting Hidden Errors in Protection Setting Files
Start date:
Jan 2011
End date:
Mar 2016
Funding mechanism:
- IFI
Sustainability First - Smart Demand Forum
Start date:
Nov 2008
End date:
Mar 2014
Funding mechanism:
- IFI

Acoustic Emissions from HV Overhead Conductors
Start date:
Oct 2011
End date:
Mar 2015
Funding mechanism:
- IFI
Optimising the Operation of an Integrated DC Link within an AC System
Start date:
Jul 2011
End date:
Dec 2011
Funding mechanism:
- IFI
Composite Cross Arms Study
Start date:
Jun 2007
End date:
Oct 2013
Funding mechanism:
- IFI
Ratings of Cables in Tunnels (RoCiT)
Start date:
Aug 2007
End date:
Dec 2023
Funding mechanism:
- IFI
Overhead Line Robotic Technology
Start date:
Oct 2005
End date:
Mar 2012
Funding mechanism:
- IFI
Live Working in Substations (Feasibility Study)
Start date:
Jan 2012
End date:
Mar 2013
Funding mechanism:
- IFI
Finite Element Analysis for Ratings (FEAR)
Start date:
Sep 2004
End date:
Mar 2012
Funding mechanism:
- IFI
Oil/Paper Insulation HVDC Performance
Start date:
Oct 2010
End date:
Sep 2013
Funding mechanism:
- IFI
Electromagnetic Transients (EMT) in Future Power Systems – Phenomena, Stresses & Modelling
Start date:
May 2008
End date:
Dec 2015
Funding mechanism:
- IFI
Control of Cable Tunnel Ventilation (CCTV)
Start date:
Jul 2011
End date:
Mar 2012
Funding mechanism:
- IFI
ESO Future Transmission System Stability Analysis
Start date:
Sep 2011
End date:
Jan 2012
Funding mechanism:
- IFI

Constraint and Reserve Optimisation for Wind Generation (CROW)
Start date:
Oct 2011
End date:
Oct 2015
Funding mechanism:
- IFI
Test of Multi Terminal Voltage Sourced Converter (VSC) HVDC Control Strategies by Means of an Analogue Test Rig
Start date:
Jan 2012
End date:
Jun 2012
Funding mechanism:
- IFI

Flexible Rating Options for DC Operation (FRODO)
Start date:
Mar 2008
End date:
Mar 2011
Funding mechanism:
- IFI
Improve Reliability of Future System by Enabling Integration of New Generation
Start date:
Apr 2007
End date:
Mar 2013
Funding mechanism:
- IFI
Satellite Based Loss of Mains (LoM)
Start date:
Feb 2009
End date:
Mar 2009
Funding mechanism:
- IFI
Scenario Scoping for DSM Price Signals
Start date:
Jun 2011
End date:
Dec 2011
Funding mechanism:
- IFI

Alternative Fluids for Transformers
Start date:
Apr 2008
End date:
Mar 2008
Funding mechanism:
- IFI
Investigation Into the Performance of a Nano Coating for High Voltage Substation Insulation
Start date:
Feb 2009
End date:
Mar 2009
Funding mechanism:
- IFI
Non Conventional Instrument Transformers (NCIT) Pilot Project Closures
Start date:
Mar 2011
End date:
May 2012
Funding mechanism:
- IFI
Polymeric Insulation Evaluation
Start date:
Sep 2007
End date:
Jun 2011
Funding mechanism:
- IFI
33kV Fault Current Limiter
Start date:
Sep 2011
End date:
May 2015
Funding mechanism:
- IFI
Trial & Performance Assessment of ACCR Conductor (3M)
Start date:
Sep 2011
End date:
Sep 2012
Funding mechanism:
- IFI
FEA Modelling of Current Transformers with Composite Insulators in Various Rigid Busbar Configurations
Start date:
Jan 2010
End date:
Jan 2014
Funding mechanism:
- IFI
Enhanced Lubrication for National Grid HV Maintenance
Start date:
Sep 2008
End date:
Mar 2013
Funding mechanism:
- IFI
Long Term Performance of Silicone Based Composite Insulators
Start date:
Aug 2008
End date:
Apr 2014
Funding mechanism:
- IFI
Power Cable Materials Related TSB Project: Sustainable Power Cable Materials Technologies with Improved Whole Life Performance
Start date:
Apr 2009
End date:
Aug 2008
Funding mechanism:
- IFI
Electric Power Research Insititute (EPRI) Substations
Start date:
Mar 2006
End date:
Oct 2009
Funding mechanism:
- IFI
Power Networks Research Academy
Start date:
Jan 2004
End date:
Feb 2015
Funding mechanism:
- IFI
SuperGen – HiDEF (Highly Distributed Energy Future)
Start date:
Mar 2009
End date:
Mar 2011
Funding mechanism:
- IFI
European FP7 Projects - Real Smart
Start date:
Nov 2007
End date:
Dec 2010
Funding mechanism:
- IFI
European FP7 Projects - iTESLA
Start date:
Nov 2011
End date:
Mar 2015
Funding mechanism:
- IFI
Resilient Electricity Networks for Great Britain (RESNET)
Start date:
Oct 2007
End date:
Sep 2015
Funding mechanism:
- IFI
Supergen FlexNet
Start date:
May 2008
End date:
Aug 2010
Funding mechanism:
- IFI
Electric and Magnetic Fields and Health
Start date:
Feb 2009
End date:
Jul 2013
Funding mechanism:
- IFI
TSO - DNO Real Time Data Exchange for Smartgrid Operation
Start date:
Jun 2006
End date:
Mar 2011
Funding mechanism:
- IFI

Voltage Transducers for Power Quality Measurements
Start date:
Nov 2008
End date:
Sep 2011
Funding mechanism:
- IFI

SmartZone Project
Start date:
Dec 2007
End date:
Mar 2016
Funding mechanism:
- IFI
Quantifying Benefits and Risks of Applying Advanced Network Control and Demand Response Technologies to Enhance Transmission Network Performance
Start date:
Jul 2011
End date:
Oct 2013
Funding mechanism:
- IFI
Fault Management of the Multi-terminal VSC HVDC using Delayed Auto-Re- Configuration (DARC) Schemes
Start date:
Oct 2006
End date:
Sep 2009
Funding mechanism:
- IFI
Simulation of Multi-Terminal VSC HVDC System by Means of Real Time Digital Simulator (RTDS)
Start date:
Mar 2009
End date:
Mar 2011
Funding mechanism:
- IFI
Future Real Time Demand Forecasting
Start date:
Sep 2011
End date:
Dec 2011
Funding mechanism:
- IFI

A Combined Approach to Wind Profile Prediction
Start date:
Sep 2011
End date:
Sep 2014
Funding mechanism:
- IFI

Multi-terminal VSC HVDC Operation, Control and AC System Integration
Start date:
Oct 2011
End date:
Mar 2015
Funding mechanism:
- IFI
MI HVDC Cable Load Cycling
Start date:
Jan 2009
End date:
Oct 2015
Funding mechanism:
- IFI
Development of Advanced Line-Commutated Converter (LCC) HVDC Model for System Studies
Start date:
Aug 2008
End date:
Jun 2012
Funding mechanism:
- IFI

Strategic Research & Development (Programme)
Start date:
Jan 2012
End date:
Oct 2010
Funding mechanism:
- IFI
Distribution Transformer with On-Load Tap Changer (OLTC)
Start date:
Jul 2006
End date:
Mar 2011
Funding mechanism:
- IFI
FuseRestore (Now the Bidoyng Smart Fuse)
Start date:
Oct 2006
End date:
Apr 2008
Funding mechanism:
- IFI
Expansion Planning
Start date:
Apr 2006
End date:
Mar 2011
Funding mechanism:
- IFI
Vegetation Management
Start date:
Nov 2007
End date:
Dec 2011
Funding mechanism:
- IFI
Radiometric Arc Fault Location
Start date:
Nov 2007
End date:
Nov 2009
Funding mechanism:
- IFI
Wide Area Data Gathering
Start date:
Apr 2008
End date:
Mar 2011
Funding mechanism:
- IFI
Condition Based Risk Management for Cables
Start date:
Oct 2008
End date:
Aug 2009
Funding mechanism:
- IFI
Transient Ferroresonance Study
Start date:
Apr 2009
End date:
Mar 2011
Funding mechanism:
- IFI
Conductor Mounted Sensor
Start date:
Apr 2009
End date:
Mar 2011
Funding mechanism:
- IFI
SG Scoping Study
Start date:
Nov 2009
End date:
Jan 2010
Funding mechanism:
- IFI
Overhead Line Fault Passage Indicators
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Thermal Modelling and Active Network Management
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
AURA NMS
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
LV Network Automation
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Monitoring Solution for Overhead Networks
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
ENA Collaborative IFI Projects
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
GIS Impedance Mapping zMap
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Outram Fault Level Monitor
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Distribution Network Analysis
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Storm Assessment
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Radiometric Arc Fault Location
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Network Resilience to Weather
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
ENMAC Mobile
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
LV System Losses
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Smart Metering Op Benefit
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Integrated Demand Side Management and Energy Storage (Shetland Battery)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Orkney Active Power Network (Phase 3) Electrical State Estimation
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
PURL2 Stage 1
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Protection Performance Study IEC 61850 & Evaluation of IEC61850 - 9 - 2 Process Bus
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Feasibility of an Active Network Management Solution
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
International DSM Survey
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Advanced Management of Tap Changers
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Understanding Ageing Mechanisms in XLPE Cables
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Condition Monitoring of Composite Insulators
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI
Grid Transformer Monitoring
Start date:
Apr 2006
End date:
Mar 2010
Funding mechanism:
- IFI
Supergen V AMPerES
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
GIS Data Definition
Start date:
Apr 2010
End date:
Mar 2012
Funding mechanism:
- IFI
Transformer Oil Health Index Tool
Start date:
Apr 2010
End date:
Mar 2011
Funding mechanism:
- IFI
Algorithmic Automation
Start date:
Apr 2010
End date:
Mar 2011
Funding mechanism:
- IFI
The Zefal Generator for Active Urban Networks
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
LV Underground Cable Fault Management
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI
Optimal Transformer Utilisation Model
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI
Network Risk Management
Start date:
Apr 2006
End date:
Mar 2010
Funding mechanism:
- IFI
Vacuum Tap Changer
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI
Recycling Excavated Material
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Lone Worker Risk Management
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Multiple Cable Ratings in Ventilated Tunnels
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Advanced Harmonic Monitoring
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Online Monitoring Integration
Start date:
Oct 2007
End date:
Dec 2010
Funding mechanism:
- IFI
Smart Assest Management - Condition Monitoring of Circuit Breakers
Start date:
Nov 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Smart Asset Management - Remote Mass Flow Meters
Start date:
Mar 2009
End date:
Mar 2009
Funding mechanism:
- IFI
Review of Voltage Dependency of Load
Start date:
Jan 2009
End date:
Jul 2009
Funding mechanism:
- IFI

Demand Response
Start date:
Nov 2008
End date:
Feb 2010
Funding mechanism:
- IFI

Communication of System Wide Quantities
Start date:
May 2007
End date:
Jan 2014
Funding mechanism:
- IFI
Reducing Climate Change Impacts
Start date:
Jul 2007
End date:
Dec 2010
Funding mechanism:
- IFI

SuperGUM
Start date:
Oct 2007
End date:
Sep 2010
Funding mechanism:
- IFI
Harmonic Data Gathering Project Organised by ENA
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI

Scheme 20448 Development of a Live Wrap Replacement Techniques for OHLs Using a Modified SCC System
Start date:
Mar 2009
End date:
Mar 2011
Funding mechanism:
- IFI
Earthwire Platform
Start date:
Jul 2008
End date:
Sep 2010
Funding mechanism:
- IFI
Remote Control of Bird Scarers
Start date:
Apr 2008
End date:
Mar 2011
Funding mechanism:
- IFI
Vegetation Management Research
Start date:
Aug 2009
End date:
May 2010
Funding mechanism:
- IFI
ACSR Corrosion Research
Start date:
May 2008
End date:
Mar 2015
Funding mechanism:
- IFI
Electric Field / Microshock mitigation
Start date:
Oct 2010
End date:
Sep 2012
Funding mechanism:
- IFI
Severn Cable Tunnel Access/Egress Trolley
Start date:
Feb 2006
End date:
Aug 2010
Funding mechanism:
- IFI
Automatic Risk Based Handling of Plant Enquiries Relating to National Grid Transmission Electricity and Gas Assets
Start date:
Mar 2008
End date:
Dec 2009
Funding mechanism:
- IFI
Cable Asset Life Project
Start date:
Dec 2008
End date:
Sep 2010
Funding mechanism:
- IFI
SODA
Start date:
Oct 2007
End date:
Sep 2010
Funding mechanism:
- IFI
Cable Oil Leaks & Thermal Data Analysis
Start date:
Oct 2008
End date:
Sep 2009
Funding mechanism:
- IFI
Recovery of Cable Core
Start date:
Feb 2009
End date:
Mar 2009
Funding mechanism:
- IFI
Bolney 400kV MSCDN Insulation Co-ordination Studies and Measurements
Start date:
Nov 2008
End date:
Jan 2011
Funding mechanism:
- IFI
Development and Approval of 190KN Extra Creepage Length (ECL) Suspension and Tension Insulators
Start date:
Jun 2010
End date:
Apr 2011
Funding mechanism:
- IFI
Evaluation of the Performance and Application of Process Bus
Start date:
Jan 2009
End date:
Dec 2010
Funding mechanism:
- IFI

Feasibility of Using Trifluoromethyl Iodide as a Replacement for SF6 in High Voltage Switchgear
Start date:
Aug 2009
End date:
Dec 2010
Funding mechanism:
- IFI
Replacement of SF6 in Transmission Switchgear
Start date:
Jan 2009
End date:
Dec 2010
Funding mechanism:
- IFI
Air System Conditioning Monitoring
Start date:
Nov 2008
End date:
Jan 2011
Funding mechanism:
- IFI
Demountable Flood Barrier Facilitating Work Phase 1 and 2
Start date:
Oct 2010
End date:
Dec 2014
Funding mechanism:
- IFI

Determine the Resilience of GPS Clocks and Installations to Substation and Externally Generated Radiated Interference
Start date:
Feb 2009
End date:
May 2009
Funding mechanism:
- IFI
High Contact Resistance on SF6
Start date:
Feb 2007
End date:
Feb 2010
Funding mechanism:
- IFI
Bus Transfer Capability
Start date:
Jan 2008
End date:
Sep 2010
Funding mechanism:
- IFI
Environmentally Acceptable Alternatives to SF6
Start date:
Feb 2008
End date:
Mar 2011
Funding mechanism:
- IFI
Uneven Dynamic Voltages
Start date:
Oct 2007
End date:
Dec 2009
Funding mechanism:
- IFI
Improved Life Cycle Costing Methods
Start date:
Jun 2008
End date:
Jan 2010
Funding mechanism:
- IFI
Smart Asset Management - Energy Harvesting Technology for Self-Powering Condition Monitoring Sensors
Start date:
Feb 2009
End date:
Mar 2009
Funding mechanism:
- IFI
Demonstration of Distributed Demand Side Management as a Service to the UK Grid Operator
Start date:
Feb 2009
End date:
Mar 2009
Funding mechanism:
- IFI
DC Supply Com Air Energy Storage System Pnu Power
Start date:
Feb 2009
End date:
Mar 2009
Funding mechanism:
- IFI
PHILON
Start date:
Feb 2009
End date:
Mar 2009
Funding mechanism:
- IFI
Radiometric Arc Fault Location
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Waveform Analysis for Distribution Level Identification of Load Type
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Electric Power Research Institute Intelligent Universal Transformer
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Voltage Control ACTIV
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Flood Risk Modelling
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Zero Fault Level Generation for Active Urban Network (ZEFAL)
Start date:
Apr 2008
End date:
Mar 2011
Funding mechanism:
- IFI
Black Start Study
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Power Line Carrier Demonstration
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Regional Allocation of Carbon Emissions
Start date:
Apr 2010
End date:
Mar 2010
Funding mechanism:
- IFI
Voltage Gradient Fault Detection
Start date:
Apr 2010
End date:
Mar 2010
Funding mechanism:
- IFI
Remote Access to Pole Mounted Auto Reclosers
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Condition Based Risk Management Criticality Assessment
Start date:
Apr 2004
End date:
Mar 2010
Funding mechanism:
- IFI
Line Tracker Development
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Rezap Fault Master Developments
Start date:
Feb 2006
End date:
Jan 2008
Funding mechanism:
- IFI
IHost Developments
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Delta V Developments and Trials
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
Indoor Substation Environments
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Remote Monitoring Software Development
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Network Resilience
Start date:
Jun 2009
End date:
Aug 2009
Funding mechanism:
- IFI
Network Resilience Feasibility Phase
Start date:
Jun 2009
End date:
Aug 2009
Funding mechanism:
- IFI
Supergen V AMPerES
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Partial Discharge Mini Monitor
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
IntelliTeam DA
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Trenchless Washover System
Start date:
May 2006
End date:
Mar 2010
Funding mechanism:
- IFI
No Interruptions
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Losses Reduction
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Live Alert
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
275kV Alternative Conductor
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
132kV Trifurcating Joint
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Western Isles Generation Capacity Studies
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Western Isles Cable Studies
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Tower Loading Risk Assessment
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Composite 132kV Insulators
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Distribution System State Estimation
Start date:
Apr 2005
End date:
Mar 2009
Funding mechanism:
- IFI
Activ Project
Start date:
Apr 2007
End date:
Mar 2009
Funding mechanism:
- IFI
33kV Voltage Control
Start date:
Apr 2006
End date:
Mar 2009
Funding mechanism:
- IFI
FENIX
Start date:
Apr 2005
End date:
Mar 2009
Funding mechanism:
- IFI
Application of Storage and Demand Side Management
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Risk Management of Assets
Start date:
Apr 2008
End date:
Mar 2009
Funding mechanism:
- IFI
Improved Fluid Filled Cable Leak Location System
Start date:
Apr 2008
End date:
Mar 2009
Funding mechanism:
- IFI
Overhead Line Fault Location
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Innovative 132kV Joint Development
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Evaluation of the Characteristics of Alternative Oils for Retro Filling Power Transformers and for Use in New Transformers (Phase 2)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Network Technical Losses Reduction
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Steyning Primary Registered Power Zone
Start date:
Apr 2009
End date:
Mar 2010
Status:
Live
Funding mechanism:
- Registered Power Zones
Smart Network Trial
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Helicopter Mounted Partial Discharge Detection Feasibility Trial
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Supergen V AMPerES
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Efficient Incorporation of Intermittent Generation Considerations in Network Design
Start date:
Feb 2007
End date:
Feb 2010
Funding mechanism:
- IFI
Oil Level Monitor
Start date:
Jan 2009
End date:
Feb 2011
Funding mechanism:
- IFI
Smart Assest Management - Smartlife Workgroup
Start date:
Feb 2009
End date:
Mar 2009
Funding mechanism:
- IFI
Smart Assest Management - Full Site Trial of Condition Monitoring
Start date:
Sep 2009
End date:
Dec 2009
Funding mechanism:
- IFI
Smart Assest Management - Bi-Directional R.F Intra-Substation Communications System
Start date:
Feb 2009
End date:
Mar 2009
Funding mechanism:
- IFI
Smart Assest Management - Noise Recorder GPRS Interface to Provide Online Data Logging Facility
Start date:
Jul 2009
End date:
Jan 2010
Funding mechanism:
- IFI
Substation Compaction
Start date:
Apr 2006
End date:
Sep 2009
Funding mechanism:
- IFI
Terrestrial Laser Survey of Substation Assets
Start date:
Jul 2008
End date:
Mar 2009
Funding mechanism:
- IFI
Verification and Benchmark Testing of Dynamic Short Circuit (SC) Ratings for Civil Structures - Feasibility Study
Start date:
Sep 2009
End date:
Dec 2009
Funding mechanism:
- IFI
Ballistic Screening
Start date:
Oct 2005
End date:
Oct 2009
Funding mechanism:
- IFI
Substation Indication Discharge Detection (SIDD)
Start date:
Jul 2009
End date:
Jan 2010
Funding mechanism:
- IFI
OMU Top Up tanks
Start date:
Jan 2009
End date:
Jun 2009
Funding mechanism:
- IFI
Development of an Interlock System for Portable Primary Earths on the National Grid System
Start date:
Dec 2008
End date:
Nov 2009
Funding mechanism:
- IFI
Current and Earth Potential at Substations
Start date:
Aug 2006
End date:
Oct 2009
Funding mechanism:
- IFI
Sulphur in Oil Trial
Start date:
Jul 2008
End date:
Jul 2009
Funding mechanism:
- IFI
Digital Control System Upgrade
Start date:
Mar 2009
End date:
Feb 2010
Funding mechanism:
- IFI
Reference Networks (Phase 2)
Start date:
Apr 2004
End date:
Mar 2008
Funding mechanism:
- IFI
Electricity Supply Fault Level Instrument
Start date:
Apr 2005
End date:
Mar 2007
Funding mechanism:
- IFI
Vista Mapping Underground Assets
Start date:
Apr 2005
End date:
Mar 2008
Funding mechanism:
- IFI
TP 22 LV Fault Locator
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
Delta V Developments and Trials
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
LV Sure
Start date:
Apr 2006
End date:
Mar 2009
Funding mechanism:
- IFI
LV Sure (Phase 2)
Start date:
Apr 2008
End date:
Mar 2009
Funding mechanism:
- IFI
Chromatic Oil Analysis (Phase 1)
Start date:
Oct 2008
End date:
Aug 2008
Funding mechanism:
- IFI
Transient Resonance Study
Start date:
Apr 2008
End date:
Mar 2011
Funding mechanism:
- IFI
Alternative Oils for Transformers Stage 2
Start date:
Apr 2008
End date:
Mar 2009
Funding mechanism:
- IFI
Climate Change Impact On Network Resilience
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Radiometric Arc Fault Location
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
ENA/ENFG Smart Grid Studies
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Activ Project
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Flex Net
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Health Indices Development Wood pole OHL and Distribution Substations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Network Risk Modelling
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
ZEFAL Generator for Active Urban Networks
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Supergen V AMPerES
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Pole Leakage Mitigation
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Remote Indicating Fault Passage Indicators
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
UltraTev Alarm Trial
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Stability of Loss of Mains Relays (LoM) to Transient Faults
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Loss of Mains Relays (LoM) for Generation Interface Protection
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Reverse Reactive Power Relays
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Health Index Development EHV Cables
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Asset Condition Data Strategy
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Reference Networks
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Met Office Energy Phase 2 Climate Change Modelling
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Woodhouse Steel Girder Mast Replacement Specification
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Technology Roadmap
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Loss of Mains (LoM) Protection (ROCOF) Phase 2
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
NaREC LV AVC feasibility Study
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Innovative Fault Passage Indicator for Cable Systems (GM FPI)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
GROND Contingency Analysis
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Long Underground EHV Cables
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Oil Degradation
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
OBYR14 UV Camera Survey
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Condition Based Risk Management
Start date:
Dec 2010
End date:
Sep 2011
Funding mechanism:
- IFI
Fibre Optic Based Substation Communications
Start date:
Apr 2005
End date:
Mar 2008
Funding mechanism:
- IFI
ENA Lightning Protection
Start date:
Apr 2005
End date:
Mar 2007
Funding mechanism:
- IFI
Line Tracker Trial
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
LV Voltage Regulator
Start date:
Apr 2005
End date:
Mar 2008
Funding mechanism:
- IFI
Resilience and Investment Model
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
Climate Change
Start date:
Apr 2007
End date:
Mar 2008
Funding mechanism:
- IFI
Alternative Oils for Transformers Stage 1
Start date:
Apr 2004
End date:
Mar 2007
Funding mechanism:
- IFI
NaFIRS HV Fault Data
Start date:
Apr 2005
End date:
Mar 2007
Funding mechanism:
- IFI
Functional Spec ROCOF Relay
Start date:
Apr 2005
End date:
Mar 2007
Funding mechanism:
- IFI
Distributed IO
Start date:
Apr 2005
End date:
Mar 2006
Funding mechanism:
- IFI
Software Tool for Allocating Distribution Losses
Start date:
Apr 2004
End date:
Mar 2006
Funding mechanism:
- IFI
Cost Effective Marginal Distribution Network Pricing Methodology
Start date:
Apr 2004
End date:
Mar 2005
Funding mechanism:
- IFI
Integration of Substation Relay Information (Skerneside Trial)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Single Phase Low Voltage Regulators
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Fault Level Monitor Project
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Development of Redox Flow Battery for Energy Storage
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Innovative Protection Solutions
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
MANtIS (Managing Active Networks through Intelligent Systems)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Tower Foundation Radar
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Energy Innovation Centre
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Impact of Climate Change Energy (Phase 2) MET Office
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Asset Decision Support Dashboard
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Lattice Steel Tower Protective Coatings
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
4Energy Low Carbon Comms Cooling
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Ashton Hayes Microgrid
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Wind Turbine Effects on Transmission Lines
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Health Indices for Asset Management Decision Making
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Sub.net Monitoring
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
GB SQSS Review Studies
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Alternative Design for 132kV Overhead Lines
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Radiometric Substation Monitoring
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
L36 33kV Overhead Line Spec inc. OPPC
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Offline Corrosion Monitoring (Towers)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Remote Line Temperature Monitor
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
GridSense LineTracker FPI (Conductor Temperature)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Pole Leakage Detection Device (Phase 1-3)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Energy Storage Devices for Distribution Networks
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Fault Infeed Calculations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Advanced Cable Technologies
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
ESR Network (ESR 21)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Portable Smart Link (ASL) Tester
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Smart Dust (Phase 1)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Scottish Power/Rolls Royce Prototype Network
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Supergen III
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Overhead Line Uprating Project Compact Transmission Lines
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Substation Acoustic Monitoring
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
4Energy Battery Aircon Device
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Kelman Circuit Breaker Intelligence Analysis
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Minimum Switchgear Project
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
IED Radio
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Broadband Power Carrier
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Testing Procedure for ROCOF Relays
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Hydrogen Electrolyser / Storage DTI Submission
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Optimising Voltage Control / Var Performance of a Large Scale Wind Farms
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
ENA Lightning Protection
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
HV Sure
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Self Tuning Petersen
Start date:
Jul 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Integrated Vegetation Management
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Dynamic Sag Monitor
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Multi Terminal DC Micro Grid
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Power Electronics Regulator
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
CBRM (Transformers)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
CRATER for Submarine Cables
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Application of Storage & Demand Side Management
Start date:
Jul 2008
End date:
Mar 2010
Funding mechanism:
- IFI
275kV Woodpole Design
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Orkney Active Distribution Network Management
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- Registered Power Zones
Huddig
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
FPIs + GSM
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Underground Cable Plough
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Live Line High-Res Camera
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Shetland RPZ
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- Registered Power Zones
Network Damage Assessment
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
POLESTAR FPIs
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Portable Fault Passage Indicators (FPIs) with GSM Communications
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Development of Downstream OYT Operation Detector
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Communications Network Study
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
GPS Technology with Datalogger
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Geographic Information System (GIS) to Vehicles and Strategic Substations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Template 2 Automation
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
A New Approach to 11kV Network Design
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Vulnerable Customer UPS
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
Intelligent Distribution Network Monitoring
Start date:
Apr 2008
End date:
Mar 2009
Funding mechanism:
- IFI
Distributed Generation (DG) Connection Planner
Start date:
Apr 2006
End date:
Mar 2009
Funding mechanism:
- IFI
Advanced Forensic Methods
Start date:
Apr 2008
End date:
Mar 2009
Funding mechanism:
- IFI
Distributed Generation Planning Software
Start date:
Apr 2007
End date:
Mar 2008
Funding mechanism:
- IFI
GenAVC Assessment Tool
Start date:
Apr 2005
End date:
Mar 2008
Funding mechanism:
- IFI
Battery Asset Management
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
Transformer Damping
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
Domestic Cut Out Temp Indicators
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
Power Factor Analysis
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
Primary SCADA Communications IP Upgrade
Start date:
Apr 2007
End date:
Mar 2008
Funding mechanism:
- IFI
Impact of Climate Change on the UK Energy Industry
Start date:
Apr 2007
End date:
Mar 2008
Funding mechanism:
- IFI
RTU Local Display Facility
Start date:
Apr 2007
End date:
Mar 2008
Funding mechanism:
- IFI
Improvements in Overhead Line Performance
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
Wood Pole Disposal
Start date:
Apr 2005
End date:
Mar 2008
Funding mechanism:
- IFI
Electrical Energy Harvesting from Vibrations
Start date:
Apr 2006
End date:
Mar 2008
Funding mechanism:
- IFI
Transformer Temperature Fibre Optic Monitoring
Start date:
Apr 2005
End date:
Mar 2008
Funding mechanism:
- IFI
The Use of Perfluorocarbon Tracers (PFT) Leak Location Techniques
Start date:
Apr 2005
End date:
Mar 2007
Funding mechanism:
- IFI
Risk Assessment
Start date:
Apr 2005
End date:
Mar 2006
Funding mechanism:
- IFI
Energy Efficiency in Substations
Start date:
Apr 2005
End date:
Mar 2006
Funding mechanism:
- IFI
Low Voltage Automation
Start date:
Apr 2005
End date:
Mar 2006
Funding mechanism:
- IFI
National Committee Activity
Start date:
Apr 2005
End date:
Mar 2006
Funding mechanism:
- IFI
Network Resilience
Start date:
Apr 2005
End date:
Mar 2006
Funding mechanism:
- IFI
Protection Schemes Demonstration Tool
Start date:
Apr 2005
End date:
Mar 2006
Funding mechanism:
- IFI
Relay Tester
Start date:
Apr 2005
End date:
Mar 2006
Funding mechanism:
- IFI
Martham Primary RPZ
Start date:
Apr 2005
End date:
Mar 2006
Status:
Live
Funding mechanism:
- Registered Power Zones
Fault Level Monitor Project
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Impact of Climate Change on the UK Energy Industry
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI
Life Cycle Assessment of 11kV Overhead Line and Underground Cable
Start date:
Apr 2008
End date:
Mar 2010
Funding mechanism:
- IFI
Condition Based Risk Management Cables
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
UltraTEV Alarm
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Charging Methodologies
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Mobile SCADA
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
ENA Lightning Protection
Start date:
Jan 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Remote Access to Substations
Start date:
Sep 2004
End date:
Sep 2009
Funding mechanism:
- IFI
Understanding and Mitigation of Hazards Related to Transmission Tower (TT) Bases
Start date:
Sep 2010
End date:
Mar 2014
Funding mechanism:
- IFI

Terrestrial Laser Survey
Start date:
Jul 2008
End date:
Mar 2009
Funding mechanism:
- IFI
River Crossing Dampers
Start date:
Dec 2006
End date:
Aug 2012
Funding mechanism:
- IFI
Design and Development of Maintenance Delivery Tools (MDT)
Start date:
Sep 2010
End date:
Mar 2014
Funding mechanism:
- IFI
Flooding Risk Analysis Pluvial Flooding Risk
Start date:
Feb 2012
End date:
May 2012
Funding mechanism:
- IFI
Weather Observation Network Review and Trial
Start date:
Dec 2007
End date:
Mar 2009
Funding mechanism:
- IFI
Data Visualization
Start date:
Aug 2011
End date:
Mar 2015
Funding mechanism:
- IFI
Network Design New Generation
Start date:
Oct 2008
End date:
Mar 2008
Funding mechanism:
- IFI

Network Design System Stability
Start date:
Nov 2011
End date:
Mar 2012
Funding mechanism:
- IFI
New Technology to Enable the Connection of Low Carbon Generation (LCG)
Start date:
Sep 2004
End date:
Mar 2012
Funding mechanism:
- IFI
Infrastructure Development for the Electricity Transmission Network for 2020 to 2030
Start date:
Jun 2011
End date:
Dec 2009
Funding mechanism:
- IFI
Charge Development of GIS Spacers
Start date:
Sep 2007
End date:
Oct 2009
Funding mechanism:
- IFI
Grading Capacitor Condition Evaluation
Start date:
Mar 2008
End date:
Sep 2012
Funding mechanism:
- IFI
Vacuum Tapchanger
Start date:
Jun 2011
End date:
Mar 2012
Funding mechanism:
- IFI
Smart Asset Management - ARMADA
Start date:
Jan 2009
End date:
Dec 2014
Funding mechanism:
- IFI
Smart Asset Management - Remote Connection to Partial Discharge Monitoring
Start date:
Sep 2011
End date:
Mar 2009
Funding mechanism:
- IFI
Smart Asset Management - Energy Scavenging Technology
Start date:
Apr 2009
End date:
Mar 2009
Funding mechanism:
- IFI
Substation Design Reliability
Start date:
May 2008
End date:
Mar 2009
Funding mechanism:
- IFI
Portable Primary Earthing (PPE)
Start date:
Jun 2009
End date:
Jul 2012
Funding mechanism:
- IFI
Understanding Conduction Mechanisms in Earthing Systems and Optimisation of Earth Electrode Geometries
Start date:
Nov 2009
End date:
Nov 2011
Funding mechanism:
- IFI
Wide Area Monitoring Protection & Control (WAMPAC)
Start date:
Dec 2007
End date:
Jan 2011
Funding mechanism:
- IFI
Collapse Prediction on Transmission Networks
Start date:
Oct 2007
End date:
Sep 2010
Funding mechanism:
- IFI
Lubrication Rationalisation
Start date:
Oct 2006
End date:
Mar 2013
Funding mechanism:
- IFI
Reduced Asset Related Safety Incidents
Start date:
Jun 2010
End date:
Aug 2011
Funding mechanism:
- IFI
Flood Risk Strategy Development
Start date:
Nov 2007
End date:
Mar 2008
Funding mechanism:
- IFI
Flood Risk Study
Start date:
Nov 2007
End date:
Mar 2008
Funding mechanism:
- IFI
Ostwald Coefficients for Cable Oil
Start date:
Apr 2008
End date:
Jun 2008
Funding mechanism:
- IFI
Portable Oil in Soil Measuring Instrument
Start date:
Sep 2007
End date:
Sep 2008
Funding mechanism:
- IFI
Multi Agent Based Wide Area Protection
Start date:
Dec 2006
End date:
Sep 2010
Funding mechanism:
- IFI
Smart Grid Oscillation Management for a Changing Generation Mix (Psymetrix)
Start date:
Feb 2009
End date:
Nov 2012
Funding mechanism:
- IFI

ROADS
Start date:
Apr 2007
End date:
Mar 2010
Funding mechanism:
- IFI
Plastic V Concrete Cable Protection
Start date:
Oct 2007
End date:
Mar 2012
Funding mechanism:
- IFI
Potential Impact of Wind Turbines on Overhead Lines (Phase 1)
Start date:
Feb 2009
End date:
Feb 2009
Funding mechanism:
- IFI
Greasy Conductor Interstices Cleaner
Start date:
Aug 2011
End date:
Jun 2014
Funding mechanism:
- IFI
Composite Technology Conductor Trial
Start date:
Feb 2009
End date:
Oct 2007
Funding mechanism:
- IFI
Unmanned Aerial Vehicles (UAVs)
Start date:
Jul 2008
End date:
Mar 2009
Funding mechanism:
- IFI
Reducing National Grid Carbon Footprint
Start date:
Nov 2011
End date:
Jan 2013
Funding mechanism:
- IFI
Development of Toolkit for the Remediation of Oil Contaminated Soils
Start date:
Apr 2006
End date:
Mar 2007
Funding mechanism:
- IFI
UK Investment Recovery
Start date:
Nov 2011
End date:
Mar 2015
Funding mechanism:
- IFI
Transformer Heat Recovery
Start date:
Jan 2009
End date:
Oct 2010
Funding mechanism:
- IFI
Aged Transformer Insulation Capability
Start date:
Oct 2004
End date:
Sep 2006
Funding mechanism:
- IFI
Control & Impact of Ferroresonance on Power Transformers
Start date:
Apr 2008
End date:
Sep 2011
Funding mechanism:
- IFI
Transformer Refurbishment Trial
Start date:
Dec 2011
End date:
Mar 2012
Funding mechanism:
- IFI
Dynamic Resistance of Transmission Tower Footings
Start date:
Sep 2003
End date:
Jun 2005
Funding mechanism:
- IFI
EPRI Power Delivery
Start date:
Apr 2009
End date:
Mar 2014
Funding mechanism:
- IFI
Transformer Life Management
Start date:
Oct 2007
End date:
Mar 2012
Funding mechanism:
- IFI
Ratings Developments
Start date:
Aug 2006
End date:
Nov 2007
Funding mechanism:
- IFI
Ageing Mechanisms in Composite Insulators
Start date:
Aug 2004
End date:
Oct 2007
Funding mechanism:
- IFI
Oils Technology
Start date:
Sep 2005
End date:
Apr 2012
Funding mechanism:
- IFI
Condition and Life Extension of Substation Assets
Start date:
Oct 2007
End date:
Apr 2011
Funding mechanism:
- IFI
Development to Upgrade Digital Control System
Start date:
Dec 2006
End date:
Feb 2010
Funding mechanism:
- IFI
Portable Earthing
Start date:
Oct 2011
End date:
Dec 2012
Funding mechanism:
- IFI
Alternative Technologies
Start date:
Sep 2008
End date:
Sep 2011
Funding mechanism:
- IFI
Substation Design
Start date:
Oct 2007
End date:
Dec 2010
Funding mechanism:
- IFI
Climate Change Work
Start date:
Nov 2011
End date:
May 2006
Funding mechanism:
- IFI
Flooding Risk Reduction
Start date:
Oct 2011
End date:
Sep 2014
Funding mechanism:
- IFI
Investigation to Network Resilience to Weather Events
Start date:
Apr 2011
End date:
Mar 2014
Funding mechanism:
- IFI

Developments in Protection and Control
Start date:
Aug 2009
End date:
Jan 2013
Funding mechanism:
- IFI
Measurement of 3rd Party Exposure to Rise of Earth Potential
Start date:
Oct 2010
End date:
Mar 2014
Funding mechanism:
- IFI

Composite Technology
Start date:
Jan 2009
End date:
Oct 2013
Funding mechanism:
- IFI
The Role of the Demand Side in Delivering Effective Smart Grids
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Enhanced Weather Modelling for Dynamic Line Rating
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Energy and Carbon Master Planning (ECMP)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
FM Sudafix Conductive Concrete
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
GnoSys Self Healing Cables
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Battery Alarm and EFI Signalling from HV Secondary Substations
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Transformer Research Consortium (Phase 3)
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
DNO Trial of Power Line Carrier (PLC) to Support Low Voltage SCADA
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Impact of Residential Heating and Building Standards on Demand Profiles
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Substation Efficiency
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
GB Electricity Demand Project
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Smart 3 Phase LV Voltage Regulator
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Transient Earth Detector
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
SUSCABLE 2
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Data Concentrator CCU & DNP3 Digital Radio Development
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Smart Meter Enablement
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Voltage Regulating Secondary Transformer
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Electric Boulevards
Start date:
Feb 2013
End date:
Mar 2015
Funding mechanism:
- LCNF Tier 1
GROND - Assessment of HV Network and Policy Module
Start date:
Apr 2004
End date:
Mar 2006
Funding mechanism:
- IFI
Intelligent Condition Monitoring and Diagnosis
Start date:
Apr 2009
End date:
Mar 2010
Funding mechanism:
- IFI
Development of Overhead Line Condition Monitoring Techniques
Start date:
Apr 2005
End date:
Mar 2006
Funding mechanism:
- IFI
Low Voltage Integrated Automation (LoVIA)
Start date:
Mar 2013
End date:
Jul 2015
Funding mechanism:
- LCNF Tier 1
Birds and Power Lines
Start date:
Apr 2013
End date:
Aug 2014
Funding mechanism:
- IFI
Composite Link Box Lids
Start date:
Feb 2012
End date:
Jul 2012
Funding mechanism:
- IFI
Conservation Voltage Reduction
Start date:
Nov 2012
End date:
May 2014
Funding mechanism:
- IFI
Duckbill Anchors
Start date:
Aug 2012
End date:
Aug 2013
Funding mechanism:
- IFI
Fluid Filled Cables Repair System
Start date:
Apr 2013
End date:
Nov 2014
Funding mechanism:
- IFI
IEA Smart Grids for Customers
Start date:
Sep 2012
End date:
Sep 2014
Funding mechanism:
- IFI
Load Allocation (Phase 2)
Start date:
Jul 2012
End date:
Jun 2014
Funding mechanism:
- IFI
Low Voltage Network Modelling
Start date:
Apr 2011
End date:
Mar 2013
Funding mechanism:
- IFI
LV Voltage Regulators
Start date:
Aug 2012
End date:
Feb 2014
Funding mechanism:
- IFI
Monitoring of PV Arrays
Start date:
Aug 2012
End date:
Aug 2013
Funding mechanism:
- IFI
Oil Regeneration Stage 1 & 2
Start date:
Nov 2011
End date:
Nov 2016
Funding mechanism:
- IFI
Primary Voltage Control
Start date:
Apr 2013
End date:
Oct 2013
Funding mechanism:
- IFI
Substation Security
Start date:
Jan 2014
End date:
Mar 2015
Funding mechanism:
- IFI
CBRM Extension – Health Indices
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Distribution Load Estimates Methodology
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Load Forecasting Scenario Model
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Smart Data
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
Contact Voltage Testing
Start date:
Apr 2012
End date:
Mar 2013
Funding mechanism:
- IFI
Detection of Broken and Low Hanging Conductors
Start date:
Apr 2014
End date:
Mar 2015
Funding mechanism:
- IFI
Developing Long Term Asset Risk Replacement Modelling
Start date:
Apr 2012
End date:
Mar 2013
Funding mechanism:
- IFI
Earthing Design Tool
Start date:
Apr 2013
End date:
Mar 2014
Funding mechanism:
- IFI
Energy Innovation Centre
Start date:
Apr 2012
End date:
Mar 2015
Funding mechanism:
- IFI
Fault Level Management Study
Start date:
Apr 2013
End date:
Mar 2015
Funding mechanism:
- IFI
Home Based Flexible Demand Management (HBFDM)
Start date:
Apr 2012
End date:
Mar 2013
Funding mechanism:
- IFI
Smart Power Distribution
Start date:
Apr 2012
End date:
Mar 2014
Funding mechanism:
- IFI
Carbon Tracing
Start date:
Jan 2005
End date:
Mar 2014
Funding mechanism:
- IFI
CuTS LV Overhead Line Project
Start date:
Jan 2005
End date:
Mar 2015
Funding mechanism:
- IFI
Demonstration Of Distribution Scale Energy Storage
Start date:
Jan 2005
End date:
Mar 2014
Funding mechanism:
- IFI
Identification and Prioritisation of Network Losses
Start date:
Jan 2005
End date:
Mar 2015
Funding mechanism:
- IFI
Reactive Power Compensation For Distribution Networks
Start date:
Jan 2005
End date:
Mar 2015
Funding mechanism:
- IFI
BellRock Lumen Condition Monitoring Decision Support
Start date:
Apr 2005
End date:
Mar 2010
Funding mechanism:
- IFI
2050 Energy Infrastructure Outlook
Start date:
Jan 2008
End date:
Aug 2013
Funding mechanism:
- IFI

A Tool for Evaluating Overhead Line Performance Under Novel Technology Implementations
Start date:
Apr 2011
End date:
Mar 2012
Funding mechanism:
- IFI
Alternative Differential Unit Protection for Cable only and Cable & OHL
Start date:
Sep 2010
End date:
Dec 2013
Funding mechanism:
- IFI
Application of DC Circuit Breakers in DC Grids
Start date:
Oct 2008
End date:
Jul 2017
Funding mechanism:
- IFI
Cables with Long Electrical Sections
Start date:
Sep 2004
End date:
Mar 2015
Funding mechanism:
- IFI
Co-managed Innovation Projects (SSE/NG/UMIP)
Start date:
Mar 2011
End date:
Dec 2015
Funding mechanism:
- IFI
Dinorwig Thermal Cycling and Cable Rating
Start date:
Oct 2005
End date:
Jun 2015
Funding mechanism:
- IFI
Dynamic Ratings for improved Operational Performance (DROP)
Start date:
Apr 2012
End date:
Mar 2015
Funding mechanism:
- IFI
Ultra Wire
Start date:
Oct 2008
End date:
Oct 2019
Funding mechanism:
- IFI
Fault Current Active Management (FCAM)
Start date:
Sep 2013
End date:
Mar 2015
Funding mechanism:
- LCNF Tier 1
Energy Control for Household Optimisation (ECHO)
Start date:
Aug 2013
End date:
Feb 2015
Funding mechanism:
- LCNF Tier 1
LV Protection And Communications (LV PAC)
Start date:
Sep 2013
End date:
Mar 2015
Funding mechanism:
- LCNF Tier 1
Community Energy Coaching Programme
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Community Energy Coaching Programme
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
CES Knowledge Transfer Partnership
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Vehicle to Grid
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Isle of Wight Losses Project
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Subsea Desktop Study Tool
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Green Running Load and DG Detection
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
BMW Active E
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Electric Bus for Glasgow
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Establish the Affordability of ADR
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Multi-Terminal Test Environment (MTTE) for HVDC Systems
Start date:
Jan 2014
End date:
Mar 2021
Funding mechanism:
- NIC
Visualisation of Real Time System Dynamics using Enhanced Monitoring (VISOR)
Start date:
Dec 2013
End date:
Mar 2017
Status:
Live
Funding mechanism:
- NIC
BioSNG Demonstration Plant
Start date:
Apr 2014
End date:
Mar 2017
Status:
Live
Funding mechanism:
- NIC
Low Carbon Gas Preheating
Start date:
Jan 2014
End date:
Dec 2017
Status:
Live
Funding mechanism:
- NIC
Smart Street (eta)
Start date:
Jan 2014
End date:
Dec 2017
Funding mechanism:
- LCNF Tier 2
Vulnerable Customers and Energy Efficiency
Start date:
Jan 2014
End date:
Dec 2017
Funding mechanism:
- LCNF Tier 2
Solent Achieving Value from Efficiency (SAVE)
Start date:
Jan 2014
End date:
Jun 2019
Funding mechanism:
- LCNF Tier 2
GPS Installation Condition Assessments & Interference Monitoring System Installations
Start date:
Apr 2012
End date:
Jun 2012
Funding mechanism:
- IFI
Mathematics of Balancing Energy Networks Under Uncertainty
Start date:
Jan 2012
End date:
Jul 2015
Funding mechanism:
- IFI
Modelling and Analysis of Potential Installations and Uses of Grid Scale Energy Storage in Great Britain
Start date:
Apr 2012
End date:
Mar 2013
Funding mechanism:
- IFI

Novel Backfill
Start date:
Oct 2011
End date:
Mar 2015
Funding mechanism:
- IFI
Novel Use of Distribution Equipment for Power Quality Management
Start date:
Jan 2012
End date:
Mar 2015
Funding mechanism:
- IFI
Power System Oscillation Damping with HVDC (POD) - Feasibility Study
Start date:
Oct 2012
End date:
Nov 2012
Funding mechanism:
- IFI

PPE Closing the Loop for Commodities and Workwear
Start date:
Oct 2012
End date:
Jun 2012
Funding mechanism:
- IFI
Impact of Electrolysers on the Distribution Network
Start date:
Oct 2013
End date:
Mar 2015
Funding mechanism:
- LCNF Tier 1
Smart Building Potential Within Heavily Utilised Networks
Start date:
Apr 2014
End date:
Mar 2015
Funding mechanism:
- LCNF Tier 1
Power Transformer Real Time Thermal Rating
Start date:
Jun 2014
End date:
Dec 2016
Funding mechanism:
- LCNF Tier 1
DISCERN
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Analysis of Transmission Solution for Distribution Networks (ATSD)
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Leak location & Oxifree Coatings
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Remote Access Soultions
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
ZeEUS
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Network Damage Reporter
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Orkney ANM Critical Circuits
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Overhead Line Vibration Monitoring
Start date:
Jan 2014
End date:
Mar 2010
Funding mechanism:
- IFI
Field Team Support Tool
Start date:
Jan 2014
End date:
Mar 2010
Funding mechanism:
- IFI
Fault Passage Indicator Consolidation
Start date:
Jan 2014
End date:
Mar 2010
Funding mechanism:
- IFI
Data matching for Smart Registration
Start date:
Jan 2014
End date:
Mar 2010
Funding mechanism:
- IFI
Cable Core Temperature Sensor
Start date:
Jan 2014
End date:
Mar 2010
Funding mechanism:
- IFI
RPAS Operational Requirements & Specifications For Aerial Inspection BVLOS
Start date:
Jan 2014
End date:
Mar 2010
Funding mechanism:
- IFI
Ultrapole
Start date:
Jan 2014
End date:
Mar 2010
Funding mechanism:
- IFI
PHD Power Net Asset Man
Start date:
Jan 2011
End date:
Mar 2010
Funding mechanism:
- IFI
Asset Man of LV Cables
Start date:
Jan 2011
End date:
Mar 2010
Funding mechanism:
- IFI
Sub Sea Cable Monitoring
Start date:
Jan 2011
End date:
Mar 2010
Funding mechanism:
- IFI
Harmonics Investigation
Start date:
Jan 2011
End date:
Mar 2010
Funding mechanism:
- IFI
Tellus GIS
Start date:
Jan 2011
End date:
Mar 2010
Funding mechanism:
- IFI
Hybrid Generator
Start date:
Jan 2011
End date:
Mar 2010
Funding mechanism:
- IFI
Phase Identification
Start date:
Jan 2011
End date:
Mar 2010
Funding mechanism:
- IFI
Cryogenic Storage Technology Review
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Aberdeen Hydrogen Feasibility Study
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
SASensor HMV Primary Substation Provider
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Mobile Diesel Generation with Battery Storage
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Markets for DSM and Storage-Phase 1
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Orkney Sub 50kW
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Orkney RPZ Phase 2
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Espirit Network Trial
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Real Time Java
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Methanation
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Grid Integration of Marine Energy
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
GENDRIVE
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Gynosys Self Healing Cables
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Radio Teleswitch Phase 2
Start date:
Jan 2012
End date:
Mar 2010
Funding mechanism:
- IFI
Copper Theft detection
Start date:
Jan 2013
End date:
Mar 2010
Funding mechanism:
- IFI
Respond (FLARE)
Start date:
Jan 2015
End date:
Aug 2018
Funding mechanism:
- LCNF Tier 2
Low Energy Automated Networks (LEAN)
Start date:
Jan 2015
End date:
Dec 2019
Funding mechanism:
- LCNF Tier 2
Network Equilibrium
Start date:
Mar 2015
End date:
Jun 2019
Funding mechanism:
- LCNF Tier 2
Enhanced Frequency Control Capability (EFCC)
Start date:
Jan 2015
End date:
Mar 2018
Status:
Live
Funding mechanism:
- NIC

Modular Approach to Substation Construction (MASC)
Start date:
Jan 2015
End date:
Jun 2019
Funding mechanism:
- NIC
In Line Robotic Inspection of High Pressure Installations
Start date:
Jan 2015
End date:
Nov 2018
Funding mechanism:
- NIC

Offshore Cable Repair Vessel and Universal Joint
Start date:
Jan 2015
End date:
Jul 2018
Status:
Live
Funding mechanism:
- NIC
Combined on-line Transformer Monitoring
Start date:
Sep 2014
End date:
Sep 2016
Funding mechanism:
- LCNF Tier 1
Digital Substation Platform - Phase 1
Start date:
Jan 2015
End date:
Mar 2015
Funding mechanism:
- LCNF Tier 1
Fault Sense
Start date:
Feb 2015
End date:
Mar 2018
Funding mechanism:
- LCNF Tier 1
Protection and Control Roadmap
Start date:
Jan 2010
End date:
Oct 2014
Funding mechanism:
- IFI

Reactive Power Demand Trends
Start date:
Jan 2013
End date:
Jan 2014
Funding mechanism:
- IFI

ROGER
Start date:
Jan 2013
End date:
Jan 2014
Funding mechanism:
- IFI

Seismic Analysis of Electricity Towers and Substation Structures
Start date:
Jan 2013
End date:
Jul 2012
Funding mechanism:
- IFI
SF6 Capture and Leakage Repair Technology
Start date:
Jan 2013
End date:
Dec 2013
Funding mechanism:
- IFI
Temporary Oil Containment
Start date:
Jan 2013
End date:
Mar 2013
Funding mechanism:
- IFI
ANGLE–DC
Start date:
Jan 2016
End date:
Apr 2020
Status:
Live
Funding mechanism:
- NIC
Celsius
Start date:
Jan 2016
End date:
Mar 2020
Funding mechanism:
- NIC
Offline Substation Environment for the Acceleration of Innovative Technologies (OSEAIT)
Start date:
Jan 2016
End date:
Oct 2020
Status:
Live
Funding mechanism:
- NIC
Future Intelligent Transmission NEtwork SubStation (FITNESS)
Start date:
Apr 2016
End date:
Mar 2020
Status:
Live
Funding mechanism:
- NIC
New Suite of Transmission Structures (NeSTS)
Start date:
Jan 2016
End date:
Mar 2022
Funding mechanism:
- NIC
The City CNG Project
Start date:
Dec 2015
End date:
Oct 2019
Status:
Live
Funding mechanism:
- NIC
Real-Time Networks
Start date:
Apr 2016
End date:
Apr 2020
Funding mechanism:
- NIC
Commercial BioSNG Demonstration Plant
Start date:
Dec 2015
End date:
Nov 2018
Status:
Live
Funding mechanism:
- NIC
Project CLoCC - Customer Low Cost Connections
Start date:
Feb 2016
End date:
Oct 2018
Funding mechanism:
- NIC

Powerful-CB: Power Electronic Fault Limiting Circuit Breaker
Start date:
Jan 2017
End date:
Aug 2021
Status:
Live
Funding mechanism:
- NIC
OpenLV
Start date:
Jan 2017
End date:
Mar 2021
Funding mechanism:
- NIC
Phoenix - System Security and Synchronous Compensators
Start date:
Jan 2017
End date:
Mar 2021
Status:
Live
Funding mechanism:
- NIC
Transmission & Distribution Interface 2.0 (TDI 2.0)
Start date:
Jan 2017
End date:
Dec 2019
Status:
Live
Funding mechanism:
- NIC

Future Billing Methodology
Start date:
Apr 2017
End date:
Mar 2020
Funding mechanism:
- NIC
HyDeploy
Start date:
Apr 2017
End date:
Mar 2020
Funding mechanism:
- NIC
Secondary Telecommunications Phase 3 – Trial of Hybrid Telecoms
Start date:
Nov 2017
End date:
Mar 2024
Status:
Live
Funding mechanism:
- Network Innovation Allowance
Drones Within Visual Line Of Sight (Drone WVLOS)
Start date:
Jan 2018
End date:
Oct 2020
Funding mechanism:
- Network Innovation Allowance
Eye In The Sky
Start date:
Jan 2018
End date:
Jan 2021
Funding mechanism:
- Network Innovation Allowance
H21 – Field Trials Design
Start date:
Jul 2018
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Active Response to Distribution Network Constraints
Start date:
Jan 2018
End date:
Nov 2023
Status:
Live
Funding mechanism:
- NIC
LV Engine
Start date:
Feb 2018
End date:
Dec 2022
Status:
Live
Funding mechanism:
- NIC
TRANSITION
Start date:
Jan 2018
End date:
Jun 2021
Funding mechanism:
- NIC
FUSION
Start date:
Jan 2018
End date:
Jan 2023
Status:
Live
Funding mechanism:
- NIC
Robotic Roadworks and Excavation System (RRES)
Start date:
Apr 2018
End date:
Apr 2022
Funding mechanism:
- NIC
H21
Start date:
Jan 2018
End date:
Dec 2020
Funding mechanism:
- NIC
Under Pressure Drilling Equipment for PE Construction Valves
Start date:
Feb 2018
End date:
Feb 2021
Funding mechanism:
- Network Innovation Allowance
Primary Networks Power Quality Analysis
Start date:
Mar 2018
End date:
Jun 2021
Funding mechanism:
- Network Innovation Allowance
Electricity Flexibility and Forecasting System (EFFS)
Start date:
Jan 2018
End date:
Nov 2021
Funding mechanism:
- NIC
Visibility Plugs and Socket
Start date:
Feb 2018
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
EZ Valve performance and material testing GIS V7-1
Start date:
Feb 2018
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
End Load Restrain Capability
Start date:
Feb 2018
End date:
Feb 2021
Funding mechanism:
- Network Innovation Allowance
Distributed Ledger Technology-enabled Distribution System Operation (Phase 1)
Start date:
Mar 2018
End date:
Mar 2020
Funding mechanism:
- Network Innovation Allowance
Autodesign: LV Connections Self-Service Tool
Start date:
Feb 2018
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance
Link Alert
Start date:
Feb 2018
End date:
Feb 2021
Funding mechanism:
- Network Innovation Allowance
Mobile Field Control
Start date:
Mar 2018
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
Holistic Fault Prediction
Start date:
Mar 2018
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Lightning Prediction
Start date:
Mar 2018
End date:
Sep 2020
Status:
Live
Funding mechanism:
- Network Innovation Allowance
Zebedee Sectionaliser Device
Start date:
Mar 2018
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance
TransPower
Start date:
Apr 2018
End date:
Jul 2022
Funding mechanism:
- Network Innovation Allowance
Pressure Control and Management
Start date:
Apr 2018
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Portable Radiometric Arc Fault Locator using battery powered field deployable equipment (RAFL2)
Start date:
Apr 2018
End date:
Jan 2022
Funding mechanism:
- Network Innovation Allowance
Investigation & Modelling of Fast Frequency Phenomena (“F2P”)
Start date:
Apr 2018
End date:
Apr 2019
Funding mechanism:
- Network Innovation Allowance

Long Term Stability Testing of Alternative Gases
Start date:
Jan 2018
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Overhead Lines (P35) 2018-2021
Start date:
Apr 2018
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Electric Road System for Dynamic Charging of Electric Vehicles
Start date:
Jan 2018
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Solar PV Monitoring Phase 3
Start date:
May 2018
End date:
May 2021
Funding mechanism:
- Network Innovation Allowance

Network Vision
Start date:
May 2018
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance
Ball Valve Replacement
Start date:
May 2018
End date:
Oct 2020
Funding mechanism:
- Network Innovation Allowance
The FMEA Studies and Risk-based Maintenance for Emerging Power Electronics Assets within GB Power Networks
Start date:
Aug 2018
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
Internal Live Service Insertion (ILSI)
Start date:
Jun 2018
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
CALISTA - Cable Asset Life by Integrating Statistical Failure Models
Start date:
Sep 2018
End date:
Jun 2022
Funding mechanism:
- Network Innovation Allowance
Line Inspections by Semi-Autonomous Systems (LISAS)
Start date:
Jun 2018
End date:
Nov 2020
Funding mechanism:
- Network Innovation Allowance
Hydrogen Grid to Vehicle (HG2V); Network purity for Transport.
Start date:
Jul 2018
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Liquids for cable sealing ends (LiCaSE)
Start date:
Jun 2018
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Electrical Characterisation of Silicone Oil (ECOSO)
Start date:
Jun 2018
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Engineered Poles Products
Start date:
Jul 2018
End date:
Jan 2021
Funding mechanism:
- Network Innovation Allowance
Resilient Homes
Start date:
Jul 2018
End date:
Jul 2021
Status:
Live
Funding mechanism:
- Network Innovation Allowance
NCEWS2 – Network Constraint Early Warning System (Phase 2)
Start date:
Oct 2018
End date:
Dec 2023
Funding mechanism:
- Network Innovation Allowance
Transformer Care
Start date:
Aug 2018
End date:
Sep 2021
Funding mechanism:
- Network Innovation Allowance
Centralock - remote access management system
Start date:
Aug 2018
End date:
Aug 2021
Funding mechanism:
- Network Innovation Allowance
Submarine Cable Sensing (SUBsense)
Start date:
Aug 2018
End date:
Mar 2024
Funding mechanism:
- Network Innovation Allowance
In Pipe NTS Liquid Monitoring Systems
Start date:
Aug 2018
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

Investigate integrity of plain dents in grade L555 pipe
Start date:
Aug 2018
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance

Pragmatic Security
Start date:
Sep 2018
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Mobile Condensate Tanks
Start date:
Sep 2018
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

IEC 61850 Cyber Resilient Electric Substation Technologies
Start date:
Nov 2018
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Storm Joint
Start date:
Oct 2018
End date:
Nov 2020
Funding mechanism:
- Network Innovation Allowance
High Frequency Earthing and its Impact on the Transmission System
Start date:
Nov 2018
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Switchgear Enhanced Rating
Start date:
Sep 2018
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance
Industrial and Commercial Carbon Capture
Start date:
Oct 2018
End date:
Feb 2021
Funding mechanism:
- Network Innovation Allowance
Interface
Start date:
Oct 2018
End date:
Oct 2022
Funding mechanism:
- Network Innovation Allowance
Blended Hydrogen and Compressed Natural Gas for Transport
Start date:
Oct 2018
End date:
Feb 2021
Funding mechanism:
- Network Innovation Allowance
Artificial Intelligence and Machine Learning
Start date:
Oct 2018
End date:
Oct 2021
Funding mechanism:
- Network Innovation Allowance
Zero Missing Phenomenon
Start date:
Oct 2018
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Kobus Gas Pipe Puller Stage 2
Start date:
Nov 2018
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
A Holistic Intelligent Control System for flexible technologies
Start date:
Dec 2018
End date:
Dec 2022
Funding mechanism:
- Network Innovation Allowance
Virtual Statcom
Start date:
Dec 2018
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance
Frequency Response Auction Trial
Start date:
Dec 2018
End date:
Jun 2021
Funding mechanism:
- Network Innovation Allowance

Overload Rotation to Increase Capacity of Transmission Boundaries
Start date:
Dec 2018
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Feasibility study to unlocking flexibility from within industrial and commercial users.
Start date:
Mar 2019
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance
HV OHL Assessment
Start date:
Jan 2019
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance
Shift
Start date:
Jan 2019
End date:
Oct 2021
Funding mechanism:
- Network Innovation Allowance
OHL (Overhead Line) Power Pointer
Start date:
Dec 2018
End date:
May 2022
Funding mechanism:
- Network Innovation Allowance
The Future of LTS
Start date:
Jan 2019
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance
Derivation of a Risk Based Approach to High Pressure Filter & Pig Trap Closure Inspection Frequencies
Start date:
Jan 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Enhancing Energy Flexibility from Wastewater Catchments through a Whole System Approach
Start date:
Mar 2019
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance

Project Zero
Start date:
Feb 2019
End date:
Jul 2020
Funding mechanism:
- Network Innovation Allowance
Informed Lightning Protection
Start date:
Mar 2019
End date:
Feb 2024
Funding mechanism:
- Network Innovation Allowance
Underground fault predictive model and earthing assessments
Start date:
Feb 2019
End date:
Aug 2021
Funding mechanism:
- Network Innovation Allowance
Reflect Uncertainties around E-Vehicle Charging to Optimize Network Forecasting
Start date:
Mar 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
HV Feeder monitoring to pre-empt faults
Start date:
Feb 2019
End date:
Mar 2023
Funding mechanism:
- Network Innovation Allowance
Short-term System Inertia Forecast
Start date:
Mar 2019
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance

RecorDER
Start date:
Feb 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance

Novel O-Ring Designs (NORD)
Start date:
Mar 2019
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Electric Vehicle Uptake Modelling (EV-Up)
Start date:
Feb 2019
End date:
Aug 2021
Funding mechanism:
- Network Innovation Allowance
System Health Map Phase 1
Start date:
Jul 2019
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
Health Index Study of Electrical Energy Storage Systems within Electricity Networks.
Start date:
Mar 2019
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance
Multi Asset Demand Execution (MADE)
Start date:
Mar 2019
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Intelligent Network meshing switch
Start date:
Apr 2019
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
Monitoring of real-time Fugitive Emissions (MORFE)
Start date:
Mar 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

Captivate – Proof of Concept
Start date:
Mar 2019
End date:
Oct 2020
Funding mechanism:
- Network Innovation Allowance

Unified Protection
Start date:
Apr 2019
End date:
Feb 2022
Funding mechanism:
- Network Innovation Allowance
Residential Response
Start date:
Apr 2019
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance

Phase Switch System
Start date:
Jun 2019
End date:
Mar 2023
Funding mechanism:
- Network Innovation Allowance
Urban Energy Club
Start date:
May 2019
End date:
Feb 2022
Funding mechanism:
- Network Innovation Allowance
Low Voltage – Underground Fault Location Technologies (LV-UFLT)
Start date:
Jun 2019
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
THOR Hammer
Start date:
Jun 2019
End date:
Dec 2022
Funding mechanism:
- Network Innovation Allowance
Long Term Asset Reliability Study for Hydrogen Blended Gas
Start date:
May 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Boston Spa Energy Efficiency Trial
Start date:
Jun 2019
End date:
Jun 2021
Status:
Live
Funding mechanism:
- Network Innovation Allowance
Improving Storm Resilience and Readiness through Data Analytics
Start date:
Jun 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Proof of concept Tarmac Reinstatement Tester
Start date:
Jun 2019
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
Novel Temporary Earthing & Bonding Solutions
Start date:
Mar 2020
End date:
Nov 2020
Funding mechanism:
- Network Innovation Allowance
Demonstration of Virtual Synchronous Machine control of a battery system
Start date:
Jun 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance

Sleeve Assessment Technology – Phase 1
Start date:
Jul 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Refase Circuit Protection
Start date:
Jun 2019
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Enabling Monitoring and Control of Underground Assets
Start date:
Jun 2019
End date:
Jul 2024
Funding mechanism:
- Network Innovation Allowance
Impact of LCTs on the design of the LV networks
Start date:
Jun 2019
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance
E Tourism
Start date:
Jul 2019
End date:
Sep 2022
Funding mechanism:
- Network Innovation Allowance
An Investigation of the Performance of Oxygen Depletion Sensors
Start date:
Jul 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
400kV Dynamic Cable Rating Retrofit Project utilising RPMA Communications Technology
Start date:
Jul 2019
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Environmental Exposure of Overhead Lines: Data Delivery for Physical Testing
Start date:
Sep 2019
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Automatic Location of Arc-faults through Remote Monitoring (ALARM)
Start date:
Sep 2019
End date:
May 2022
Funding mechanism:
- Network Innovation Allowance
Gas Quality Blending Services
Start date:
Aug 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

PCB Sniffer
Start date:
Sep 2019
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance
Harmonic Mitigation
Start date:
Sep 2019
End date:
Feb 2022
Funding mechanism:
- Network Innovation Allowance
Energy Exchange: Market-Based Curtailment Management
Start date:
Sep 2019
End date:
Aug 2022
Funding mechanism:
- Network Innovation Allowance
Testing Coordinated DSO-ESO Procurement and Dispatch
Start date:
Sep 2019
End date:
Jul 2020
Funding mechanism:
- Network Innovation Allowance

ERS Module Regulator Conversion Phase 2
Start date:
Sep 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Power Electronic Enabled Transformers (PEETs)
Start date:
Oct 2019
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Optimised Infra-Red Image Systems (OsIRIS)
Start date:
Oct 2019
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Duraseal Repair Method
Start date:
Sep 2019
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
Phasor Instream Data Processing (IDP)
Start date:
Sep 2019
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Expanding LoRa
Start date:
Sep 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Multi energy vector modelling
Start date:
Oct 2019
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Optimising Distribution of Hydrogen
Start date:
Sep 2019
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance
Technical Interfaces to Scale as a DSO
Start date:
Sep 2019
End date:
Sep 2021
Funding mechanism:
- Network Innovation Allowance
Economic Ageing of Transformers
Start date:
Oct 2019
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Wildlife Protection
Start date:
Sep 2019
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
MERLIN (Modelling the Economic Reactions Linking Individual Networks)
Start date:
Oct 2019
End date:
Oct 2021
Funding mechanism:
- Network Innovation Allowance
Study of Advanced Modelling for Network Planning Under Uncertainty
Start date:
Oct 2019
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance

Bethesda Home Hub
Start date:
Oct 2019
End date:
Jun 2022
Funding mechanism:
- Network Innovation Allowance
Satellite Infrastructure Monitoring (SIM) – Stage 1
Start date:
Oct 2019
End date:
Jul 2020
Funding mechanism:
- Network Innovation Allowance
Debris In Pipe
Start date:
Oct 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
An Electric Heat Pathway – Looking Beyond Heat Pumps
Start date:
Oct 2019
End date:
Apr 2020
Funding mechanism:
- Network Innovation Allowance
Virtual Monitoring Data (VM-Data)
Start date:
Oct 2019
End date:
Oct 2020
Funding mechanism:
- Network Innovation Allowance
Phasor Based Monitoring for HVDC Applications
Start date:
Oct 2019
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Spatial GB Clean Heat Pathway Model
Start date:
Oct 2019
End date:
Jan 2021
Funding mechanism:
- Network Innovation Allowance

IntraFlex
Start date:
Oct 2019
End date:
Nov 2021
Funding mechanism:
- Network Innovation Allowance
Hybrid-Hydrogen (HyHy)
Start date:
Nov 2019
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Zero-2050: South Wales (Whole system analysis)
Start date:
Nov 2019
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
A Transition to LVDC - Phase 2
Start date:
Nov 2019
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Applications of convex optimisation to enhance National Grid’s NOA process
Start date:
Oct 2019
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance

Future Flex
Start date:
Nov 2019
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
Combined CP and Pressure Remote Monitoring Phase II
Start date:
Nov 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

Advanced Gas Detector Implementation Trial (AGD-IT)
Start date:
Dec 2019
End date:
May 2020
Funding mechanism:
- Network Innovation Allowance
Storm Resilience
Start date:
Dec 2019
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
Presumed Open Data (POD)
Start date:
Jan 2020
End date:
Jun 2021
Funding mechanism:
- Network Innovation Allowance
Big Data Analytics for Cable Systems
Start date:
Dec 2019
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Feasibility of Compressed Dry Air 33kV Insulated Switchgear
Start date:
Dec 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Impact of System inertia on the Critical Clearance Times (CCT) on the GB Transmission Network
Start date:
Jan 2020
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Short Term Voltage Stability Monitoring Using PMU Data
Start date:
Jan 2020
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Impact of Long-duration Energy Storage Systems on GB Transmission Planning
Start date:
Dec 2019
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance

The Chatter Tool
Start date:
Dec 2019
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
TACAMA
Start date:
Dec 2019
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Sub/Near Synchronous Instability in the GB Network
Start date:
Jan 2020
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Risk mitigation of power electronics connections
Start date:
Mar 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
HyDeploy2
Start date:
Apr 2019
End date:
Mar 2024
Status:
Live
Funding mechanism:
- NIC
Electric Nation - PoweredUp
Start date:
Jan 2020
End date:
Jul 2022
Funding mechanism:
- Network Innovation Allowance
Whole System Growth Scenario Modelling Phase 2
Start date:
Jan 2020
End date:
Jun 2023
Funding mechanism:
- Network Innovation Allowance
iDentify
Start date:
Feb 2020
End date:
Mar 2024
Funding mechanism:
- Network Innovation Allowance
LTE| Connecting Futures
Start date:
Jan 2020
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Overhead Transmission (P35) and Substations (P37)
Start date:
Jan 2020
End date:
Jul 2023
Funding mechanism:
- Network Innovation Allowance
Sarco Stopper
Start date:
Jan 2020
End date:
Jan 2021
Funding mechanism:
- Network Innovation Allowance

Advanced Weather Forecasts for Dynamic Line Rating
Start date:
Jan 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Challenging Composite Insulator Design Rules (Champions)
Start date:
Jan 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Vacuum Excavation for Local Transmission System (VELTS) - Stage 2
Start date:
Nov 2019
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance
Future Power Network Simulations
Start date:
Apr 2020
End date:
Oct 2020
Funding mechanism:
- Network Innovation Allowance
Smart Hammer
Start date:
Feb 2020
End date:
Mar 2024
Funding mechanism:
- Network Innovation Allowance
Arc Aid
Start date:
Feb 2020
End date:
Jan 2023
Funding mechanism:
- Network Innovation Allowance
Net Zero South Wales – Cross Vector Scenarios
Start date:
Feb 2020
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Cold Start
Start date:
Feb 2020
End date:
Feb 2021
Funding mechanism:
- Network Innovation Allowance
Schematics – Phase 2
Start date:
Feb 2020
End date:
Oct 2020
Funding mechanism:
- Network Innovation Allowance
Overcrossing Sleeve Investigation Tool
Start date:
Feb 2020
End date:
Oct 2020
Funding mechanism:
- Network Innovation Allowance
New online tools for Assessment of Bushing Condition (Not-ABC)
Start date:
Mar 2020
End date:
Jun 2020
Funding mechanism:
- Network Innovation Allowance
Long Term Stability Testing of Alternative Gases 2: C5F10O
Start date:
Apr 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Real Time Fault Level Monitoring Stage 2
Start date:
May 2020
End date:
Mar 2024
Funding mechanism:
- Network Innovation Allowance
Novel Seal PPE - Phase 2
Start date:
Feb 2020
End date:
Jan 2021
Funding mechanism:
- Network Innovation Allowance
Mapping the Impacts and Visualization of Risks of extreme weather on system operation (MIVOR)
Start date:
Mar 2020
End date:
Jun 2021
Funding mechanism:
- Network Innovation Allowance

Pipeline Spacers
Start date:
Mar 2020
End date:
Sep 2022
Funding mechanism:
- Network Innovation Allowance
Future Fiscal Forecasting
Start date:
Mar 2020
End date:
Dec 2020
Funding mechanism:
- Network Innovation Allowance
Permanent Leak Repair Clamps Phase 2
Start date:
Mar 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Circuit See
Start date:
Feb 2020
End date:
Apr 2022
Funding mechanism:
- Network Innovation Allowance
Optimise Prime
Start date:
Jan 2019
End date:
Jan 2022
Status:
Live
Funding mechanism:
- NIC
Street Score – Customer Navigational Experience
Start date:
Mar 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Vehicle Transition - CNG
Start date:
Mar 2020
End date:
Feb 2021
Funding mechanism:
- Network Innovation Allowance
TraDER
Start date:
Mar 2020
End date:
Feb 2023
Funding mechanism:
- Network Innovation Allowance
Wake Induced Vibration Modelling
Start date:
Apr 2020
End date:
Jan 2022
Funding mechanism:
- Network Innovation Allowance
Rhino OLM
Start date:
Mar 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
LeakVision
Start date:
Mar 2020
End date:
Aug 2022
Funding mechanism:
- Network Innovation Allowance
Universal IoT Monitoring
Start date:
Mar 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Black Start from Distributed Energy Resources
Start date:
Apr 2019
End date:
Apr 2022
Status:
Live
Funding mechanism:
- NIC

Field Trials For Hydrogen Blended Gas Detection Equipment
Start date:
Mar 2020
End date:
Aug 2023
Funding mechanism:
- Network Innovation Allowance
DC Share
Start date:
Jan 2020
End date:
Apr 2022
Funding mechanism:
- NIC
All Terrain Low Ground Pressure Access Vehicle with 34m boom
Start date:
Mar 2020
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
Local Electric Vehicle Energy Loop (LEVEL)
Start date:
Apr 2020
End date:
Oct 2021
Funding mechanism:
- Network Innovation Allowance
I-Branch Seal
Start date:
Apr 2020
End date:
Sep 2020
Funding mechanism:
- Network Innovation Allowance
Take Charge
Start date:
Apr 2020
End date:
Jan 2023
Funding mechanism:
- Network Innovation Allowance
Assessing wearable technology applications for transmission operation and design
Start date:
May 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
A Substation of the Future
Start date:
May 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Evaluation of Travelling Wave based Transmission Line Protection for Low-Fault Level Networks
Start date:
Jul 2020
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Forward Resilience Measures (Stage 1)
Start date:
Jun 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
4D Heat
Start date:
May 2020
End date:
Nov 2020
Funding mechanism:
- Network Innovation Allowance

SHEDD – System HILP Event Demand Disconnection
Start date:
May 2020
End date:
May 2022
Funding mechanism:
- Network Innovation Allowance

TOTEM (Transmission Owner Tools for EMT Modelling)
Start date:
May 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Live Service Transfer
Start date:
May 2020
End date:
Aug 2020
Funding mechanism:
- Network Innovation Allowance
Cyber Security Solutions for Legacy Equipment
Start date:
Sep 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
CH4RGE – Methane Reduction from Gas Equipment
Start date:
May 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

Line Search
Start date:
May 2020
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Corrosion Modelling
Start date:
May 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

i40 Connectivity Project
Start date:
May 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

EPRG (European Pipeline Research Group) 2020
Start date:
May 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

PRCI (Pipeline Research Council International) 2020
Start date:
May 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

Stent Bag 2
Start date:
Jun 2020
End date:
Apr 2022
Funding mechanism:
- Network Innovation Allowance
Project Synthesis – Effective Regional Inertia Monitoring and Automatic Control with a Whole System Approach
Start date:
Jun 2020
End date:
Dec 2022
Funding mechanism:
- Network Innovation Allowance
DETECTS - Developing Enhanced Techniques to Evaluate Converter-dominated Transmission System Operability
Start date:
May 2020
End date:
May 2021
Funding mechanism:
- Network Innovation Allowance

Resin Mixing
Start date:
May 2020
End date:
Nov 2020
Funding mechanism:
- Network Innovation Allowance
Methane Alarms
Start date:
Jun 2020
End date:
Apr 2022
Funding mechanism:
- Network Innovation Allowance
HySCALE – Feasibility study of the use of LOHCs for bulk hydrogen storage and transport.
Start date:
Jun 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Feasibility Study on Upgrading Transmission Network Capability for Renewable Connection
Start date:
Jul 2020
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Optimal Coordination of Active Network Management Schemes and Balancing Services Market
Start date:
Jun 2020
End date:
Jun 2021
Funding mechanism:
- Network Innovation Allowance

Miles better fault location
Start date:
May 2020
End date:
May 2023
Funding mechanism:
- Network Innovation Allowance
Probabilistic planning for stability constraints
Start date:
Jun 2020
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance

HyNTS Roadmap to FutureGrid
Start date:
Jul 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

myDart Phase 2 – Digital Asset Records Tool
Start date:
Jul 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
White Van Plan
Start date:
Jul 2020
End date:
Oct 2022
Funding mechanism:
- Network Innovation Allowance
Heat Street: Local System Planning
Start date:
Jul 2020
End date:
Aug 2021
Funding mechanism:
- Network Innovation Allowance
Geopolymer Injection for Ground Stabilisation and the re-levelling of buried assets
Start date:
Jul 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

Control REACT
Start date:
Jul 2020
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance

Radio Teleprotection
Start date:
Aug 2020
End date:
Aug 2023
Funding mechanism:
- Network Innovation Allowance
Odorant Monitoring
Start date:
Aug 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
H21 - Understanding Industrial & Commercial Customers
Start date:
Aug 2020
End date:
May 2021
Funding mechanism:
- Network Innovation Allowance
H21 Occupied Trials – Phase One
Start date:
Aug 2020
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Legacy Stubs
Start date:
Aug 2020
End date:
Feb 2022
Funding mechanism:
- Network Innovation Allowance
HyCompact
Start date:
Aug 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Charge Collective
Start date:
Aug 2020
End date:
Dec 2022
Funding mechanism:
- Network Innovation Allowance
I-0331 Optimising Distribution of Hydrogen Phase 2
Start date:
Aug 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Integrated Calibration Solution
Start date:
Sep 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Skyline
Start date:
Sep 2020
End date:
Jun 2022
Funding mechanism:
- Network Innovation Allowance
3D Printing of Network Assets
Start date:
Sep 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Flexible Generation Forecasting
Start date:
Sep 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Safety & Operational Framework for the Temporary Provision of Alternative Natural Gas Systems 2 (SOFTPANG 2)
Start date:
Sep 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Network Event and Alarm Transparency (NEAT)
Start date:
Oct 2020
End date:
Jun 2023
Funding mechanism:
- Network Innovation Allowance
Inline Flow Stop - Feasibility
Start date:
Oct 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

Cleaner Engines
Start date:
Oct 2020
End date:
Mar 2023
Funding mechanism:
- Network Innovation Allowance
CommuniHeat
Start date:
Oct 2020
End date:
Dec 2022
Funding mechanism:
- Network Innovation Allowance
HyTechnical – Literature, science review and subsequent revision technical standards for hydrogen pipelines
Start date:
Jun 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
GIS temperature monitoring
Start date:
Nov 2020
End date:
Jun 2022
Funding mechanism:
- Network Innovation Allowance
Equal Electric Vehicles
Start date:
Oct 2020
End date:
Apr 2022
Funding mechanism:
- Network Innovation Allowance
Spatially Enabled Asset Management (SEAM)
Start date:
Nov 2020
End date:
Oct 2021
Funding mechanism:
- Network Innovation Allowance
I-0335 HyNet Basis of Design Project
Start date:
Oct 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
DoorStop
Start date:
Oct 2020
End date:
May 2021
Funding mechanism:
- Network Innovation Allowance
FutureLink
Start date:
Nov 2020
End date:
Aug 2024
Funding mechanism:
- Network Innovation Allowance
Socially Green
Start date:
Nov 2020
End date:
Dec 2023
Funding mechanism:
- Network Innovation Allowance
Near Real-time Data Access (NeRDA)
Start date:
Nov 2020
End date:
Mar 2024
Funding mechanism:
- Network Innovation Allowance
Valve Care Toolbox 3
Start date:
Nov 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

On-Site Non-Intrusive Polychlorinated Biphenyls (PCB) Tester
Start date:
Oct 2021
End date:
May 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Risk Assessment Methodologies for Pipelines and AGIs 2020
Start date:
Apr 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

Synaps 2 - Fault Detection, Classification & Location Solution
Start date:
Dec 2020
End date:
Mar 2024
Funding mechanism:
- Network Innovation Allowance
H21 Initial Hydrogen Supply Strategy
Start date:
Nov 2020
End date:
Sep 2021
Funding mechanism:
- Network Innovation Allowance
Envision
Start date:
Dec 2020
End date:
Feb 2023
Funding mechanism:
- Network Innovation Allowance
I-0337 HyNet Operation and Control
Start date:
Dec 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Dynamic Charging of Vehicles
Start date:
Dec 2020
End date:
Feb 2022
Funding mechanism:
- Network Innovation Allowance
Analytical Approach for Vegetation Management
Start date:
Dec 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance

Temporary Event Charging
Start date:
Dec 2020
End date:
Oct 2021
Funding mechanism:
- Network Innovation Allowance
Optimal Outage Planning System
Start date:
Dec 2020
End date:
Dec 2022
Funding mechanism:
- Network Innovation Allowance

I-0334 Hy4Transport
Start date:
Nov 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
InTEGReL: Academic review of fuel poverty, vulnerability and GB research capability
Start date:
Nov 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Low Voltage Feeder Cable Open Circuit Detection
Start date:
Dec 2020
End date:
Mar 2024
Funding mechanism:
- Network Innovation Allowance
Covid Vulnerability
Start date:
Dec 2020
End date:
Jun 2021
Funding mechanism:
- Network Innovation Allowance
Future Control Room
Start date:
Jan 2021
End date:
Apr 2022
Strategy themes:
- Data and digitalisation
Funding mechanism:
- Network Innovation Allowance
I-0339 - Technical Review - KIWA
Start date:
Dec 2020
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
Smart Cable Guard
Start date:
Feb 2021
End date:
Feb 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
H21 – Hydrogen Ready Services
Start date:
Jan 2021
End date:
Aug 2021
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- Network Innovation Allowance
Voyage
Start date:
Feb 2021
End date:
Jun 2022
Strategy themes:
- Net zero and the energy system transition
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Energy Planning Integrated with Councils
Start date:
Feb 2021
End date:
Dec 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- Network Innovation Allowance
Peak Heat
Start date:
Feb 2021
End date:
May 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- Network Innovation Allowance
H21 - Hydrogen Ready Components
Start date:
Jan 2021
End date:
Jan 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- Network Innovation Allowance
I-0342 Cumbrian Hydrogen vision and pathway – Phase 1 Feasibility
Start date:
Jan 2021
End date:
Jul 2021
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- Network Innovation Allowance
Landslide Protection Asset
Start date:
Mar 2021
End date:
Jun 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Enable
Start date:
Mar 2021
End date:
Mar 2022
Strategy themes:
- Consumer vulnerability
- Net zero and the energy system transition
Funding mechanism:
- Network Innovation Allowance
Re-Heat: Enabling Renewable Heat
Start date:
Jun 2021
End date:
Jun 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
H2GO - Domestic Hydrogen Detector
Start date:
Mar 2021
End date:
Mar 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- Network Innovation Allowance
TEENEE
Start date:
Mar 2021
End date:
Mar 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Printable Pressure Sensors
Start date:
Sep 2019
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Safe Operational Framework for the Temporary Provision of Alternative Natural Gas Systems 3 (SOFTPANG 3)
Start date:
Mar 2021
End date:
Mar 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
DBS:Test, Review, Recommend
Start date:
Mar 2021
End date:
Mar 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Live & Dead Check Analyser
Start date:
Oct 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Hydrogen Storage for Zero Carbon Fleet Transport
Start date:
May 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Health and Safety Monitor – Phase Two
Start date:
Dec 2019
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
ServiSWAP
Start date:
Jun 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Gas Venting Research
Start date:
Aug 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Underground Transmission (P36+ P34 part) 2018 - 2021
Start date:
Jan 2018
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
EPRI Research Collaboration on Substations (P37) 2017 - 2020
Start date:
Jan 2017
End date:
Apr 2021
Funding mechanism:
- Network Innovation Allowance
GRAID ART
Start date:
Mar 2019
End date:
Aug 2021
Funding mechanism:
- Network Innovation Allowance

Project Conan
Start date:
Mar 2021
End date:
Jun 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Polesight
Start date:
Mar 2021
End date:
Mar 2023
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Bonded Saddle V2
Start date:
Mar 2021
End date:
Mar 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Ramp Up
Start date:
Dec 2019
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Tools Of Engagement
Start date:
Mar 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Project MOLE (Minimising Our Launch Excavations)
Start date:
Mar 2021
End date:
Mar 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Zero emission odorant pumping system
Start date:
Mar 2021
End date:
Mar 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Mobile robot for automated identification of failures in HV substations
Start date:
Oct 2016
End date:
Jul 2021
Funding mechanism:
- Network Innovation Allowance
Optinet
Start date:
Oct 2018
End date:
Mar 2024
Status:
Live
Funding mechanism:
- Network Innovation Allowance
I-0343 Calorific value and gas quality impact assessment of hydrogen and biomethane blends
Start date:
Mar 2021
End date:
Jul 2021
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- Network Innovation Allowance
Large Diameter PE Pipe Cutter
Start date:
Mar 2021
End date:
Mar 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Digitisation of SCO Database
Start date:
Jan 2021
End date:
Mar 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Slow Strain Rate Test and Hydrogen Permeation Correlation
Start date:
Mar 2021
End date:
Sep 2021
Strategy themes:
- Whole energy systems
Funding mechanism:
- Network Innovation Allowance
The Future of LTS: Evaluation of Vintage Pipeline Materials in Hydrogen Environments
Start date:
Sep 2020
End date:
Sep 2021
Funding mechanism:
- Network Innovation Allowance
Easy Assist ECV Phase 2
Start date:
Sep 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
EDGE-FCLi (Embedded Distributed Generation Electronic Fault Current Limiting interrupter)
Start date:
Sep 2018
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Transmission OHL Crossing Protection Stage 1
Start date:
Jul 2020
End date:
Mar 2022
Funding mechanism:
- Network Innovation Allowance
Energy Centre
Start date:
Mar 2020
End date:
Feb 2022
Funding mechanism:
- Network Innovation Allowance
Resilience as a Service
Start date:
Jan 2020
End date:
Sep 2024
Status:
Live
Funding mechanism:
- NIC
Flexible Tower Block
Start date:
Feb 2021
End date:
May 2022
Strategy themes:
- Flexibility and market evolution
Funding mechanism:
- Network Innovation Allowance
ESeal 2 Extension
Start date:
Jan 2021
End date:
Mar 2022
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Hydrogen Gas Detection Instrument
Start date:
Oct 2019
End date:
Sep 2021
Funding mechanism:
- Network Innovation Allowance
Hydrogen Excess Flow Valve
Start date:
Aug 2019
End date:
Aug 2021
Funding mechanism:
- Network Innovation Allowance
ServiBoost Phase 3
Start date:
Mar 2020
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Remote Live Mains Insertion (RLMI)
Start date:
Apr 2019
End date:
Mar 2021
Funding mechanism:
- Network Innovation Allowance
Decision Tool
Start date:
Apr 2020
End date:
Jun 2021
Funding mechanism:
- Network Innovation Allowance
Composite repairs for through wall defects on metal pipes
Start date:
Apr 2019
End date:
Sep 2021
Funding mechanism:
- Network Innovation Allowance
SAFE-HD (Spatial Analysis of Future Electric Heat Demand)
Start date:
Aug 2019
End date:
Dec 2021
Funding mechanism:
- Network Innovation Allowance
I-0321 Transport Pathways
Start date:
Jun 2020
End date:
Feb 2021
Funding mechanism:
- Network Innovation Allowance
Connecting with Customers – Intelligent Virtual Surveying Tool for Vulnerable Customers
Start date:
Mar 2021
End date:
Oct 2021
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- Network Innovation Allowance
Intelligent Governor Surveying and Monitoring
Start date:
Mar 2021
End date:
Feb 2022
Funding mechanism:
- Network Innovation Allowance
Smart Heat
Start date:
Apr 2021
End date:
Apr 2022
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-1
On-line assessment of neutral conductor integrity
Start date:
Apr 2021
End date:
Dec 2023
Status:
Live
Strategy themes:
- Optimised assets and practices
Funding mechanism:
- NIA RIIO-1
CrowdFlex
Start date:
Apr 2021
End date:
Mar 2022
Strategy themes:
- Whole energy systems
Funding mechanism:
- NIA RIIO-2

Effect of 100% hydrogen on cast iron assets
Start date:
May 2023
End date:
Dec 2024
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Graphene Enhanced Maturity Site Trials and Optimal Network Evaluation (GEMSTONE)
Start date:
Sep 2024
End date:
Feb 2025
Strategy themes:
- Net zero and the energy system transition
Funding mechanism:
- NIA RIIO-2
Filters
Research Areas
Strategy Themes
Network
Funding Mechanism
Technology
Start/End Date
Filter by: