Search results

You searched for

2962 results found

I-LAD (Innovating Losses Analysis and Detection) Discovery R4

Start date: Feb 2025
End date: May 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Discovery - Round 4
Scottish and Southern Electricity Networks Distribution

FastTrack Discovery R4

Start date: Feb 2025
End date: May 2025
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Discovery - Round 4
Scottish and Southern Electricity Networks Distribution

RIDES (Rural Industrial DEcarbonisation Support.) Discovery R4

Start date: Feb 2025
End date: May 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 4
Scottish and Southern Electricity Networks Distribution

FLEX-STORE: FLEXible STORE of electrified thermal energy

Start date: Jan 2025
End date: Jun 2025
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Discovery - Round 4
Northern Powergrid

3DAR (Dynamic, Data Driven Asset Rating) Discovery R4

Start date: Feb 2025
End date: May 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 4
Scottish and Southern Electricity Networks Distribution

Phased Switch System

Start date: Sep 2024
End date: Jan 2028
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Beta - Round 2
National Grid Electricity Distribution

PRIDE-Beta

Start date: Nov 2024
End date: Oct 2027
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Beta - Round 2
National Grid Electricity Distribution

Climate Resilience Decision Optimiser (CREDO+)

Start date: Sep 2024
End date: Mar 2028
Status:
Live
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • SIF Beta - Round 2
UK Power Networks

MultiResilience Project – Enhancing Energy Network Resilience

Start date: Dec 2024
End date: Sep 2028
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Beta - Round 2
Northern Powergrid

SIF Black Start Demonstration from Offshore Wind (SIF BLADE)

Start date: Sep 2024
End date: Oct 2027
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Beta - Round 2
SP Energy Networks Transmission

Flexible Railway Energy Hubs

Start date: Dec 2024
End date: Dec 2029
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Beta - Round 2
SP Energy Networks Transmission

Powering Wales Renewably (PWR) - Beta

Start date: Jan 2025
End date: Jan 2029
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Beta - Round 2
National Energy System Operator

SHIELD - Smart Heat and Intelligent Energy in Low-Income Districts

Start date: Dec 2024
End date: Jan 2029
Status:
Live
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • SIF Beta - Round 2
UK Power Networks

Intelligent Gas Grid - Beta

Start date: Aug 2023
End date: Aug 2026
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Beta - Round 1
SGN

Velocity design with hydrogen - Beta

Start date: Aug 2023
End date: Feb 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Beta - Round 1
SGN

HyNTS FutureGrid Compression

Start date: Sep 2023
End date: Jan 2027
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Beta - Round 1
National Gas Transmission PLC

HyNTS FutureGrid Deblending

Start date: Sep 2023
End date: Jun 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Beta - Round 1
National Gas Transmission PLC

Network-DC Circuit Breakers

Start date: Sep 2023
End date: Jun 2027
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Beta - Round 1
Scottish and Southern Electricity Networks Transmission

Predict4Resilience (P4R) - Beta

Start date: Aug 2023
End date: Jan 2027
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Beta - Round 1
SP Energy Networks Transmission

Digital Platform for Leakage Analytics – Beta Phase

Start date: Sep 2023
End date: Mar 2026
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Beta - Round 1
Cadent

Crowdflex - Beta

Start date: Dec 2023
End date: Jan 2026
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Beta - Round 1
National Energy System Operator

Artificial Forecasting

Start date: Feb 2025
End date: Feb 2027
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Beta - Round 1
Northern Powergrid

SIF R3 Alpha: SeaChange

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 3
Scottish and Southern Electricity Networks Distribution

Electric Thames

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Alpha - Round 3
UK Power Networks

Flex Direct

Start date: Nov 2024
End date: May 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • SIF Alpha - Round 3
UK Power Networks

HeatNet

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Alpha - Round 3
UK Power Networks

Road to Power (Alpha)

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Alpha - Round 3
National Grid Electricity Distribution

HyScale LOHC Phase 2b (Alpha)

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Alpha - Round 3
SGN

Fuel Cell Renewable Energy Equity (FREE) Round 3 Alpha Phase

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 3
Northern Powergrid

Cross Vector Hub (R3A)

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Alpha - Round 3
Northern Powergrid

Fractal Flow Alpha R3

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 3
Northern Powergrid

Nature4Network - Alpha R3

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 3
Scottish and Southern Electricity Networks Distribution

Wayl-Ease

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 3
UK Power Networks

CoolDown - SIF Alpha

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Alpha - Round 3
Electricity North West

Network Security in a Quantum Future - Alpha

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 3
National Energy System Operator

REVISE – Revisiting and Evaluating Environmental Inputs on Line Ratings

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Alpha - Round 3
Scottish and Southern Electricity Networks Transmission

SYSMET – SYstem Strength Measurement and EvaluaTion

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 3
Scottish and Southern Electricity Networks Transmission

LV Optimiser

Start date: Oct 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 3
SP Energy Networks Transmission

Equiflex - Alpha

Start date: Dec 2024
End date: Jun 2025
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Alpha - Round 3
SP Energy Networks Transmission

Geogrid

Start date: Jan 2025
End date: Jul 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 3
Northern Powergrid

Look NortH2

Start date: Nov 2024
End date: May 2025
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Alpha - Round 3
National Grid Electricity Transmission

Constellation

Start date: May 2021
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIC
UK Power Networks

Protection Solutions to perform for Lower Levels of Fault Current on AC Networks (PSL-FC)

Start date: Jul 2021
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

QUEST

Start date: Jun 2021
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Electricity North West

DynaLoad – Dynamic loading of transformer insulation

Start date: Aug 2021
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Retrofit Insulated Cross Arms (RICA)

Start date: Dec 2021
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIC
National Grid Electricity Transmission

Cyber Security for Active and Flexible Energy Networks (Cyber-SAFEN)

Start date: May 2022
End date: Apr 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Risk Assessment Methodologies for Pipelines and AGIs 2021 - 2026

Start date: Apr 2021
End date: Mar 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

PRCI (Pipeline Research Council International) 2021 - 2026

Start date: Apr 2021
End date: Mar 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

EPRG (European Pipeline Research Group) 2021 - 2026

Start date: Apr 2021
End date: Mar 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Right to Heat

Start date: Feb 2022
End date: Apr 2025
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Customer Energy Village: Project 1: Energy Efficiency

Start date: Nov 2021
End date: Apr 2025
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Non-invasive In-situ Monitoring and Interpretation of SF6 Alternatives in GIS Equipment

Start date: Feb 2022
End date: Jan 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Net Zero Transport - Discovery Continuity

Start date: Feb 2022
End date: Jul 2025
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Data and Digitalisation - Discovery Continuity

Start date: Feb 2022
End date: Feb 2027
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

EPRI Substations (P37) and Analytics (P34) 2021-2025

Start date: Dec 2021
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

EPRI Research Collaboration on Underground Transmission (P36) 2021-2025

Start date: Dec 2021
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

EPRI Research Collaboration on Electric & Magnetic Fields Health & Safety (P60) 2021-25

Start date: Dec 2021
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Pollywood II

Start date: Apr 2022
End date: Mar 2025
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Northern Powergrid

Collaborative Local Energy Optimisation (CLEO)

Start date: Mar 2022
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

A Holistic Intelligent Control System for flexible technologies (T2)

Start date: Jan 2022
End date: Aug 2026
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Transmission

Transmission OHL Crossing Protection Stage 1 (T2)

Start date: Apr 2022
End date: Oct 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Transmission

Project Conan (T2)

Start date: Apr 2022
End date: Nov 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Transmission

Condition Assessment of SF6 Alternatives (CASA)

Start date: May 2022
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Landslide Protection Asset (T2)

Start date: Jan 2022
End date: May 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Transmission

Co-Simulation

Start date: Jul 2023
End date: Jun 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Aerial E-field Inspection System for Live Overhead Transmission Assets

Start date: Jun 2022
End date: May 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

BiTraDER

Start date: May 2022
End date: Jul 2026
Status:
Live
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • NIC
Electricity North West

Equitable Novel Flexibility Exchange (EQUINOX)

Start date: Mar 2022
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIC
National Grid Electricity Distribution

HyNTS Defect Fatigue Behaviour

Start date: Sep 2022
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Identification and quantification of C4F7N gas arcing by-products and their implication for GIS operation

Start date: Nov 2022
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

OHL Foundation Uplift

Start date: Dec 2022
End date: May 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Voltage Interaction and Thermal Dynamics of Tertiary Connection

Start date: Apr 2023
End date: Jul 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Innovative Monitoring of GIS Cable Terminations

Start date: Mar 2023
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Transmission

Transformer Research Consortium – Phase 5: Future-proof Transformers in a Digital Twinning and Net-Zero World

Start date: Nov 2023
End date: Oct 2027
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Transmission

DELIVER: Digital-Twin Enabled Innovation for Energy Network Restoration

Start date: Jun 2023
End date: Oct 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

LV De Mesh

Start date: Apr 2023
End date: Mar 2025
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Grid forming modelling and stability

Start date: Apr 2023
End date: Apr 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Silicone Oil Markers Investigation (SOMI)

Start date: Jul 2023
End date: Jan 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Low to no power heat alternatives

Start date: May 2023
End date: May 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Optimum Wide Area Power Flow Control Solutions

Start date: Jun 2023
End date: Oct 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

T&D Operations Control Centre - Electricity System Restoration Service Simulator/HiL

Start date: Aug 2023
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Transmission

Wet Weather Data for OHL Noise Predictions

Start date: Jul 2023
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

HyNTS 100% H2 Metering System

Start date: Jul 2023
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Blending Infrastructure for the NTS

Start date: Jul 2023
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Characterisation & Optimisation of Battery Banks in Substations (COBBS)

Start date: Jul 2023
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Flex Heat Networks

Start date: Jul 2023
End date: Aug 2025
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

Analysis of the Thermal Influence of Cable Surroundings (AnTICs)

Start date: Sep 2023
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Hydrogen Repurposing Process for the NTS

Start date: Jul 2023
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Improving the determination of safety and induced effects in earthing systems

Start date: Sep 2023
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Use of Innovative Materials and Construction Techniques in the Substation Environment to Accelerate Transition to Net-Zero

Start date: Sep 2023
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Pollution Monitoring

Start date: Jul 2023
End date: Mar 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

ExtenDER

Start date: Aug 2023
End date: Dec 2025
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

Low Power Heat

Start date: Aug 2023
End date: May 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Cadent

Composite membranes for H2 purification

Start date: Aug 2023
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Near Real-time Data Access 2 (NeRDA 2)

Start date: Aug 2023
End date: Feb 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

VoltXpanse: Ultra high voltage onshore energy highway

Start date: Oct 2023
End date: Feb 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

CrystalClear - Lifecycle Analysis of SF6 Alternative Technologies and Crystal Formation Impacts

Start date: Sep 2023
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Surge Arrestors Health Assessment by Monitoring Partial Discharge (SAHARA)

Start date: Sep 2023
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Practical Transition into wider EMT GB Modelling

Start date: Jul 2023
End date: Mar 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Cyber Risk Impact Assessment (Cyber-RIAST)

Start date: May 2024
End date: Oct 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Sprayed Metal for Effecting Leaking Transformer Repairs (SMELTeR)

Start date: Oct 2023
End date: Feb 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Cable Oil DEcontamination by BaCteria (CODEC)

Start date: Sep 2023
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

HyNTS Pipeline Dataset - Database & Automated Assessment

Start date: Sep 2023
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Headroom – Whole System Thinking

Start date: Sep 2023
End date: May 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Distribution

Spotlight

Start date: Oct 2023
End date: Nov 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

Low Voltage Power Quality (LVPQ)

Start date: Oct 2023
End date: May 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

Regional Energy System Optimisation Planning (RESOP)

Start date: Oct 2023
End date: Oct 2025
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

Homeshield

Start date: Oct 2023
End date: Aug 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Cadent

Interaction of Megawatt e-Trucks with Transmission System (I-MeTTS)

Start date: Nov 2023
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Visual Inspection and Condition Assessment Platform for OHL Steelwork 2 (VICAP 2)

Start date: Nov 2023
End date: Apr 2025
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Condition Assessment of Long Interconnected Cable Systems (CALICS)

Start date: Dec 2023
End date: Apr 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Enhanced RMS (e-RMS) models for stability assurance

Start date: Oct 2023
End date: Jul 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Asset Design for a Hydrogen Network

Start date: Nov 2023
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

SMARTer selection of Automatic Sectionaliser links

Start date: Dec 2023
End date: Jun 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Domestic Hydrogen Safety Controls (HyBreak)

Start date: Dec 2023
End date: Oct 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Hydrogen Impact on NTS Valves & Maintenance

Start date: Dec 2023
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Detailed Analysis of Transformer Ageing Mechanisms for Intelligent Estimation of Reliability - DATAMInER

Start date: Jan 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Storm Triage

Start date: Dec 2023
End date: Mar 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
Northern Powergrid

Trading Connections: Exploring a novel approach to connections queues

Start date: Feb 2024
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

Optimise Fault Infeed

Start date: Mar 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

SF6 Retro-Fill

Start date: Jul 2024
End date: Dec 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Development of Microgrids

Start date: Feb 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

220kV Single Circuit Low Profile Design

Start date: Mar 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Understanding the impact of Electromagnetic Fields from Interconnectors (BLUEFIN)

Start date: Mar 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Knowledge Elicitation of Risks to Assets Under LightNing Impulse Conditions (KERAUnIC)

Start date: Mar 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Anticipating Gas Insulation Leaks from Electrical assets – AGILE

Start date: Mar 2024
End date: Apr 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Battery to Bypass Constraints for Smart Local Energy (BBC)

Start date: Feb 2024
End date: Jun 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Robot, AI and Drone Enhanced Detection of Discharge (RAIDEDD)

Start date: Apr 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Proof of Concept of Digitised Condition Monitoring

Start date: Mar 2024
End date: Aug 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Interconnected HV secondary substation battery monitor

Start date: Mar 2024
End date: Jun 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Electricity Transmission Heat Effects, Resilience Measures to Manage Asset Lifecycles (THERMAL)

Start date: Mar 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

HV Pinpoint

Start date: Mar 2024
End date: Oct 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Distribution

HOMEflex (Household or Microbusiness Energy Flexibility) Compliance

Start date: Mar 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

Active Fault Level Management (AFLM) ED-2

Start date: Mar 2024
End date: Jun 2025
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Real Time Fault Level Monitoring Stage 2 (ED-2)

Start date: Mar 2024
End date: Jun 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Environmentally Acceptable Wood Pole Pre-treatment Alternatives to Creosote (APPEAL) (ED-2)

Start date: Apr 2024
End date: Jun 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Purging approach for the NTS

Start date: Apr 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

X-FacTOR Stage 2

Start date: Jan 2025
End date: Mar 2026
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

LV De Mesh

Start date: Apr 2024
End date: Dec 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

HyNTS Operational Methodologies - Phase 1

Start date: Apr 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Switchgear Requirements for Future Networks (ED-2)

Start date: Apr 2024
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Community DSO

Start date: Apr 2024
End date: Apr 2028
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIC
Northern Powergrid

Hydrogen Environment Testing of Girth Welds

Start date: Apr 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

TOTEM (Transmission Owner Tools for EMT Modelling) 2

Start date: May 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

LCT Harmonic Limits

Start date: May 2024
End date: May 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Distribution

Innovation Highway

Start date: May 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

PSR Resilience System (ED-2)

Start date: Apr 2024
End date: Jun 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Compact Substation (CoSub)

Start date: May 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Tunnel power cables earthing, safety and protection under electromagnetic transient voltages and currents (TunCab)

Start date: May 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

intercompatible CAble REpair (iCARE)

Start date: Apr 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

HyNTS Weld T-Sections & Fittings

Start date: May 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Causal Analysis of Balancing Costs

Start date: Apr 2024
End date: Oct 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Re-Heat: Enabling Renewable Heat (ED-2)

Start date: May 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Hydrogen Blending: National Safety Evidence Review

Start date: May 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Non-Intrusive Foundation Testing

Start date: Jun 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

V2G Dynamic Headroom Control

Start date: Jul 2024
End date: Jan 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Distribution

Alternative Jointing 2

Start date: Jul 2024
End date: Jun 2028
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

Low Power Hot Water Phase II

Start date: Jul 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Cadent

BISEP Live trial with LTS Futures (Phase 2)

Start date: Jun 2024
End date: Jul 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

International Evidence Gathering

Start date: Jun 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Impact of Hydrogen on Gas Cleaning Assets

Start date: Jul 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Oscillation and regional RoCoF monitoring

Start date: Feb 2024
End date: Feb 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

The Implication for the ESO of 24/7 Carbon Free Energy Trading

Start date: May 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

High Security Control and Protection System

Start date: Jul 2024
End date: Jan 2026
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Hydrogen & Carbon Ready Electrical and Instrumentation Assets

Start date: Jul 2024
End date: Jul 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Investigating Coastal and Estuarine Climate Risks on Electricity Asset Management (ICECREAM)

Start date: Jul 2024
End date: Jan 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Use Case & Market Development of Superconducting Technologies

Start date: Aug 2024
End date: May 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Sustainable Drainage Systems (SuDS) for Hydrocarbons

Start date: Sep 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

EcoBuild 3D: Sustainable Substation Foundations

Start date: Sep 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Digital whole life carbon assessment (DgWLCA)

Start date: Aug 2024
End date: Aug 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Low Voltage – Active power Control Transformer (LV-ACT)

Start date: Aug 2024
End date: Oct 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Distribution

Year Ahead Outage Optimiser (YAhOO)

Start date: Sep 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Mass mobility data for demand forecasting

Start date: Jul 2024
End date: Jul 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Construction Planning Assumptions Methodology Review

Start date: Mar 2024
End date: Jun 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Fatigue of pipework at compressor sites

Start date: Aug 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

NextGen Electrolysis – Producing Green Hydrogen from Contaminated Water

Start date: Aug 2024
End date: Jul 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Demand Diversification Service for LMAs Phase 2 – Commercial Trials

Start date: Sep 2024
End date: Aug 2025
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

Virtual Energy System Data Sharing Infrastructure (DSI) Pilot

Start date: Sep 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

OptiFLOW

Start date: Sep 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

ALCHEM - (Advanced Low Carbon Hydrogen and Energy Management)

Start date: Sep 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Neural BB

Start date: Jun 2024
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Understanding Future Energy Loads from Data Centres

Start date: Sep 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Internal Sharp Defect Burst Testing in Hydrogen

Start date: Sep 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

SCADA Solutions for Hydrogen Networks (100% & Blends)

Start date: Sep 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Blue Light

Start date: Sep 2024
End date: Feb 2026
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

HyNTS Variable Gas Blend Measurement System Development - Phase 2

Start date: Oct 2024
End date: Feb 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Systems Thinking Approach to Innovation Management

Start date: Jul 2024
End date: Jul 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Interventions for Hydrogen by Asset Group Phase 3

Start date: Sep 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Impact of Hydrogen on NTS Polymer/ Elastomer Materials – Phase 2

Start date: Oct 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Net Zero Service Termination 2 Project

Start date: Oct 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

LCT Connections Readiness Indicator

Start date: Oct 2024
End date: Apr 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

Consumer Building Blocks Phase 2

Start date: Sep 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Thermal Analysis and Consequences of Thermosyphon Installations on Cable (TACTICS)

Start date: Nov 2024
End date: May 2027
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

RTSM - Phase 1 - Methodology Development

Start date: Sep 2024
End date: May 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

AImee

Start date: Nov 2024
End date: Nov 2026
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

Electrification of the residential heat sector: Spatial and temporal analysis of electricity demand and flexibility

Start date: Jun 2024
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Consumer Building Blocks Phase 2

Start date: Sep 2024
End date: May 2025
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

AI for Visibility and Forecasting of Renewable Generation

Start date: Oct 2024
End date: Feb 2026
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

Regional Dynamic Reserve Setting

Start date: Sep 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Grid Connection Simulator tool (GridConnectX)

Start date: Oct 2024
End date: Apr 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Hydrogen Blending Implementation Plan

Start date: Oct 2024
End date: Oct 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Cadent

Smart Street Rural

Start date: Nov 2024
End date: Aug 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Electricity North West

Electric Drive Opportunities for Hydrogen Compression

Start date: Nov 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

ATEX Mechanical Ignition Risks

Start date: Nov 2024
End date: May 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Supporting Warm Spaces

Start date: Sep 2024
End date: Jun 2026
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Northern Powergrid

Resilient Customer Response NIA

Start date: Nov 2024
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Powergrid

Lined Rock Caverns for Flexible Hydrogen Storage

Start date: Oct 2024
End date: Jun 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Strategic Case for Tidal Range

Start date: Sep 2024
End date: May 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Power System Oscillation Characterisation using Wavelets and Trilateration

Start date: May 2024
End date: Nov 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

intercompatible CAble REpair (iCARE) 2

Start date: Jan 2025
End date: Jan 2027
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Multi-Gas Detection: Phase 2

Start date: Oct 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Earth Friendly Concrete Trials – Tunnel Linings

Start date: Jan 2025
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Delta Detect

Start date: Nov 2024
End date: Jun 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Electricity North West

Gas Inhibitors for Hydrogen Pipelines

Start date: Dec 2024
End date: Jun 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Lessons Learnt: Phase Two

Start date: Nov 2024
End date: Aug 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

NTS Hydrogen Blending Management Approach

Start date: Nov 2024
End date: Jun 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Assessment of the MITS planning backgrounds

Start date: Oct 2024
End date: Oct 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Project GaIN

Start date: Nov 2024
End date: Apr 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

GERG HYdrogen Service Tightness Criteria

Start date: Nov 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Visual Inspection and Condition Assessment Platform (VICAP3) - Bar by Bar

Start date: Dec 2024
End date: Mar 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

SHINE Non-Electric Boiler

Start date: Nov 2024
End date: Jul 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Cadent

Pole Mounted Switchgear

Start date: Dec 2024
End date: Aug 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Hydrogen Storage in Aquifers

Start date: Dec 2024
End date: May 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Fibre Health Monitoring Phase 2

Start date: Jan 2025
End date: Aug 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

LV Predict II

Start date: May 2024
End date: Dec 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Electricity North West

Safety Assessment of a Non-Distributed Gas GB Energy System and Usage

Start date: Nov 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Accessible CO alarm (Phase 1)

Start date: Jan 2025
End date: Nov 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
SGN

AssetCool

Start date: May 2025
End date: May 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

BRIDGES - Building a Resilient and Intelligent Dynamic Grid Enhancement System

Start date: Mar 2025
End date: Sep 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Keeping Comms Open

Start date: Jan 2025
End date: Dec 2027
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

AQUILA LITE

Start date: Dec 2024
End date: Aug 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Intelligent Connections Explorer (ICE)

Start date: Jan 2025
End date: Sep 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Transmission

GFM Interaction

Start date: Jan 2025
End date: Jun 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Power Wheels

Start date: Feb 2025
End date: Jul 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Northern Powergrid

Framework for Risk Analysis and Modelling of Events (FRAME I)

Start date: Jan 2025
End date: Jun 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

On Boundary Enhanced LCT Integrating Service Cabinet (OBELISC)

Start date: Jan 2025
End date: Jun 2027
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Distribution

Extreme Weather and Climate Modelling (Dunkelflaute)

Start date: Jul 2024
End date: Dec 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

SETTLE

Start date: Jan 2025
End date: Dec 2027
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Situational Awareness

Start date: Dec 2024
End date: Sep 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Rapid Evaluation Areal Connection Tool (REACT)

Start date: Jan 2025
End date: Dec 2025
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Hydrogen Plant Dynamic Models

Start date: Dec 2024
End date: Dec 2026
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

AIDPS: Assessing the Impacts of DC Components from Power Electronic Devices and Geomagnetically Induced Currents

Start date: Apr 2025
End date: Feb 2027
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

CommsConnect

Start date: Jan 2025
End date: Mar 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

Virtual Energy System Data Sharing Infrastructure (DSI) Pilot - SSEN-T Component

Start date: Jan 2025
End date: May 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Dynamic Pricing

Start date: Feb 2025
End date: Mar 2026
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
Northern Powergrid

Alternative approaches to the ORPS methodology

Start date: Jan 2025
End date: Jun 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Volta: Real Time Prediction

Start date: Jan 2025
End date: Jan 2026
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Assessment of Alternative Approaches to setting NTCs

Start date: Jan 2025
End date: Jun 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Future Operator Console: Optimised Visualisations

Start date: Sep 2024
End date: Sep 2026
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

LV Futures

Start date: Feb 2025
End date: Aug 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Electricity North West

Data-Driven Oscillation Tracing

Start date: Apr 2024
End date: Apr 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

System Short Circuit Tests

Start date: Feb 2025
End date: Mar 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Volta – Qualitative Benchmarking and Impact Analysis for Future Dispatching Tools and Capabilities

Start date: Mar 2025
End date: Sep 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Impact of New Technology HGVs

Start date: Feb 2025
End date: Nov 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Overhead Line Wind Speed Monitoring

Start date: Mar 2025
End date: Aug 2026
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Track to Zero

Start date: Mar 2024
End date: Mar 2025
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Environmentally Acceptable Wood Pole Pre-treatment Alternatives to Creosote (APPEAL)

Start date: Mar 2016
End date: May 2025
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Customer Safeguarding Virtual Training Platform

Start date: Jun 2023
End date: Apr 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Cadent

Predictive Safety Interventions - Beta

Start date: Aug 2023
End date: Feb 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Beta - Round 1
SGN

INCENTIVE - Innovative Control and Energy Storage for Ancillary Services in Offshore Wind

Start date: Jul 2023
End date: Oct 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Beta - Round 1
Scottish and Southern Electricity Networks Transmission

Network-DC Circuit Breakers

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Alpha - Round 1
Scottish and Southern Electricity Networks Transmission

INCENTIVE – Innovative control and energy storage for ancillary services in offshore wind

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Alpha - Round 1
Scottish and Southern Electricity Networks Transmission

HyNTS Deblending for Transport Applications

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 1
National Gas Transmission PLC

Gas System of the Future Digital Twin

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 1
SGN

Predictive Safety Interventions - Alpha

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 1
SGN

Intelligent Gas Grid - Alpha

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 1
SGN

Velocity Design with Hydrogen – Alpha

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 1
SGN

HyNTS Compression

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Alpha - Round 1
National Gas Transmission PLC

HyNTS Pipeline Dataset

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 1
National Gas Transmission PLC

HyNTS Protection

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 1
National Gas Transmission PLC

Crowdflex: Alpha

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Alpha - Round 1
National Energy System Operator

Digital Platform for Leakage Analytics – Alpha Round 1

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 1
Cadent

Thermal Imagery Analysis

Start date: Nov 2022
End date: May 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 1
Northern Gas Networks

A Holistic Hydrogen Approach to Heavy Duty Transport (H2H) - Alpha

Start date: Aug 2022
End date: Feb 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 1
SP Energy Networks Distribution

Predict4Resilience (P4R) - Alpha

Start date: Aug 2022
End date: Feb 2023
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 1
SP Energy Networks Distribution

Heat Balance - Alpha

Start date: Aug 2022
End date: Feb 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 1
SP Energy Networks Distribution

Eye in the Sky – Utilising satellite data to improve grid resilience

Start date: Aug 2022
End date: Feb 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 1
National Grid Electricity Transmission

SCADENT - SuperConductor Applications for Dense Energy Transmission

Start date: Aug 2022
End date: Feb 2023
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Alpha - Round 1
National Grid Electricity Transmission

Local Energy Oxfordshire - Neighbourhoods, (LEO-N); Alpha R2

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
Scottish and Southern Electricity Networks Distribution

Planning Regional Infrastructure in a Digital Environment (PRIDE)

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 2
National Grid Electricity Distribution

SIF Black Start Demonstrator from offshore wind (SIF BLADE)

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
SP Energy Networks Transmission

RetroMeter Alpha

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Alpha - Round 2
Electricity North West

NIMBUS

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Alpha - Round 2
Scottish and Southern Electricity Networks Transmission

INSIGHT - Innovative Network Status Intelligence Gathered by Holistic use of Telemetry

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
Scottish and Southern Electricity Networks Transmission

Net Zero Terrace Alpha

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
Electricity North West

REACT – Rapid Evaluation Areal Connection Tool

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
Scottish and Southern Electricity Networks Transmission

Scenarios for Extreme Events - Alpha

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
National Energy System Operator

Powering Wales Renewably - Alpha

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 2
National Energy System Operator

Digital Inspector Alpha R2

Start date: Sep 2023
End date: Mar 2024
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 2
Cadent

D-Suite

Start date: Jan 2024
End date: Jul 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
SP Energy Networks Distribution

NextGen Electrolysis - Wastewater to Green Hydrogen

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
Wales & West Utilities

SF6 Whole Life Strategy

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
National Grid Electricity Transmission

Diversified Flexible Queue Management

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Alpha - Round 2
Northern Powergrid

HyNTS Hybrid Storage

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
National Gas Transmission PLC

VIVID - Vulnerability Identification Via Informative Data (Alpha R2)

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • SIF Alpha - Round 2
Scottish and Southern Electricity Networks Distribution

Artificial Forecasting

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Alpha - Round 2
Northern Powergrid

HyNTS Waste Heat Recovery for Electrolysis

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
National Gas Transmission PLC

Inform

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
Northern Powergrid

Whole Energy System Resilience Vulnerability Assessment (WELLNESS)

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Alpha - Round 2
National Grid Electricity Transmission

HyCoRe (Alpha)

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
Northern Gas Networks

Guidelight

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

CREDO+

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

SHIELD - Smart Heat and Intelligent Energy in Low-Income Districts

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

Trinity

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

Park and Flex

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

Indus

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

Heat Risers

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

Lightspeed

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

Watt Heat

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

Heatropolis

Start date: Oct 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

Full Circle

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

Connectrolyser

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

CommsConnect

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Alpha - Round 2
UK Power Networks

Hy-Fair - Alpha

Start date: Oct 2023
End date: Apr 2024
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • SIF Alpha - Round 2
SGN

HyNTS Compression

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Gas Transmission PLC

Nuclear Net Zero Opportunities (N-NZO)

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Gas Transmission PLC

Green Hydrogen Injection into the NTS

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Gas Transmission PLC

HyNTS Deblending

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Gas Transmission PLC

Ch4rge Emissions Reduction

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Gas Transmission PLC

Hydrogen Barrier Coatings for Gas Network Assets

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Gas Transmission PLC

Gas Networks Interoperable Digital Twin

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Gas Transmission PLC

HyPark

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF - Discovery
Wales & West Utilities

HyNTS Pipeline DataSet

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Gas Transmission PLC

Gas Analyser Systems for Hydrogen Blends

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Gas Transmission PLC

Hydrogen Metering

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Gas Transmission PLC

Excess Gas Turbine Energy Generation

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF - Discovery
Northern Gas Networks

CEV: Critical factors for the adoption of smart homes for energy efficiency and implications for consumers and providers

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF - Discovery
Northern Gas Networks

Thermal imagery analysis - Condition assessment fluid and pressure

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
Northern Gas Networks

Rail Decarbonisation Planning

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
Northern Gas Networks

Multimodal Hydrogen Transport Refuelling Study

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
Northern Gas Networks

Network-DC Circuit Breakers

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF - Discovery
Scottish and Southern Electricity Networks Transmission

INCENTIVE - Innovative Control and Energy Storage for Ancillary Services in Offshore Wind

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF - Discovery
Scottish and Southern Electricity Networks Transmission

NIMBUS - Network Innovation and Meteorology to Build for Sustainability

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF - Discovery
Scottish and Southern Electricity Networks Transmission

CrowdFlex: Discovery

Start date: Apr 2022
End date: Jun 2022
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF - Discovery
National Energy System Operator

Virtual Energy System

Start date: Apr 2022
End date: Jun 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
National Energy System Operator

Digi-GIFT

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF - Discovery
SP Energy Networks Transmission

EN-twin-e

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF - Discovery
SP Energy Networks Transmission

Predict4Resilience

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF - Discovery
SP Energy Networks Transmission

Flexible Heat

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
SP Energy Networks Transmission

HEAT BALANCE

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
SP Energy Networks Transmission

A Holistic Hydrogen Approach to Heavy Duty Transport (H2H)

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
SP Energy Networks Transmission

Resilient and Flexible Multi-Energy Hub Networks for Integrated Green Mobility

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
SP Energy Networks Transmission

Asset Reuse and Recovery Collaboration (ARRC)

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
SP Energy Networks Transmission

Fast Flex

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF - Discovery
SP Energy Networks Transmission

Digital Twin - Exploring the societal, operational, and cross industry whole system benefits on the Gas Distribution Network

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF - Discovery
SGN

Digital Twins: Exploring the commercial, societal and operational benefits on green hydrogen projects

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF - Discovery
SGN

Predictive Safety Interventions

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF - Discovery
SGN

Intelligent Gas Grid

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF - Discovery
SGN

Velocity Design with Hydrogen

Start date: Feb 2022
End date: Apr 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
SGN

NAVIGATION

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF - Discovery
SGN

Eye in the Sky - Application of satellite data to improve grid resilience

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF - Discovery
National Grid Electricity Transmission

SEGIL - Sustainable Electrical Gas Insulated Lines

Start date: Mar 2022
End date: May 2022
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF - Discovery
National Grid Electricity Transmission

SCADENT - Super Conductor Applications for Dense Energy Transmission

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF - Discovery
National Grid Electricity Transmission

Digital Platform for Leakage Analytics – Discovery Phase

Start date: Mar 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF - Discovery
Cadent

Planning Regional Infrastructure in a Digital Environment (PRIDE)

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF - Discovery
National Grid Electricity Distribution

EV Respond

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • SIF Discovery - Round 2
National Grid Electricity Distribution

Proportional Investment Of Networks in Energy Efficiency Retrofit (PIONEER)

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF - Discovery
National Grid Electricity Distribution

TEED (Tyseley Environmental Enterprise District)

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF - Discovery
National Grid Electricity Distribution

SYSMET - SYstem Strength Measurement and EvaluaTion

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Scottish and Southern Electricity Networks Transmission

BluePrint - Building Industry Collaboration and Methodologies for Developing Offshore Wind Behind Constraint

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 3
Scottish and Southern Electricity Networks Transmission

REVISE - Revisiting and Evaluating Environmental Inputs on Line Ratings

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Scottish and Southern Electricity Networks Transmission

Hydrogen Storage in Aquifers

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Wales & West Utilities

Regional Energy Strategic Modelling (RESM) Discovery

Start date: Mar 2024
End date: May 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Discovery - Round 3
Northern Gas Networks

Production And long-Term Containment of Hydrides (PATCH) Discovery

Start date: Mar 2024
End date: May 2024
Status:
Live
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Discovery - Round 3
Northern Gas Networks

Network Security in a Quantum Future

Start date: Mar 2024
End date: May 2024
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 3
National Energy System Operator

Probabilistic Pathways for Energy System Planning

Start date: Mar 2024
End date: May 2024
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 3
National Energy System Operator

Rural Energy and Community Heat (REACH)

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Discovery - Round 3
National Grid Electricity Distribution

Road to Power

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Discovery - Round 3
National Grid Electricity Distribution

Carbon and Hydrogen Transportation to SAF production facilities

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
National Gas Transmission PLC

HyNTS Maritime

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
National Gas Transmission PLC

B-Linepack+

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
National Gas Transmission PLC

CoolDown

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Electricity North West

LDES NODE – Long Duration Energy Storage for Network Optimisation, Decarbonisation, and Efficiency

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Electricity North West

Gas Volume for Embedded ElectricalGeneration Modelling

Start date: Mar 2024
End date: May 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Discovery - Round 3
SGN

Exploring Geological Hydrogen Storage Opportunities for the East Midlands (EMStor) - Discovery

Start date: Apr 2024
End date: Jul 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Cadent

HIRE - Hybrid Network Improvement and Reliability Enhancement

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 3
National Grid Electricity Transmission

Fractal Flow

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 3
Northern Powergrid

LV Optimiser - LVOE

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
SP Energy Networks Distribution

EquiFlex

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Discovery - Round 3
SP Energy Networks Distribution

Carbon Flex

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

Data Mate

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

Wayl-ease

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

Balancer

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

Flex Direct

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

SizeWise

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

Community Led Integrated Planning (CLIP)

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

HeatNet

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

OptiHeat

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

KnowMyFlex

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

SeaChange

Start date: Mar 2024
End date: May 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Scottish and Southern Electricity Networks Distribution

WASH

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

Electric Thames

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Discovery - Round 3
UK Power Networks

Fuel Cell Renewable Energy Equity (FREE)

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Northern Powergrid

Gridlink

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Northern Powergrid

SANND (Scenario Analysis for Non­ Domestic Network Decarbonisation)

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Discovery - Round 3
Northern Powergrid

Cross Vector Energy Hub

Start date: Mar 2024
End date: Jun 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Discovery - Round 3
Northern Powergrid

Nature4Networks (R3 Discovery)

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Scottish and Southern Electricity Networks Distribution

UN:LOCK - Unblocking Networks: Local Optimisation, Consumers and Knowledge

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Scottish and Southern Electricity Networks Distribution

ALCHEM (Advanced Low Carbon Hydrogen and Energy Management)

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
Wales & West Utilities

Look NortH2

Start date: Mar 2024
End date: May 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
National Gas Transmission PLC

MaxFlex

Start date: Mar 2024
End date: Jun 2024
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • SIF Discovery - Round 3
Scottish and Southern Electricity Networks Distribution

Realistic modelling of power-to-gas operability

Start date: Mar 2024
End date: May 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 3
National Gas Transmission PLC

REACT

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
Scottish and Southern Electricity Networks Transmission

INSIGHT (Innovative Network Status Intelligence Gathered by Holistic use of Telemetry and Simulation)

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
Scottish and Southern Electricity Networks Transmission

SECURE - Securing the future delivery of all HVDC projects by de-risking the HVDC cable supply chain

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Discovery - Round 2
Scottish and Southern Electricity Networks Transmission

Electrolyser Improvements driven by Waste Heat Recovery

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Discovery - Round 2
National Gas Transmission PLC

Hybrid Storage Systems for site safety and efficiency

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
National Gas Transmission PLC

Supply Chain Resilience in the Transition

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
National Gas Transmission PLC

REWIRE (REsidential Whole system Integrated REsilience)

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Discovery - Round 2
Electricity North West

RetroMeter

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
Electricity North West

Net Zero Terrace

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
Electricity North West

Hy-Fair

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • SIF Discovery - Round 2
SGN

Distribution Network Information Modelling (DNIM)

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 2
SGN

Looking-Glass

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 2
SGN

Calfacto Latent Energy

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
SGN

Net Zero Community Energy Hubs

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
SGN

Carnot Gas Plant

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
SGN

Lightspeed

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

SHIELD - Smart Heat and Intelligent Energy in Low-Income Districts

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

CReDo+ Climate Resilience Demonstrator (extension to new climate risks)

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

CommsConnect

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Connectrolyser

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Full Circle

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Guidelight

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Heatropolis

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Indus

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Power Block

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Trinity

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

WARN (Weather Alerts and Risk analysis for Network operators)

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Watt Heat

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Heat Risers

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Park & Flex

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Discovery - Round 2
UK Power Networks

Scenarios for Extreme Events

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • SIF Discovery - Round 2
National Energy System Operator

Powering Wales Renewably

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 2
National Energy System Operator

D-Suite

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
SP Energy Networks Distribution

Inform

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 2
Northern Powergrid

Diversified Flexible Queue Management

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Discovery - Round 2
Northern Powergrid

Artificial Forecasting

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 2
Northern Powergrid

NextGen Electrolysis - Wastewater to Green Hydrogen

Start date: Apr 2023
End date: Jun 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
Wales & West Utilities

Resilient Customer Response

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • SIF Discovery - Round 2
Northern Powergrid

Integrated Hydrogen Transport Hubs

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
Wales & West Utilities

Digital Inspector

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • SIF Discovery - Round 2
Cadent

Local Energy Oxfordshire – Neighbourhoods (LEO-N)

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
Scottish and Southern Electricity Networks Distribution

Dynamic Networks

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Discovery - Round 2
Scottish and Southern Electricity Networks Distribution

VIVID - Vulnerability Identification Via Informative Data

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • SIF Discovery - Round 2
Scottish and Southern Electricity Networks Distribution

Whole Energy System Resilience Vulnerability Assessment (WELLNESS)

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • SIF Discovery - Round 2
National Grid Electricity Transmission

SIF Black Start Demonstrator from offshore wind (SIF BLADE)

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
SP Energy Networks Transmission

SCOHL

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
National Grid Electricity Transmission

HyCoRe - Hydrogen Cost Reduction

Start date: Apr 2023
End date: Jun 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
Northern Gas Networks

SF6 Whole life strategy

Start date: Apr 2023
End date: Jul 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • SIF Discovery - Round 2
National Grid Electricity Transmission

Shifting Currents

Start date: Apr 2023
End date: Jul 2023
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • SIF Discovery - Round 2
National Grid Electricity Distribution

EPRI Research Collaboration on Electric & Magnetic Fields Health & Safety (P60) 2016

Start date: Jan 2016
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

400kV Synthetic Ester Filled Transformer Pilot Project

Start date: Jul 2013
End date: Jul 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Alternative Bus Bar Protection Solution

Start date: Mar 2011
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Composite Cross-Arms Study

Start date: Jun 2008
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Investigation of Aeolian Insulator Noise

Start date: May 2014
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Cost effective removal of conductor crossing clearance constraints

Start date: Nov 2016
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Cable Installation Design & Innovation Project (CIDIP)

Start date: Oct 2013
End date: Nov 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Impact of HVDC Cable Operation on Telecommunication Lines

Start date: Apr 2014
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Decarbonisation vision for South Wales

Start date: Nov 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

The application of Parametric Design to automate substation development

Start date: Aug 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

UltraWire

Start date: Aug 2013
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Predicting Vibration Fatigue for Overhead Line Conductor Systems

Start date: Jul 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Design of a smart tool for detecting hidden errors in protection setting files

Start date: Sep 2011
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Investigation into the Properties and Behaviour of Liquid Soil (LS) Technology

Start date: Sep 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

HVDC EngD – Richard Poole

Start date: Mar 2012
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

No Power Hot Water Phase 2

Start date: Jun 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Enhanced AC and DC safety voltage limits assessment

Start date: Oct 2013
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Overhead Lines (P35) 2017

Start date: Jan 2017
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Rating Impact of Non-isothermal Ground Surface (RINGS)

Start date: Apr 2012
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Potentials and profiles around earth electrodes and opposite-side injection for large-area earthing

Start date: Jan 2012
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Substations

Start date: Sep 2015
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Oil/Paper Insulation HVDC Performance

Start date: Oct 2010
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Unlocking Transmission Transfer Capacity

Start date: May 2018
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Increasing Transmission Boundary Power Flows using an Active Power Control Unit

Start date: Dec 2018
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Harmonic compliance management

Start date: Sep 2018
End date: Sep 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Flexible rating options for DC operation

Start date: Jan 2012
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Partial discharge monitoring of DC cable (DCPD)

Start date: Nov 2012
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Simulation of multi-terminal VSC HVDC system by means of Real Time Digital Simulation (RTDS)

Start date: Oct 2011
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Substations

Start date: Apr 2013
End date: Jul 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

RESNET

Start date: Sep 2011
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Live Line Working Equipment

Start date: Aug 2010
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Optimised Location for Surge Arresters on the Transmission Network

Start date: Sep 2012
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Transformer Oil Passivation and Impact of Corrosive Sulphur (TOPICS)

Start date: Oct 2011
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Feasibility study on suitability of protection policy for future energy scenarios

Start date: Mar 2015
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Noise Assessment of ACCR Conductor

Start date: Feb 2014
End date: Nov 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Firefly

Start date: Jun 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Advanced Line Rating Analysis (ALiRA)

Start date: Jul 2018
End date: Jul 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

CSE fault analysis by 3D monitoring

Start date: Aug 2018
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Development of a Universal Bushing

Start date: Sep 2017
End date: Sep 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

HyNet Expansion Options

Start date: Apr 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Substation Time Synchronisation to Safeguard the Network

Start date: Nov 2018
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Assessment of Wireless Technologies in a Substation Environment

Start date: Jan 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Energy Highways

Start date: Aug 2018
End date: Mar 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Information and Communication Technology

Start date: Jan 2018
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

ACE (Advanced Condensing Exchanger) – Phase 2

Start date: Mar 2019
End date: Oct 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Hydrogen Deblending in the GB Gas Network

Start date: Jan 2020
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Bolt Integrity

Start date: Jan 2018
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Introduction of Environmentally Friendly Alternatives to SF6

Start date: May 2016
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Hydrogen blending - Optimisation of the commercial regime

Start date: Feb 2020
End date: Oct 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Development of a lone working device, incorporating satellite communications and fall detection.

Start date: Apr 2017
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Transient Recovery Voltage Investigation

Start date: Dec 2018
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Reducing Energy Losses from Transmission Substations

Start date: Jan 2017
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Risk Assessment Methodologies for Pipelines & AGIs 2019/20

Start date: Jun 2020
End date: Jun 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

PhotonFix 4A - preparation for field trials

Start date: Mar 2019
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Distributed Storage & Solar Study (DS3)

Start date: Aug 2016
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Smart Network Design Methodologies

Start date: Feb 2018
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Pollywood - Alternative wooden pole system for OHL

Start date: Mar 2016
End date: Sep 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Geospatial PV Mapping

Start date: May 2017
End date: May 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Constraint Based Optimisation Solution: Network Reinforcement

Start date: Mar 2019
End date: Dec 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

High Volume Gas Escapes Toolbox - Stage 2

Start date: Mar 2019
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

The future of heat - a decade to make a difference

Start date: Oct 2019
End date: Jan 2020
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Cryogenic Pipeline Cracking Technology

Start date: Oct 2018
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

VOLL 2

Start date: Nov 2018
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Bridgend Future Modelling Phase 4 – Economic Case For Hybrid Heating

Start date: Feb 2019
End date: Sep 2019
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Optimisation of weather data to improve energy forecasting

Start date: May 2018
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Virtual Synchronous Machine (VSM) Demonstrator

Start date: Jan 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Remote Site Monitoring Device

Start date: Mar 2017
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Real Time Thermal Ratings – Cables

Start date: Jun 2018
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

OHL Fault Location Concept and Directional Earth Fault Passage Indication

Start date: May 2016
End date: May 2019
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

SYNAPS Fault Detection, Classification & Location Solution

Start date: Jun 2018
End date: Dec 2019
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Timed Connection Software Development

Start date: May 2018
End date: Mar 2020
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Development of Oil-filled Cable Additive- Phase 2

Start date: Nov 2017
End date: Dec 2019
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

LoadShare

Start date: Sep 2017
End date: Jan 2020
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Detection of Broken/Low Hanging Overhead Line Conductors

Start date: Feb 2014
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Deep Excavation Load Analysis

Start date: Mar 2019
End date: Feb 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Dual Fuel Transport

Start date: Sep 2018
End date: Jan 2020
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Voltage source converter based series controlled impedance technology

Start date: Sep 2018
End date: May 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

VSC-HVDC Model Validation and Improvement (iCASE)

Start date: Sep 2015
End date: Sep 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Regional Future Energy Scenarios

Start date: Nov 2018
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Safe Removal of Concrete from Underground Assets

Start date: Nov 2019
End date: Feb 2020
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Development of Tools for the Assessment and Control of Impressed Voltage

Start date: May 2017
End date: Nov 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Travelling Wave Fault Locator Trial

Start date: Feb 2016
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRG (European Pipeline Research Group) 2019

Start date: Jun 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Mathematical Baseline and Error Detection Techniques for the Analysis of Unaccounted For Gas (UAG).

Start date: Apr 2017
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Smart SLG Phase 2

Start date: Mar 2019
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Transition to Dynamic Cable Rating Operation

Start date: May 2018
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Secure AGI – Intrusion Detection System (IDS)

Start date: Oct 2018
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Open Source SCADA Platform Phase 2

Start date: Jun 2018
End date: Feb 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

H21 – Strategic Modelling, Major Urban Centers

Start date: Apr 2017
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

GQ Sample Line Assessment & Tech Watch

Start date: Dec 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Hydrogen Injection into the NTS

Start date: Sep 2019
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

PRCI (Pipeline Research Council International) 2019

Start date: Jun 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Non Destructive testing of welds using ultrasonic Time of Flight Diffraction Techniques (TOFD)

Start date: Jun 2019
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Flow Loop Test for Hydrogen

Start date: Jun 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Project Cavendish

Start date: Mar 2019
End date: Mar 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Valve Care Toolbox 2

Start date: Feb 2019
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Assessment and Creation of Novel PE Pipe Repair Systems

Start date: Feb 2018
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Overpipe geogrid protection against third party damage

Start date: Jul 2018
End date: Jan 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Introduction of 19 Bar PE Pipeline in the UK Gas Network

Start date: Sep 2014
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

PE Repairs Test Specification

Start date: Jun 2019
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Easy Assist ECV

Start date: Jun 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Flexible biomethane production using carboxylic acids

Start date: Jan 2017
End date: Jan 2020
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Higher chain alkane gases from Anaerobic Digestion

Start date: Apr 2017
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Pathfinder Plus

Start date: Mar 2019
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Industrial & Commercial Storage

Start date: Aug 2016
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

CarConnect

Start date: Apr 2016
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Smart Energy Isles

Start date: Jan 2018
End date: Dec 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Next Generation Wireless Telecoms Analysis

Start date: Sep 2018
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Network Islanding Investigation

Start date: Jan 2019
End date: Feb 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

LV Connect & Manage

Start date: Apr 2016
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

LV Sensitive Earth Fault Protection

Start date: Mar 2018
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Losses Investigation

Start date: Apr 2015
End date: May 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Entire

Start date: Jun 2016
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

CADET (Curtailment and Dispatch Estimation Toolkit)

Start date: Oct 2018
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Remote Asset INertial Monitoring & Alerting Network (RAINMAN)

Start date: Jul 2016
End date: Mar 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Virtual World Asset Management

Start date: Apr 2015
End date: Feb 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Review of Pipeline Girth Weld Inspection

Start date: Oct 2018
End date: May 2019
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Interoperable LV Automation – Stage 1

Start date: Sep 2016
End date: May 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Social Constrained Managed Zones (CMZs)

Start date: Mar 2019
End date: Dec 2019
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

SIARA - System Integrity and Restorative Actions

Start date: May 2018
End date: Aug 2019
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Automated Pipeline BIM Modelling and Cost Estimating Tool – Stage 2

Start date: Mar 2018
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Multi-Occupancy Building Cured In Place Lining (NuFlow): Further Development of Technology for Gas Distribution Riser Systems

Start date: Apr 2018
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Smart Tester – MP applications

Start date: Jul 2018
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

HyNet Motion; Optimising Network Delivery of Hydrogen for Vehicle Transport

Start date: Sep 2018
End date: Sep 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Stent Bag

Start date: Nov 2013
End date: Mar 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

PE Flowstop (up to 10bar(g))

Start date: May 2016
End date: Dec 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Reuse of Existing Concrete Assets

Start date: Jul 2016
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Peak Power Forecast

Start date: Nov 2019
End date: Feb 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

East Neuk – A Techno Economic Study into the Energy System

Start date: Feb 2019
End date: Aug 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Assessing the Gas Network Decarbonisation Pathway

Start date: Feb 2019
End date: Jan 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Distribution Network Information Modelling – Stage 1

Start date: Mar 2019
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Domestic Carbon Capture

Start date: Oct 2018
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Incident Management (Stage 2 - Phase 2)

Start date: Jan 2019
End date: Aug 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Feasibility study into 2% hydrogen blending at St Fergus and H2 pipeline and hub at Aberdeen

Start date: Oct 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Composite Repairs to Complex Shapes

Start date: Mar 2017
End date: Dec 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

MEG Fogger Phase 5

Start date: Jan 2017
End date: Mar 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Hybrid Grid Forming Converter

Start date: Nov 2018
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Oxford Flow Optimised Pressure Reducing Station

Start date: Sep 2016
End date: Sep 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Mechanical Purge End Fitting

Start date: Mar 2017
End date: Mar 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

ERS Module Regulator Conversion Phase 1

Start date: Nov 2018
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Foam Annular Sealant for Keyhole

Start date: Jan 2019
End date: Jan 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

No Power Hot Water Feasibility

Start date: Jan 2020
End date: Mar 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Management of Brittle Plastic Materials

Start date: Jan 2018
End date: Mar 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Dark Data Regulator Maintenance

Start date: Oct 2019
End date: Jan 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

33kV Superconducting Fault Current Limiter

Start date: Jan 2010
End date: Jun 2013
Funding mechanism:
  • LCNF Tier 1
Northern Powergrid

Compounded Factors

Start date: Aug 2019
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Real Time Fault Level Monitoring (RTFLM) - Stage 1

Start date: Jan 2017
End date: Sep 2019
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

DISCERN Knowledge Transfer

Start date: Feb 2013
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

PPE Fabric Discovery

Start date: Nov 2018
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Phased Array Phase 3

Start date: Feb 2019
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Gas Demand Forecast - Phase 3 - Hydrogen

Start date: Jul 2019
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Internal Joint Repairs

Start date: Apr 2019
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

MyDart - Digital asset records tool

Start date: Dec 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Integrated Graphene Based Pre-heating System phase 2

Start date: Jan 2019
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Syphon Waste Water Remediation

Start date: Feb 2017
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Making every contact count – Enhancing protocols for disconnection and condemning ‘in-house’ applian

Start date: Jun 2016
End date: Dec 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Alternative Gas pinpointing phase 2

Start date: Feb 2019
End date: Oct 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Applied Integrated Vegetation Management

Start date: Jan 2016
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Transition to low voltage DC distribution networks – Phase 1

Start date: Mar 2018
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Overhead Line Vibration Monitoring System

Start date: Nov 2015
End date: Nov 2019
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

UK-wide wind power: Extreme and Variability

Start date: Aug 2012
End date: May 2014
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Modelling of Embedded Generation within Distribution Networks and Assessing the Impact

Start date: Aug 2012
End date: Aug 2014
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Quantifying benefits and risks of applying advanced network control and demand response technologies

Start date: Oct 2010
End date: Oct 2013
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Impact of extreme events on power production at the scale of a single wind-farm

Start date: Jan 2013
End date: Jul 2014
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Optimising the operation of an integrated DC link within an AC system (ICase Award)

Start date: Oct 2011
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

A Combined Approach to Wind Profile Prediction

Start date: Sep 2011
End date: Sep 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Seconomics - Digital Risk and Cyber Security

Start date: Apr 2012
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Mathematics of Balancing Energy Networks Under Uncertainty

Start date: Jan 2012
End date: Jul 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Scalable Computational Tools and Infrastrucutre for Interoperable and Secure Control of Power System

Start date: Oct 2012
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Protection and Fault Handling in Offshore HVDC Grids

Start date: Jul 2012
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

UK Regional Wind: Extreme behaviour and predictability

Start date: Aug 2013
End date: Aug 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Visualization of Renewable Energy Models

Start date: Oct 2013
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Development of Dynamic Demand Models in DIgSILENT PowerFactory

Start date: May 2014
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Reactive Power Exchange Application Capability Transfer (REACT)

Start date: May 2013
End date: May 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Enhanced Weather Modeling for Dynamic Line rating (DLR)

Start date: Aug 2013
End date: Aug 2016
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Control and Protection Challenges In Future Converter Dominated Power Systems

Start date: Oct 2013
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Electricity Demand Archetype Model 2

Start date: Nov 2013
End date: Nov 2014
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Facilitating Enhanced Network Capacity Evaluation

Start date: Nov 2013
End date: Aug 2014
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Industrial and Commercial Gas & Electric Scenario Modeling

Start date: Nov 2013
End date: Nov 2014
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Project Samuel - Grid Data and Measurement Systems

Start date: Dec 2013
End date: Jun 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Improving cyber security culture within operational areas

Start date: Jan 2016
End date: Jan 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Evolution of Energy Storage and Demand Management Services.

Start date: Apr 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Solar PV Forecasting Phase 1

Start date: Apr 2016
End date: Apr 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Solar PV Forecasting Phase 2

Start date: Jul 2016
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Transient Voltage Stability of Inverter Dominated Grids and Options to Improve Stability

Start date: Jun 2016
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

WI-POD- Wind turbine control Interaction with Power Oscillation Damping control approaches.

Start date: Jun 2016
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

SIM - Samuel Inertia Element

Start date: Aug 2016
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Project DESERT (hybrid battery and solar enhanced frequency control)

Start date: Sep 2016
End date: Mar 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Vector Shift Initial Performance Assessment

Start date: Feb 2017
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

EPRI Research Collaboration on Grid Operations and Control

Start date: Apr 2013
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Above Ground Crossing Inspection Mapping

Start date: Oct 2018
End date: Aug 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

EPRI Research Collaboration on Information and Communication Technology.

Start date: Apr 2013
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Clustering effects of major offshore wind developments

Start date: Apr 2014
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Investigation of sub-synchronous between wind turbine generators and series capacitors

Start date: Mar 2014
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

iTesla

Start date: Apr 2010
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Granular Voltage Control (GVC)

Start date: Apr 2014
End date: Dec 2014
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

PV Monitoring: Phase 1

Start date: Apr 2014
End date: Oct 2014
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Assessment of Distributed Generation Behaviour during Frequency Disturbances

Start date: Apr 2014
End date: Feb 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Integrated electricity and gas transmission network operating model (ICASE Award)

Start date: Oct 2012
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Smart Grid Forum Work Stream 7

Start date: Jul 2014
End date: Dec 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Open Source Interconnector Modelling: Phase 1

Start date: Dec 2014
End date: Jun 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

DNO Investigation into Voltage Interaction and Dependency Expectation (DIVIDE)

Start date: Apr 2015
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Black Start Alternative Approaches

Start date: Mar 2015
End date: Jun 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Detection and control of inter-area oscillations (DACIAO)

Start date: Oct 2015
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Transmission Network Topology Optimisation

Start date: Sep 2015
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

South East Smart Grids

Start date: Aug 2015
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

PV Monitoring Phase 2

Start date: Aug 2015
End date: Aug 2017
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Embedded cyber risks within the procurement process

Start date: Jan 2016
End date: Jan 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

SUSCABLE 2

Start date: Jul 2014
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Development of GB electric vehicle charging profiles

Start date: Dec 2018
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Situational Awareness Using Comprehensive Information

Start date: Mar 2018
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Black Start Capabilities from Non-traditional Technologies

Start date: Jan 2019
End date: Aug 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

System Planning Methods, Tools, and Analytics

Start date: Mar 2018
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Flexibility and Resource Adequacy for System Planning

Start date: Mar 2018
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Risk-Based Analysis into Planning and Resiliency Processes

Start date: Mar 2018
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Application of New Computing Technologies and Solution Methodologies in Grid Operations

Start date: Mar 2018
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

System Impacts of Embedded Storage (SIES)

Start date: Mar 2018
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Phase Lock Loop-Related Improvements to Non-Synchronous Generation Models

Start date: Feb 2018
End date: Nov 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Assessing the stability of small-scale inverter connected PV generation

Start date: Aug 2017
End date: Apr 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

GB Non-renewable Embedded Generation Forecasting Study

Start date: Jun 2017
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Optimisation of Energy Forecasting - analysis of datasets of metered embedded wind and PV generation

Start date: Jun 2017
End date: Feb 2018
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Cable diagnostics for HVDC cables

Start date: Jun 2016
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Alternative Preheat Solutions

Start date: Oct 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Smart Data

Start date: Sep 2012
End date: Dec 2015
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Identify opportunities and developments in EMF Research (2016-2018)

Start date: Apr 2016
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Electric Transportation (P18)

Start date: Jan 2018
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Measuring the Societal Impact of Network Activities

Start date: Mar 2017
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

LTS Demand Forecasting Tool Scoping Study (Phase 1)

Start date: Mar 2018
End date: Aug 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

Development of Oil-filled Cable Additive

Start date: Mar 2016
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

European Pipeline Research Group 2018

Start date: Apr 2018
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Low Cost LV Substation Monitoring

Start date: Mar 2016
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Management of plug-in vehicle uptake on distribution networks

Start date: Mar 2016
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Gas demand forecasting – Phase 2

Start date: Jun 2018
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Electricity and heat

Start date: Jul 2016
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Combined CP and P remote monitor

Start date: Jan 2017
End date: Nov 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Green City Vision

Start date: Aug 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Permanent PE slab protection

Start date: Nov 2016
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

WATTS – Weather Analytics for The Transmission System

Start date: Sep 2018
End date: May 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Development of a Risk Based Approach for Safe Control of Operations

Start date: Oct 2016
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Automated Loop Restoration

Start date: Jun 2015
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Aerial Imaging Research (AIR)

Start date: May 2017
End date: May 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Feasibility of Risk based Network Planning

Start date: Apr 2015
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Hydrogen in the NTS – foundation research and project roadmap

Start date: Nov 2018
End date: May 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Valve Pits Insulation

Start date: Jul 2018
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Positioning ballistic screening on substation sites

Start date: Dec 2018
End date: Sep 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Noise Mitigation Tool

Start date: May 2017
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

RUL Determination for Compressors 2

Start date: Nov 2017
End date: Jun 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Future Of Gas Transportation Charging

Start date: Feb 2019
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

>7 bar Permanent Leak Repair Clamps

Start date: Oct 2016
End date: Nov 2018
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Health Monitoring of cables using Acoustic Emission Measurement Techniques

Start date: Sep 2018
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Network Damage Reporter

Start date: Apr 2015
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

SMART GEO GRID

Start date: Sep 2018
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Condition Monitoring of Circuit Breakers - iCASE

Start date: Jun 2016
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Risk Assessment and Modelling of Smart nEtwork Solutions (RAMSES)

Start date: Oct 2017
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Whole-System Growth Scenario Modelling

Start date: Oct 2017
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Partial Discharge in HVDC Cables

Start date: Aug 2018
End date: Feb 2019
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Composite Core (ACCC) Inspection

Start date: Dec 2016
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

System Two Assess and Seal System (STASS)

Start date: Apr 2017
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Activating Community Engagement (ACE)

Start date: Apr 2015
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Development of An Improved Distribution Load Estimates Methodology

Start date: Apr 2015
End date: Nov 2015
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Transformer Intrascope Phase 2

Start date: Dec 2015
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Improving Demand Forecasting

Start date: Oct 2016
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Phase Identification Unit to Assist in Underground Fault Location

Start date: Feb 2018
End date: May 2019
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Gas Quality Impacts on Industrial and Commercial applications

Start date: Sep 2017
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

Carbon Portal

Start date: Apr 2018
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Project REACH (Reaching Everyone and Connecting Homes)

Start date: Jul 2018
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

FreeNonDom

Start date: Jul 2018
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Climate Change Impact Mapping

Start date: Mar 2017
End date: Jul 2020
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Power Transformer Real Time Thermal Rating

Start date: Jun 2014
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Faraday Grid Deployment Trial

Start date: Oct 2018
End date: Oct 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Detection and prevention of formation of Islands via SCADA.

Start date: Jan 2016
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Enhanced Voltage Control

Start date: Nov 2015
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Value of Lost Load to Customers

Start date: Oct 2015
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Pole Current Indicator

Start date: May 2017
End date: Nov 2018
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

DEDUCE (Determining Electricity Distribution Usage with Consumer Electronics)

Start date: Oct 2017
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Harmonic Effect on Network Assets (HENA)

Start date: Mar 2017
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Assessment & Testing of Alternative Cut-outs

Start date: Nov 2017
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

SF6 Alternatives

Start date: May 2017
End date: May 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Pressurised Cable Active Control and Monitoring

Start date: Sep 2015
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Smart Charging Architecture Roadmap

Start date: Apr 2018
End date: Feb 2019
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Recharge the Future

Start date: Oct 2017
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Global Earthing Systems (GES)

Start date: Mar 2017
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Tier 2 Foam bags

Start date: Dec 2016
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Domestic Energy Storage & Control

Start date: Sep 2016
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Black Cab Green

Start date: Aug 2017
End date: Aug 2018
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Improved Statistical Ratings for Distribution Overhead Lines

Start date: Jul 2015
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Solar Storage

Start date: Apr 2015
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Mobile Asset Assessment Vehicle (MAAV)

Start date: Jul 2016
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

FREEDOM - Flexible Residential Energy Efficiency Demand Optimisation and Management

Start date: Oct 2016
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Top Tee Siphon Adaptor (TTSA)

Start date: Dec 2015
End date: Aug 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Common Information Model

Start date: May 2016
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Hydrogen Heat and Fleet Viability Assessment

Start date: May 2018
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

LCT Detection

Start date: Oct 2018
End date: Feb 2019
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Serviboost Phase 2

Start date: May 2017
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Risk Assessment Methodologies for Pipelines and AGIs 2018

Start date: Apr 2018
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Valve Care Toolbox

Start date: Sep 2017
End date: May 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Bond and Bolt Saddle System

Start date: Apr 2014
End date: Feb 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Vacuum Excavation for Local Transmission System (VELTS) - Stage 1

Start date: Jun 2018
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Automated Regulator Maintenance (ARM) (Phase 1)

Start date: Sep 2015
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

Corrosion Mapping System for Buried Orpheus Regulator Modules – Phase 2

Start date: Aug 2015
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

Self-Amalgamating Tape (Stage 3)

Start date: Oct 2015
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

Destructive Testing of Set-In and Set-on Nozzle connection welds

Start date: Aug 2018
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Generation of Intelligent P&IDs from Plant3D models

Start date: Jan 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Induction Heating

Start date: Jul 2017
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Sensitivity and Specificity of Stress Concentration Tomography – I CASE award

Start date: Nov 2014
End date: Nov 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

PRCI (Pipeline Research Council International) 2018

Start date: Apr 2018
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Compressor Data Analytics

Start date: Nov 2017
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Incident Management (Stage 2 – Phase 1)

Start date: Jun 2018
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

LiDAR to support NTS pipeline management

Start date: Nov 2017
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Core Drilling and Flow Stop, WASK

Start date: Sep 2014
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

Techno-Economic Feasibility of Solid State CO2 Capture

Start date: Oct 2018
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Power 2 Tower: Stage 1 Energy Harvesting Feasibility

Start date: Mar 2016
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Investigation into the use of constrained-layer damping

Start date: Mar 2014
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Investigation into Novel Robotics Locomotion Techniques

Start date: Mar 2015
End date: Aug 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Artificial Intelligence for Pipe Coating Inspection

Start date: Nov 2016
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Smart SLG Phase 1 – Automated plans

Start date: Mar 2018
End date: Nov 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Core and Vac Drilling machine Anchorage

Start date: Feb 2017
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Temporary provision for Hot Water

Start date: Oct 2018
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Safety & Operational Framework for the Temporary Provision of Alternative Natural Gas Systems (SOFTPANG)

Start date: Feb 2018
End date: Feb 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

H21 –Domestic and Commercial Metering

Start date: Apr 2017
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Strategic Pipeline Heat Study

Start date: Mar 2017
End date: Oct 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

H21 – Alternative hydrogen production and Network storage technologies

Start date: Apr 2017
End date: Feb 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Novel Seal PPE

Start date: Dec 2018
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Bonded Saddle for Temporary Mains Access

Start date: Jun 2017
End date: Feb 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Automatic Thermovision Surveys (ACTS)

Start date: Apr 2016
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Wireless Gas Detection Assessment

Start date: May 2014
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Investigation of flow physics in gas pipe network

Start date: Oct 2014
End date: May 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Advanced Manufacturing (3D Printing) of NTS ready components

Start date: May 2017
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Universal Temperature Controller using Artificial Intelligence

Start date: Mar 2018
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

ACE (Advanced Condensing Exchanger)

Start date: Mar 2018
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

In Pipe Drone Feasibility

Start date: Jul 2018
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Sealback II (Testing)

Start date: Nov 2015
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Ironclad (Component Prototype Phase - Graphitisation Stage 2)

Start date: Mar 2017
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

Roadmap to Development & Certification of Hydrogen Blended Gas Detection Equipment

Start date: Sep 2018
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Hydrogen Perceptions, Practices and Possibilities in two UK communities

Start date: Jan 2019
End date: Jul 2019
Funding mechanism:
  • Network Innovation Allowance
Cadent

Wireless Instrumentation Field Trial

Start date: Oct 2015
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

High Volume Gas Escapes (Stage 1)

Start date: Mar 2018
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
SGN

PhotonFix™ (Seeker Particles - Stage 3)

Start date: Jul 2016
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

Hydrogen in natural gas – impact on gas engine CHP

Start date: Sep 2017
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

Network Constraint Early Warning Systems (NCEWS)

Start date: Feb 2017
End date: May 2019
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Advanced Mini Bag Kit

Start date: Jan 2016
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
SGN

Hypercube

Start date: Jan 2018
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

Digital Pressure Test Alert

Start date: Dec 2016
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Gas PTii

Start date: Feb 2014
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Automated Pressure Tester

Start date: Sep 2015
End date: Aug 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

BioSNG City Conversion

Start date: Feb 2018
End date: Nov 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

ThermalTrax Feasibility Study

Start date: Feb 2018
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

Modelling of Static and Dynamic Loads

Start date: Jan 2015
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

CIPP for Services

Start date: Oct 2017
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

Customer-Led Network Revolution

Start date: Jan 2011
End date: Dec 2014
Funding mechanism:
  • LCNF Tier 2

Low Carbon London

Start date: Jan 2011
End date: Jun 2014
Funding mechanism:
  • LCNF Tier 2
UK Power Networks

Validation of Photovoltaic (PV) Connection Assessment Tool

Start date: Jan 2012
End date: Nov 2014
Funding mechanism:
  • LCNF Tier 1
UK Power Networks

Distribution Network Visibility

Start date: Mar 2011
End date: Mar 2014
Funding mechanism:
  • LCNF Tier 1
UK Power Networks

Demonstrating the Benefits of Short-term Discharge Energy Storage on an 11kV Distribution Network

Start date: Mar 2011
End date: Feb 2014
Funding mechanism:
  • LCNF Tier 1
UK Power Networks

Smarter Network Storage (SNS)

Start date: Jan 2013
End date: Dec 2016
Funding mechanism:
  • LCNF Tier 2
UK Power Networks

Kent Active System Management (KASM)

Start date: Jan 2015
End date: Dec 2017
Funding mechanism:
  • LCNF Tier 2
UK Power Networks

Flexible Urban Networks - Low Voltage

Start date: Jan 2014
End date: Dec 2016
Funding mechanism:
  • LCNF Tier 2
UK Power Networks

Flexible Plug and Play Low Carbon Networks

Start date: Jan 2012
End date: Dec 2014
Funding mechanism:
  • LCNF Tier 2
UK Power Networks

Smart Paints and Coating Systems

Start date: Feb 2015
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

MEG Saturation Monitoring

Start date: Jan 2017
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

Pit Protect

Start date: Oct 2016
End date: Mar 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

Project EVA – Extreme Value Analysis

Start date: Jan 2017
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Customer Self Isolation and Restoration (Stage 2)

Start date: Oct 2013
End date: Feb 2014
Funding mechanism:
  • Network Innovation Allowance
SGN

Cured In-Place Pipe (CIPP) (Stage 2)

Start date: Aug 2013
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Optomole

Start date: Mar 2013
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Robotics

Start date: Jan 2014
End date: Jun 2018
Funding mechanism:
  • NIC
SGN

Iron Mains Condition Assessment System

Start date: Apr 2012
End date: Jul 2013
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Real-Time Networks Feasibility Study

Start date: Nov 2014
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
SGN

SynthoScope

Start date: Mar 2015
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
SGN

Orbis Oxifree (TM198) Corrosion Coating

Start date: Jun 2014
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Seeker Particles (Stage 2)

Start date: Jul 2014
End date: Jun 2015
Funding mechanism:
  • Network Innovation Allowance
SGN

Technical Review of Non-conventional Statcom Applications

Start date: Feb 2017
End date: Aug 2017
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Highly Portable GPR

Start date: Oct 2016
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Time Series Data Tool Feasibility Study

Start date: Oct 2016
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Subline Structural

Start date: Mar 2016
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Carbon Tracing

Start date: Aug 2016
End date: Mar 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

LV Plus

Start date: Aug 2016
End date: Aug 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Electric Vehicle Emissions Testing

Start date: Jul 2016
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Lightning Protection

Start date: Dec 2013
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Dynamic Line Rating CAT1

Start date: Apr 2009
End date: Apr 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Superconducting Cables – Network Feasibility Study

Start date: May 2016
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Project SYNC (Solar Yield Network Constraints)

Start date: Sep 2015
End date: Feb 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Airborne Inspection Phase 1

Start date: Nov 2015
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Fault Passage Indicators for Sensitive Earth Faults

Start date: Dec 2015
End date: Mar 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Starline/Marwin Valve Bolt Replacement

Start date: Dec 2013
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
SGN

Microstop

Start date: Sep 2013
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
SGN

Thermal imaging Observation techniques for Underground CAble Networks (TOUCAN)

Start date: Jan 2016
End date: Sep 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

ACCESS – Local Constraint Management (Mull)

Start date: Jul 2015
End date: Feb 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Field Team Support Tool

Start date: Apr 2015
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

MRPS Digital Map-Based Data Capture and Mobile GIS

Start date: Apr 2017
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Alternative gas pinpointing

Start date: Sep 2017
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

H21 - Keighley and Spadeadam designs

Start date: May 2017
End date: Apr 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Water Ingress Investigation

Start date: Nov 2016
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

ACSS Conductor Study

Start date: Mar 2018
End date: Mar 2019
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

AMS Governor Clocks

Start date: Dec 2017
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Syphon Design for Polyethylene Networks

Start date: Sep 2016
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

IntEGReL Phase 1

Start date: Apr 2017
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Cable Oil Regeneration

Start date: Apr 2013
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

GasLight Q field portable nondestructive PE material analyzer

Start date: Mar 2015
End date: May 2018
Funding mechanism:
  • Network Innovation Allowance
SGN

ATLAS - Architecture of tools for load scenarios

Start date: Nov 2015
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Transformer Rating Modelling Tool Enhancement

Start date: Sep 2015
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Reliable, low-cost earth fault detection for radial OHL systems

Start date: Oct 2015
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Transient and Clearances in the Future Electrical Transmission Systems (ICASE Award)

Start date: Sep 2012
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Valve Sealant Line Grouted Tee

Start date: Jun 2016
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Cable Extraction

Start date: Apr 2013
End date: Feb 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Feasibility study on the application of advanced materials

Start date: Jan 2016
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Portable gas Reading Equipment (PRE)

Start date: Jan 2017
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Leakage Sealant Standards

Start date: Nov 2016
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

GPS Enabled Video in Route-Walk Surveys

Start date: Mar 2017
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Gas Demand Forecasting

Start date: Oct 2017
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Open Source SCADA Platform

Start date: Sep 2017
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

PRCI - Pipeline Research Council International - 2017

Start date: Apr 2017
End date: Apr 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Acoustic Resonance Technology (ART)

Start date: Jan 2017
End date: Mar 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Endbox G38 Level Detection

Start date: May 2017
End date: May 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Novel methodology for assessing environmental exposure of OHL routes

Start date: May 2017
End date: Nov 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Development of fittings analysis model

Start date: Jan 2017
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Installation Risk and Technology Assessment Model

Start date: May 2016
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Gas Quality 2020

Start date: Aug 2016
End date: Sep 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Composite Pipe Supports Phase 2

Start date: Aug 2016
End date: Mar 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Gas Transmission Network Output Methodology Analytics

Start date: Aug 2016
End date: Aug 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Alternative Pre-Heat System

Start date: Sep 2017
End date: Feb 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Data and Schematics Improvement

Start date: Dec 2017
End date: May 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Risk Assessment Methodologies for Pipelines and AGIs 2017

Start date: Apr 2017
End date: Apr 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Epoxy Grout Investigation and Analysis

Start date: Jun 2017
End date: Mar 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

European Pipeline Research Group 2017

Start date: Apr 2017
End date: Apr 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

EMAT – In-line Coating Disbondment Detection Assessment

Start date: Nov 2017
End date: May 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Overhead Line Assessments Using Panoramic Images

Start date: Jul 2017
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Directional Earth Fault Passage Indicator Trial

Start date: Jan 2014
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Seam weld identification

Start date: Jul 2016
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Next Generation Predictive Emission Monitoring Validation (PEMS)

Start date: Mar 2016
End date: Aug 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Efficient network constraint management through the use of market signals

Start date: Jun 2016
End date: Aug 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Optimising overhead line conductor inspection & condition assessment

Start date: Apr 2016
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

RoadMender reinstatement trial

Start date: Jan 2016
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Underground HV Cable Research

Start date: Sep 2015
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Vertical Transition Straight Joints Innovative Inspection

Start date: Sep 2015
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Better Spur Protection

Start date: Apr 2014
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Freight Electric Vehicles in Urban Europe (FREVUE)

Start date: Mar 2013
End date: Sep 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

iStop

Start date: Jul 2017
End date: Aug 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Practical Solution for Overbuilds

Start date: Dec 2016
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Remote ECV Isolation

Start date: Sep 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Digital MPRS Solution

Start date: Aug 2016
End date: Sep 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Traceability

Start date: May 2017
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

CNG Vehicle Trial

Start date: Oct 2015
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Live ECV Exchange

Start date: Feb 2018
End date: Aug 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Operational Assessment of Composite Poles

Start date: Feb 2017
End date: Feb 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Life Cycle Costing and Value Optimisation (ICase Award)

Start date: Oct 2014
End date: Apr 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Feasibility Study for Sustainable Substation Design

Start date: Feb 2012
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Modelling the tape corrosion process for oil-filled underground cables

Start date: Oct 2013
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Clean to Green

Start date: Jun 2017
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Remote circumferential pipe cleaning tool

Start date: Dec 2016
End date: Mar 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Portable Earthing Device

Start date: Nov 2016
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Detection and Measurement of ACSR Corrosion

Start date: Nov 2011
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

NDT of Welds by Ultrasonic Techniques

Start date: Aug 2017
End date: Mar 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Health and Safety Monitor

Start date: Dec 2016
End date: Apr 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Controllable Series Impedance at 275 and 400kV (CSI)

Start date: Jun 2017
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Novel acoustic attenuation feasibility study

Start date: Feb 2017
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Transformer Research Consortium

Start date: Apr 2013
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Study into the Concept of High Impact, Low Probability Events

Start date: Nov 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Migration Corrosion Inhibitors

Start date: Mar 2017
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

I-0052 Optomole Phase 4

Start date: Sep 2016
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

PRISM (Pipe Replacement in situ Manufacturing) - Material Lifetime Testing

Start date: May 2016
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Blown Air Extrusion (BAE) Material Lifetime Testing

Start date: May 2016
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

PRISM (Pipe Replacement in situ Manufacturing) – Below Ground Dead Main Trial and Associated Work

Start date: Jul 2016
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Tier One Replacement System Stage 5

Start date: Jul 2015
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Blown Air Extrusion (BAE) – Proof of Concept 3

Start date: Sep 2016
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Security Assessment of Industrial Control Systems (ICS)

Start date: Jun 2016
End date: Sep 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Deployment of Resin-based Pipe Replacement in Services

Start date: Jul 2017
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

Digital Substation – Virtual Site Acceptance Testing & Training

Start date: Mar 2015
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Automated Pipeline BIM Modelling and Cost Estimating Tool – Stage 1

Start date: Oct 2017
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

Resin-based Gas Distribution Pipe Replacement

Start date: Jun 2017
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Remote Asset Vibration Monitoring

Start date: Jul 2017
End date: Oct 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Connections Forecasting Feasibility Study

Start date: May 2017
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Gas Polymerisation – Stage 2 - Engineering Development

Start date: Sep 2015
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
SGN

Gas Polymerisation - Proof of Concept

Start date: Aug 2014
End date: Jul 2015
Funding mechanism:
  • Network Innovation Allowance
SGN

Proof of Concept for IEC61850 Process Bus Technology

Start date: Aug 2013
End date: Feb 2018
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Multi-Occupancy Building Cured In Place Lining (NuFlow)

Start date: Apr 2017
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

Industry and Network Blends – Delivering Reduced Carbon Intensity on the Network

Start date: May 2017
End date: May 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

SynthoTrax I-Seal Robot (Technical Feasibility Study)

Start date: Jan 2013
End date: Sep 2013
Funding mechanism:
  • Network Innovation Allowance
SGN

Corrosion Mapping System for Buried ”Orpheus” Regulator Modules

Start date: Jan 2013
End date: Nov 2013
Funding mechanism:
  • Network Innovation Allowance
SGN

Tornado Max

Start date: Aug 2013
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Pneumatic PE Pushing Machine

Start date: Aug 2013
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
SGN

Portable ‘Gas In Ducts’ Sample System

Start date: Aug 2013
End date: Sep 2015
Funding mechanism:
  • Network Innovation Allowance
SGN

Large CISBOT (Cast Iron Joint Sealing Robot)

Start date: Aug 2013
End date: Aug 2014
Funding mechanism:
  • Network Innovation Allowance
SGN

Bar Hole Zone Rating (Stage 1)

Start date: Feb 2015
End date: Aug 2015
Funding mechanism:
  • Network Innovation Allowance
SGN

Advanced Gas Detection

Start date: Jan 2015
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
SGN

Combined Fuel Cell – Heat Pump Research Study

Start date: Jun 2015
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Utilisation of the Modular NIC Robotics Platform for Service Line Rehabilitation

Start date: Jun 2015
End date: Feb 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Opening up the Gas Market

Start date: Jan 2014
End date: Jan 2016
Funding mechanism:
  • NIC
SGN

Energy Map and Plan

Start date: Mar 2016
End date: Nov 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Beyond Visual Line of Sight Aerial Inspection Vehicle

Start date: Mar 2014
End date: Sep 2015
Funding mechanism:
  • Network Innovation Allowance
SGN

Robotic Roadworks (Stage 1)

Start date: Dec 2015
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Incident Management (Stage 1)

Start date: Dec 2015
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Synthotech Service Relay Initiative

Start date: Jan 2011
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
SGN

Seeker Particles

Start date: Sep 2013
End date: May 2014
Funding mechanism:
  • Network Innovation Allowance
SGN

Osprey Pressure Validator

Start date: Sep 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
SGN

Small Pressure Pot

Start date: Oct 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
SGN

RCA GPS Survey

Start date: Oct 2013
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
SGN

Gas Eco (GECO) Gas Pump

Start date: Mar 2014
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Self-Amalgamating Tape (Stage 2)

Start date: Oct 2013
End date: Nov 2014
Funding mechanism:
  • Network Innovation Allowance
SGN

Long handled PE Top Tee Cutter

Start date: Jun 2014
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Oscillating Energy Harvester (Phase 2)

Start date: Feb 2014
End date: Feb 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Acoustic Communications in Gas Mains

Start date: Feb 2014
End date: Feb 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Acoustek

Start date: May 2014
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Cotter Plate Identification and Remediation (Stage 1)

Start date: Mar 2014
End date: Jun 2014
Funding mechanism:
  • Network Innovation Allowance
SGN

Gas Risk in No Access Properties

Start date: Apr 2014
End date: Dec 2015
Funding mechanism:
  • Network Innovation Allowance
SGN

Aerosol Sealant - Stage 1A - Initial Development

Start date: Aug 2014
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

40mm Serviflex

Start date: Nov 2014
End date: Feb 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

PE Bodied Valves

Start date: Feb 2015
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Solutions to Pipeline Graphitisation and Corrosion – Stage 1 - Concept Development

Start date: Jun 2015
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Interruption Solutions – Live ECV, Meter, and Service Replacement (Stage 1)

Start date: Oct 2015
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Magnetic Filtration in Medium to Low Pressure Networks

Start date: Aug 2015
End date: Feb 2017
Funding mechanism:
  • Network Innovation Allowance
SGN

Phased Array Cable Avoidance

Start date: Oct 2017
End date: Apr 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

Review of MTC Proposed Solutions for Resin Based Service Replacement Solution

Start date: Feb 2018
End date: Aug 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

Dinorwig Thermal Cycling and Cable Rating

Start date: Feb 2013
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Asset Risk Optimisation

Start date: Jul 2015
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Ester Fluid Transformer Re-Design

Start date: Dec 2015
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Underground Cable Overlay Cost Reduction

Start date: Sep 2015
End date: Feb 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Alternative Cable Installation Methods (ACIM) – Phase 1 (Feasibility Study)

Start date: Oct 2015
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Assessment of Remotely Operated Mulching Methods

Start date: Nov 2015
End date: Nov 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Innovative Approach for Transmission Harmonics Issues

Start date: Jan 2017
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Locamation SASensor High-Medium Voltage (HMV) Primary Substation Protection

Start date: Jul 2012
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Tunnel Data Capture Enhancement

Start date: Nov 2015
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Impact of Biomethane on Gas Networks.

Start date: Mar 2017
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Water Extraction Reel & Y Branch

Start date: Nov 2013
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Immersion Tube Preheating

Start date: Jan 2013
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Novel Pressure Reduction Station (Stage 1)

Start date: Jan 2014
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
SGN

Robotic Roadworks System (RRS) - Stage 2

Start date: Nov 2016
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
SGN

Total stub end abandonment

Start date: Jan 2015
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Development of draft NGG standard for RTP pipelines

Start date: Apr 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Concrete Removal System for Multi-Occupancy Buildings (MOBs)

Start date: Mar 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Repair Sleeve for Gas Pipe Systems in Multi-Occupancy Buildings (MOBs)

Start date: Mar 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Wall Anchors for Gas Pipe Systems in Multi-Occupancy Buildings (MOBs)

Start date: Mar 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

HyNet – Capital Resources Project

Start date: Feb 2018
End date: Jun 2018
Funding mechanism:
  • Network Innovation Allowance
Cadent

Tier One Replacement System Stage 4.2

Start date: Oct 2014
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Trialling Long-Lasting Tower Paints

Start date: Apr 2016
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Remote monitoring Device for Flammable and Toxic Gases

Start date: Sep 2016
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Risk Assessment Methodologies for Pipelines and AGI’s 2016

Start date: Apr 2016
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

PRCI - Pipeline Research Council International - 2016

Start date: Apr 2016
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

European Pipeline Research Group 2016

Start date: Apr 2016
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

SENSIT Acoustic Pipe Locator

Start date: Jun 2015
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Paw Patrol (Gas Detection Dogs - Phase 2)

Start date: Aug 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Alternative ECV Exchange Kit

Start date: Mar 2016
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Development of DANINT FWAVC software for New Gas Chromatograph

Start date: Dec 2010
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

T Shale – Part One (scenarios)

Start date: Jan 2015
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

A new technical specification for future gas composition analysis equipment

Start date: Jan 2017
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Intelligent CO Monitors

Start date: Jul 2014
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Iron Mains Condition Assessment System Phase 3

Start date: Jul 2014
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Removable Composite Transition Pieces (CTP)

Start date: Jul 2013
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Hystart

Start date: Apr 2016
End date: Aug 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Assessment of Bioenergy Resource Potential for UK Biomethane

Start date: Feb 2017
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Iron Mains Condition Assessment System Phase 3a

Start date: Dec 2013
End date: Feb 2014
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Unconventional gases within the onshore gas networks

Start date: Feb 2013
End date: Dec 2013
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

e Pipe – Trial internal lining assessment and development of small diameter pipelines.

Start date: Mar 2013
End date: Sep 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Diurnal Storage (Phase 2)

Start date: Feb 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Asset Health & Criticality Modeling

Start date: Dec 2013
End date: Oct 2014
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Cornwall Energy Island

Start date: Feb 2016
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Treatment & Re-use of Gasholder Sludge

Start date: May 2014
End date: Nov 2015
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Electrical Power Research Institute Programme Engagement

Start date: Jan 2013
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Enhanced Real-Time Cable Temperature Monitoring

Start date: Apr 2015
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Multi-Occupancy Building CIP (HTC Serline)

Start date: May 2014
End date: Jul 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Investment Prioritisation in Distribution Systems

Start date: Dec 2013
End date: Nov 2015
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Ductile Iron Window Cutter Tool

Start date: Jun 2014
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Safe Digging Phased Array Feasibility Study

Start date: Jan 2017
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Multi-Occupancy Building Cured In Place Lining (NuFlow) trial

Start date: Mar 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Alternative PE joint preparation

Start date: Jan 2017
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Off-Take Reform / Alarm & Demand Management

Start date: Jan 2015
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Back Blade Protector

Start date: Dec 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Cognitive Technology for Technical Standards

Start date: Dec 2016
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Detailed design of 400 kV 240MVA Mobile Substation Bay

Start date: Sep 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Grid Planning (P 40)

Start date: Jul 2016
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Substations 2016 (P37)

Start date: Oct 2016
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Overhead Lines 2016 (P35)

Start date: Oct 2016
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Cyber Security 2016 (P183)

Start date: Jun 2016
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

H21 Leeds Citygate

Start date: Jan 2015
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Mobile Virtual Reality Modelling

Start date: Jun 2015
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Flexible Energy Model

Start date: Nov 2016
End date: Feb 2017
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

33kV Hot Glove Working

Start date: May 2014
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

I0071 H2 Clusters

Start date: Nov 2016
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Impact of Distributed Gas Sources on the GB Gas Network

Start date: Jun 2015
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Parade (Polemounted Auto-Recloser Automated Distribution Evaluation)

Start date: Apr 2015
End date: Aug 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Feasibility study – Small Unmanned Aerial Systems

Start date: Oct 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Non-Intrusive Assessment Techniques for Tower Foundations

Start date: Oct 2016
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

BioH2 Project: Production of hydrogen by the gasification of waste

Start date: Oct 2016
End date: Jun 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Cables with Long Electrical Sections

Start date: Apr 2012
End date: Aug 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Rapid Deployment Ballistic Screens

Start date: Jul 2011
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Optimisation of Node Configuration In Offshore Supergrids

Start date: Jun 2011
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

T-pylon Structure and Composite Insulator Testing

Start date: Feb 2014
End date: Dec 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Induced voltages and currents on transmission overhead lines under NSI 4 working practices

Start date: Feb 2014
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Application of DC circuit-breakers in DC Grids

Start date: Jul 2012
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Dynamic Ratings for improved Operational Performance (DROP)

Start date: Apr 2012
End date: Aug 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Multi-terminal VSC HVDC operation, control and ac system integration

Start date: Oct 2011
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Magnetic Models for Transformers

Start date: Sep 2009
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Bushing and Instrument Transformer Test Tap Connection Condition Assessment Tool

Start date: Nov 2013
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Online Gas in Oil Analysis on Existing HV Cables

Start date: May 2013
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Electromagnetic transients (EMT) in future power systems – Phenomena, stresses & modelling

Start date: Mar 2011
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

A New Independent Methodology For P&C Coordination Studies Using Real Time Digital Simulation

Start date: Sep 2015
End date: Sep 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Bulk Oil Circuit Breaker Bushing In Situ Refurbishment

Start date: Dec 2013
End date: Nov 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Partial Discharge on Existing HV Cable

Start date: May 2013
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Enhanced Sensor Development (ICASE Award)

Start date: Oct 2012
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Determining a threshold for magnetophosphenes perception at 50Hz

Start date: Mar 2014
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Avoiding voltage regulation action conflicts. (In conjunction with LCNF project CLASS)

Start date: Apr 2013
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Impact of Seabed Properties on Ampacity and Reliability of Cables (ICASE Award)

Start date: Oct 2012
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

DC Circuit Breaker Technologies

Start date: Oct 2012
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Sunshine Tariff

Start date: Jul 2015
End date: Feb 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Risk Assessment for Overbuilds

Start date: Aug 2016
End date: Nov 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Investigation into LPRC pipeline material

Start date: Jul 2015
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

PRISM (Pipe Replacement in situ Manufacturing) – Below Ground Yard Trial

Start date: May 2016
End date: Nov 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Re-Defining Failure

Start date: Aug 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Gas Generator Preservation Assessment

Start date: Aug 2014
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

IEC 61850 Integration of Substation Protection and Control – Test Facility

Start date: Apr 2013
End date: Dec 2016
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

T-Shale Part Two (Summer Flow Modelling)

Start date: Jan 2015
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Sustainable Multi Storey Communities

Start date: Oct 2014
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Review of Engineering Recommendation P2/6

Start date: Jan 2015
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Offtake Optimisation

Start date: Jul 2016
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Gas CHP Impact Study

Start date: May 2015
End date: Feb 2017
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Technical Standards Strategy

Start date: Jun 2016
End date: Dec 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Meter Validation Assessment Tool (MVAT)

Start date: Jan 2015
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Utilisation of 3D Laser Scanners for pipeline damage and coating assessments.

Start date: May 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Ultrasonic testing of thin wall pipeline girth welds using high frequency probes

Start date: Apr 2016
End date: Aug 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Infra-red photography for maintenance

Start date: Apr 2016
End date: Dec 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

EPRI Research Collaboration on Overhead Transmission Lines Project

Start date: Sep 2015
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Electric and Magnetic Fields Health and Safety

Start date: Sep 2015
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Smart Urban Low Voltage Network

Start date: Dec 2009
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Remaining Useful Life (RUL) determination for compressors

Start date: Aug 2015
End date: Nov 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

LV Elbow Joints

Start date: Mar 2016
End date: Nov 2017
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Development of Specification for PE Repair Systems

Start date: Sep 2014
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

On-Line Fourier Transform Infrared Siloxane Analyser for Monitoring Biomethane Sites

Start date: Aug 2014
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

The Prediction of Weather-Related Faults

Start date: May 2015
End date: Aug 2016
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

UAV Platform Development for Automated Asset Condition Diagnosis

Start date: Mar 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Blown Air Extrusion (BAE) Fully Structural Solution - Proof of Concept

Start date: Mar 2016
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

PRISM (Pipe Replacement in situ Manufacturing) – Above Ground Trial

Start date: Mar 2016
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Asset Information Models (AIM) for Component/Pattern Recognition

Start date: Mar 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Modular Approach to Substation Construction - Design Development

Start date: Apr 2014
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Alternative to Wood Poles – Feasibility Study

Start date: Jul 2015
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Review of the FWACV Billing Regime

Start date: Feb 2015
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Project Concur

Start date: Mar 2016
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Future Network Modelling Functions

Start date: Mar 2016
End date: Sep 2017
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Analytical Approaches to Asset Management

Start date: Feb 2016
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Classification of Wind Exposed Overhead line Spans

Start date: Feb 2016
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Selective Catalytic Reduction (SCR) Pre-FEED Environmental and Technical Study

Start date: Feb 2016
End date: Feb 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Project Futurewave - Phase 3 (Pilot)

Start date: Feb 2016
End date: Feb 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Assessment and bench marking of low carbon heating technologies

Start date: Feb 2016
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

MEG Fogger Trial Phase 4a

Start date: May 2015
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

MEG Fogger Trial Phase 3

Start date: Nov 2014
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Time Series Data Quality

Start date: Feb 2016
End date: Feb 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Environmental Containment solutions for Midel 7131

Start date: Feb 2016
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Global Analysis of Smart Grid Telecommunications Solutions

Start date: Feb 2016
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

SMART Pressure Sensor device

Start date: May 2015
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

CO2 Capture through mineralisation

Start date: Jan 2015
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Development of Gas Industry Specification for Polymeric Pipe Lining Systems for Multi-Occupancy Buil

Start date: Mar 2015
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

New techniques for the measurement of pipeline depth of cover

Start date: Jan 2016
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Project Blackout

Start date: Jan 2016
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Gas to the Future

Start date: Jan 2016
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

WEKO Seal Removal

Start date: Jan 2015
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Nitrogen Sleeve Epoxy End-Seal Repair Solution

Start date: Jan 2016
End date: Jan 2019
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Low Carbon Garbage Collection – City Blue Print

Start date: Jan 2015
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Network Optimisation Project (NOP)

Start date: Jan 2016
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Development of a Standard 33kV Damped Harmonic Filter Design

Start date: Nov 2015
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

KOBUS Gas Pipe Puller

Start date: Nov 2014
End date: Feb 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Provision of Temporary Gas Supplies

Start date: Jul 2014
End date: Dec 2017
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Shunt Reactor Switching Innovation Study

Start date: Mar 2014
End date: Jul 2014
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Investigation into the development of an MVDC Demonstration Project

Start date: Jul 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Smart Transmission Zone Proposal

Start date: Oct 2013
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Prognostics and Health Monitoring of Grid Connected Assets

Start date: Dec 2012
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Tyne Tunnel guided wave trial

Start date: Jan 2014
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

TD Williamson Guided Wave Non Destructive Testing Inspection For High Rise Buildings

Start date: Jul 2014
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Electric Boulevards (Continuation of Project LCNF_WPDT1009)

Start date: Jan 2013
End date: Sep 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Network Outperformance Measure Risk Trading Methodology

Start date: Apr 2015
End date: Dec 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Guided Wave Non Destructive Testing Inspection of Mains Pipelines

Start date: May 2014
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Geospatial Information System (GIS) Pipeline Costing Tool

Start date: Dec 2015
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Network Outperformance Measure Risk Trading Methodology Stage 2

Start date: Dec 2015
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Blown Air Extrusion

Start date: Oct 2015
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Low Carbon Energy Solutions

Start date: Jun 2014
End date: Dec 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Investigation of Switchgear Ratings

Start date: Dec 2015
End date: Dec 2016
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Distributed Photonic Grid Instrumentation

Start date: May 2015
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Service Water Extraction

Start date: Dec 2014
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Rapid Steel Pipe Cutter

Start date: Dec 2015
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Pole Reclassification System Evaluation

Start date: Nov 2015
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Network Resilient Zone Utilising Standby Generation – Feasibility Study

Start date: Jul 2015
End date: Feb 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Fracture Monitoring Using Acoustics

Start date: Mar 2013
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Remote Water Removal System

Start date: Oct 2014
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Spatial district heating analysis and impact on gas and power demand

Start date: Apr 2015
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Western Isles Network Resilient Zone Utilizing Embedded Generation – Feasibility Study

Start date: Nov 2015
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Enhanced Operational Forecasting

Start date: Sep 2015
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Gas Infrastructure Serviceability Performance Assessment

Start date: Oct 2015
End date: Aug 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Gas Detection Dogs

Start date: Oct 2015
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Project Futurewave – Phase 2 (Digital Prototype)

Start date: Jun 2015
End date: Dec 2015
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

PRISM (Pipe Replacement in situ Manufacturing) – 6" Line Trial

Start date: Mar 2015
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

OHL Condition Assessment

Start date: Feb 2014
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Overhead Line Vibration Monitoring Phase 2

Start date: Oct 2015
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

ServiBoost

Start date: Oct 2015
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

LV Connectivity Modelling

Start date: Oct 2015
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Modelling Asset Risk

Start date: Sep 2015
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Voltage Reduction Analysis

Start date: Sep 2015
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Solid Cable Replacement Prioritisation

Start date: Sep 2015
End date: Feb 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Small Bore Cable Replacement Technology

Start date: Sep 2015
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Composite Shell Joint Retrofit Trial

Start date: Sep 2015
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Bridgend Future Modelling – Phase 3 – Required Policy Changes

Start date: Sep 2015
End date: Dec 2015
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Data Intelligence for Network Operations (DINO) Phase 1.

Start date: Sep 2015
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Business Models Enhancement (BME)

Start date: Aug 2015
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Study of crater formation threshold during gas leakage on high pressure pipes

Start date: Jan 2014
End date: Feb 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Siloxane Impact Study

Start date: Oct 2014
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

Jointing Techniques for PE Gas Pipelines up to 10 bar

Start date: Feb 2015
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Improving Customer Operations by 24 hour site Safety Monitoring

Start date: Dec 2014
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Renewable Power Trial and Demonstration

Start date: Aug 2014
End date: Feb 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Leyland CNG Filling Station

Start date: Jul 2015
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
Cadent

EPRI Research Collaboration on Overhead Transmission Lines Project

Start date: Jan 2014
End date: Jul 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

EPRI Research Collaboration on Substations

Start date: Jan 2014
End date: Jul 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

EPRI Research Collaboration on Underground Transmission

Start date: Jan 2014
End date: Jul 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Cathodic Protection for Pipelines within a Tunnel

Start date: Jul 2015
End date: Dec 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Impact of Electrolysers on the Distribution Network

Start date: Oct 2013
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Composite Pipe Supports

Start date: Sep 2012
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Above Ground Installation Integrity Decision Support Tool

Start date: May 2014
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Network Resilient Zone Utilising Embedded Generation – Feasibility Study

Start date: Jul 2015
End date: Sep 2015
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Demand Scenarios with Electric Heat and Commercial Capacity Options

Start date: Apr 2015
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Risk Assessment Methodologies for Pipelines and AGI’s 2014

Start date: Apr 2014
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Bridgend Future Modelling – Phase 2 – Willingness to Pay

Start date: Jun 2015
End date: Aug 2015
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Evaluation of a Novel Variant of ACCC HTLS Conductor

Start date: May 2015
End date: May 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Fence Feet Improvements

Start date: Dec 2014
End date: Aug 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Mobile Generation Re-Sync at 11kV and 33kV

Start date: Jun 2015
End date: Apr 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Gas Quality Study for NTS Unconventional Gas Supplies

Start date: May 2015
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Distribution Asset Thermal Modelling

Start date: Jul 2015
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Substation Earth Monitor

Start date: Apr 2015
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Pipeline Failure Rate Determination Due To Inland Natural Landsliding

Start date: Jun 2014
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Portable Valve Actuation

Start date: May 2015
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Technologies and strategies to reduce gas leakage expenditure profile

Start date: Jan 2014
End date: Jul 2015
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

NTS Block Valve Connections

Start date: Apr 2015
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Multi-Occupancy Building Cured In Place Lining (Nu Flow)

Start date: Feb 2015
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Project Futurewave

Start date: Sep 2014
End date: May 2015
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Portable Radiometric Arc Fault Locator (RAFL)

Start date: Apr 2015
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Lead Crystal Battery Assessment

Start date: Apr 2015
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Development of “AGI safe”

Start date: Feb 2014
End date: Aug 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Medium Voltage DC (MVDC)

Start date: Dec 2014
End date: Dec 2015
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Smart Building Potential Within Heavily Utilised Networks (Re-registered LCNF T1 Project)

Start date: Apr 2015
End date: Oct 2016
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

ECHO – Energy Control for Household Optimisation (Continuation of Project LCNF_WPDT1010)

Start date: Aug 2013
End date: Jan 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Voltage Control System Integration - D-SVC Phase 2 (Continuation of Project LCNF_WPDT1011)

Start date: Dec 2014
End date: Jul 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Ultrapole

Start date: Apr 2015
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Development of Packaged Solution for Bio Methane Injection

Start date: Jun 2011
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Sealback II

Start date: Nov 2012
End date: Sep 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

New Suite of Transmission Structures

Start date: Dec 2013
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Bridgend Future Modelling

Start date: Apr 2015
End date: Jun 2015
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Controlled Backfill for Peat Land

Start date: Mar 2015
End date: Sep 2016
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Protection Settings to Cater for the Evolving Transmission Network

Start date: Mar 2015
End date: Jul 2015
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Predictive Analytics Part Two

Start date: Feb 2015
End date: Nov 2016
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

High Altitude Aerial Surveillance (HAAS)

Start date: Jan 2015
End date: Jul 2018
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Hot Tap Buried Sample Probe

Start date: Jul 2013
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Pipeline Installation Techniques

Start date: Mar 2015
End date: Jul 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Biomethane Connection Guidelines

Start date: Oct 2013
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Demand Allocation Phase 2

Start date: Feb 2015
End date: Nov 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Predictive Analytics

Start date: Dec 2012
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Smarter Network Control

Start date: Feb 2015
End date: Nov 2015
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Examination of the relationship between leakage and operating pressure in MP systems

Start date: Feb 2015
End date: Dec 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

SEAMS Analytical Pilot

Start date: Nov 2013
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

The impact of biomethane on odorisation in gas distribution networks

Start date: Feb 2014
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Thin Walled PE Liners

Start date: Jan 2014
End date: May 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Optimise Own Energy Use

Start date: Jul 2008
End date: Feb 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Resource and asset reuse toolkit

Start date: Feb 2014
End date: Feb 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Metering and Gas Quality Training Simulator

Start date: Nov 2013
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Alternative Tower Construction

Start date: Apr 2013
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

National Transmission System (NTS) Constraint Modelling

Start date: May 2014
End date: May 2017
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Pressure to Gas (Phase 2)

Start date: Dec 2014
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Management of wastewater

Start date: Dec 2014
End date: Jun 2015
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Novel vibration measurement technologies

Start date: Dec 2013
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Condition Monitoring of Power Assets (COMPASS)

Start date: Oct 2014
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Pipeline and Farm Equipment Loading Review

Start date: Oct 2014
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

PRCI - Pipeline Research Council International 2014

Start date: Apr 2014
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

EPRG - European Pipeline Research Group -2014

Start date: Apr 2014
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

PRISM (Pipe replacement in situ manufacturing) – Strategy and High Level Plan for Delivery.

Start date: Oct 2014
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

Network Investment Stakeholder Engagement

Start date: Feb 2014
End date: Feb 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Load cycling and radial flow in mass impregnated HVDC Submarine cables

Start date: Oct 2011
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Magnetically Controlled Shunt Reactor (MCSR)

Start date: Dec 2013
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Asset Health Modelling (Pipelines, Special Crossings, Block Valves)

Start date: Sep 2014
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Building Information Modelling (BIM) investigation into enhanced techniques

Start date: Aug 2014
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Dynamic Assessment of Wind Generation Synthetic Inertia Contribution to the GB Power System

Start date: Oct 2013
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Research into sustainable energy and relieving fuel poverty in Multi Storey Buildings

Start date: Jan 2013
End date: Jul 2013
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Sustainable Commercial Model For Networks

Start date: Jun 2013
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Transformer Intrascope

Start date: Apr 2013
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Insulated Cross Arms – 132kV Trials

Start date: Apr 2011
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

DC/DC Converter

Start date: Sep 2013
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Insulated Cross Arms – Lecht & St Fergus Trials

Start date: Jan 2010
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

HVDC Nanocomposite Insulation

Start date: Jun 2012
End date: Dec 2015
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

NIC Proposal Development

Start date: Jun 2013
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

HVDC Cable Condition Monitoring System

Start date: Oct 2013
End date: Apr 2015
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Low Frequency Electricity Transmission Technology Evaluation

Start date: Dec 2013
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Pig trap door seals

Start date: Feb 2013
End date: Jan 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Asset Health Modelling

Start date: Oct 2011
End date: Sep 2013
Funding mechanism:
  • Network Innovation Allowance
Cadent

Alternatives to Venting

Start date: Apr 2009
End date: Aug 2013
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Development of a Risk Based Asset Management Tool

Start date: Nov 2013
End date: Nov 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Variable Envelope Compressor Economic Study (VECES)

Start date: Aug 2014
End date: Nov 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Develop novel mitigation method for high frequency main pipework vibration

Start date: Feb 2012
End date: Dec 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Feasibility study of onsite non-welded interlocking pipe construction

Start date: Jul 2014
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

External Contamination Detection & Measurement at Entry Points

Start date: Jan 2009
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

MiniLog Stray Current Monitoring Devices for Cathodic Protection Re-Life

Start date: Jan 2013
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Backup DC drive electronic starter

Start date: Jun 2012
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Study to determine Stress Concentration Factors (SCF) for alternative design on branch connections

Start date: Feb 2013
End date: Jul 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Tier One Replacement System Stage 4.1

Start date: Jun 2014
End date: Dec 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Cast Iron Fitness For Purpose (CIFFP)

Start date: Dec 2013
End date: Nov 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Network Reliability Asset Replacement Decision Support Tool

Start date: Jul 2014
End date: Jul 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Pipeline Noise Mitigation

Start date: Jun 2014
End date: Jun 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Pipeline damage measurement using handheld laser scanners

Start date: May 2014
End date: Nov 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

MEG Improvement Phase 2C

Start date: May 2014
End date: Sep 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Assessment of Electronic (analogue and Numeric) Protection equipment end of life mechanisms

Start date: Apr 2014
End date: Feb 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Tablet interface for a SF6 mass flow top-up device

Start date: Oct 2012
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Visual & Acoustic Leakage Detection

Start date: Jun 2013
End date: Sep 2013
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

EPRI Research Collaboration on Overhead Circuits.

Start date: Apr 2013
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

EPRI Research Collaboration on Electromagnetic Fields and Radio Frequencies

Start date: Apr 2013
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Internal Stress Corrosion Cracking (ISCC) Assessment Work

Start date: Mar 2013
End date: Jun 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

European Pipeline Research Group (EPRG)

Start date: Apr 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Optimal use of Quick Response (QR) Codes

Start date: Apr 2014
End date: Oct 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Alternative Riser Pipe Jointing Method - Pyplok

Start date: Apr 2014
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
Cadent

Long term demand forecasting for peak days

Start date: Apr 2014
End date: Sep 2014
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Review and Validation of the current gas demand forecasting methodology

Start date: Apr 2014
End date: Dec 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Soil & Groundwater Remediation Technologies for Gasworks and Gasholders Sites

Start date: May 2014
End date: Nov 2014
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Specification Risk Prioritisation

Start date: Apr 2014
End date: Oct 2014
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Orifice Plate Deformation

Start date: Feb 2011
End date: May 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Humber Smartzone Pilot Project

Start date: Jan 2011
End date: Mar 2017
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Frequency sensitive electric vehicle and heat pump power consumption

Start date: Apr 2014
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Alternative Differential Unit Protection for Cable only and Cable & OHL hybrid installations

Start date: Jan 2012
End date: Jan 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

SF6 Capture & Leakage Repair

Start date: May 2012
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Identifying Opportunities and Developments in Electric and Magnetic Fields Research

Start date: Apr 2013
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Impact Assessment of Seismic Analysis on Electricity Towers and Substation Equipment / Structures

Start date: Feb 2014
End date: Mar 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Wireless Condition Monitoring Sensors with Integrated Diagnostics

Start date: Jul 2011
End date: Jul 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Long Term Performance of Silicon Based Composite Insulators

Start date: Oct 2008
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Tier One Replacement System Stage 3

Start date: Feb 2014
End date: Aug 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Demand Allocation

Start date: Feb 2014
End date: Feb 2015
Funding mechanism:
  • Network Innovation Allowance
Cadent

33kV Superconducting Fault Current Limiter

Start date: Oct 2011
End date: Oct 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

PRCI - Pipeline Research Council International

Start date: Apr 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

MEG Improvement Phase 2B

Start date: Feb 2014
End date: Dec 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Computer Vision For Cable Tunnels

Start date: Jun 2013
End date: Nov 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Incident Investigation Review

Start date: Aug 2013
End date: Feb 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Acoustic Emission Measurements in Valve Leakage Detection and Quantification

Start date: Feb 2014
End date: Aug 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Risk Assessment Methodologies for Pipelines and AGI’s

Start date: Apr 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Optimisation of severe winter strategy for pipeline isolation valves

Start date: Jul 2012
End date: Jan 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Variable Envelope Compressors

Start date: Dec 2012
End date: Sep 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Turbine and Ultrasonic Meter Uncertainty and Error Analysis Tool

Start date: Jul 2011
End date: Jan 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Toughness of Fittings

Start date: Feb 2013
End date: Feb 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

The Need for Pressure De-rating Prior To In-Service Welding

Start date: Oct 2012
End date: May 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Standards Mapping Tool (SMT)

Start date: Aug 2013
End date: Feb 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Pipeline Risk Ranking Phase II

Start date: Sep 2013
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

P9 Semi-Mechanised Hot Tap Welding

Start date: Mar 2013
End date: Nov 2013
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Epoxy sleeves in place of heavy wall pipe

Start date: Nov 2012
End date: Jul 2013
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Direct Replacement Preheat Package (DRPP)

Start date: Jul 2013
End date: May 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Development of AC OHL survey system and evaluation of ER probes

Start date: Oct 2009
End date: Feb 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Daily gas demand forecasting

Start date: May 2011
End date: Sep 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

BIM (Building Information Modelling)

Start date: Jun 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Assessment of hydrophobic treatment for gas compressor air intake values & screens

Start date: Dec 2012
End date: Dec 2013
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Architectural Design of Compressor Site

Start date: Feb 2013
End date: Jan 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Venting Controllers

Start date: Jul 2012
End date: Sep 2013
Funding mechanism:
  • Network Innovation Allowance
Cadent

Tier One Replacement System (TORS)

Start date: Jul 2013
End date: Oct 2013
Funding mechanism:
  • Network Innovation Allowance
Cadent

PE Asset Life Research

Start date: Jul 2010
End date: Dec 2013
Funding mechanism:
  • Network Innovation Allowance
Cadent

MEG Improvement

Start date: Jun 2012
End date: Aug 2013
Funding mechanism:
  • Network Innovation Allowance
Cadent

Demand Scaling

Start date: Oct 2013
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

CISBOT 18” Cast Iron Demonstration

Start date: Sep 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Alternative Jointing Techniques for Small Diameter PE Pipe

Start date: Sep 2013
End date: Jan 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Thermal Efficiency Trials

Start date: Jul 2013
End date: Jan 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Identification and Mitigation of Large Equipment Transport Issues

Start date: Jan 2014
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Feasibility Study for Alternative Pipeline Materials

Start date: Jan 2014
End date: Jul 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

SCT Pipeline Inspection System

Start date: Jan 2014
End date: Apr 2016
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Pressure to Gas

Start date: Jan 2014
End date: Sep 2014
Funding mechanism:
  • Network Innovation Allowance
Cadent

Manual Phased Array for small diameter offtake weld inspection.

Start date: Dec 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Renewable Power on Remote Installations

Start date: Oct 2013
End date: Oct 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Reliability Assessment of System Integrity Protection Schemes (SIPS)

Start date: Oct 2012
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Transformer & System Reliability

Start date: Oct 2010
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Heat in the Soil Form - Assessment of heat in soil caused by buried infrastructure

Start date: Sep 2013
End date: Sep 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Control of Debris and Dust from the Treatment of Grade 4 Tower Steelwork (G4T)

Start date: Nov 2013
End date: Nov 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Understand and Improving Condition, Performance, and Life Expectancy of Substation Assets

Start date: Dec 2013
End date: Jun 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Combustible Gases in Redundant Oil Filled Cables

Start date: Dec 2013
End date: Jun 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Cable Stripping Truck

Start date: Dec 2013
End date: Jun 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

13kV Shunt Reactor Refurbishment

Start date: Dec 2013
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Voltage Optimiser Pilot

Start date: Aug 2011
End date: Aug 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Trial & Performance Assessment of ACCR Conductor (3M)

Start date: Sep 2011
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Fibre-optic Acoustic Monitoring

Start date: Sep 2012
End date: May 2015
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

ThermoMechanical Forces in XLPE Cable

Start date: Jul 2012
End date: Jan 2016
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Evaluation of Inspection Techniques for Sleeved Crossings

Start date: Jul 2013
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Ramp Rate Study System

Start date: Oct 2013
End date: Apr 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

On Site Chemical Analysis of Pipeline Materials

Start date: Sep 2013
End date: Jan 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Development of a new design vent silencer

Start date: Aug 2012
End date: Aug 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Compressor Balance of Plant Environmental Study

Start date: Aug 2013
End date: Mar 2015
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Gas quality limits in emergency situations

Start date: Apr 2013
End date: Mar 2014
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Combined Accurate Detection with Minimal Excavation

Start date: Aug 2013
End date: Dec 2013
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Carbon Monoxide Gascoseeker

Start date: Nov 2011
End date: Nov 2013
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Renewable Technology Used for Pre-Heating Feasibility Study

Start date: Jun 2012
End date: Mar 2013
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Study of proposed sources and quantities of Biomethane to Grid

Start date: Dec 2012
End date: Sep 2013
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

LV Interconnected Pairs

Start date: May 2021
End date: May 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Inertia Measurement in Island Networks

Start date: May 2021
End date: Mar 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

Probabilistic Machine Learning Solution for Dynamic Reserve Setting

Start date: May 2021
End date: Apr 2022
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Enhanced LFDD

Start date: Jun 2021
End date: Dec 2022
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Electricity North West

FI-0001 HyNet Homes – Understand Phase (technical)

Start date: Jul 2021
End date: Jun 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

CH4RGE – Methane Reduction from Gas Equipment (Stage 2)

Start date: May 2021
End date: Mar 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

FI-0003 - Common future end states and transition pathways

Start date: Jun 2021
End date: Jun 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

5G – The art of the possible

Start date: Jun 2021
End date: Mar 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Hydrogen Deblending Feasibility Phase 2

Start date: Nov 2021
End date: Oct 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

HyNTS - Hydrogen Fuel Gas for NTS Compressors

Start date: Sep 2021
End date: Jul 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Project Vulnerability and Energy Networks, Identification and Consumption Evaluation (VENICE)

Start date: Jul 2021
End date: Aug 2023
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

FI-0002 Hydrogen Village Consumer Research

Start date: Jun 2021
End date: Dec 2021
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Alternative Jointing Techniques

Start date: Jul 2021
End date: Nov 2022
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

Stability Market Design

Start date: Jun 2021
End date: Dec 2021
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

SWIC Hydrogen Supply Pipeline Infrastructure

Start date: Jul 2021
End date: Jan 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Regional Decarbonisation Pathways

Start date: Jul 2021
End date: Jul 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Net Zero Service Termination Project

Start date: Aug 2021
End date: Aug 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

LV Predict

Start date: Jul 2021
End date: Jan 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Electricity North West

Resilient Electric Vehicle Charging: “REV”

Start date: Jul 2021
End date: Dec 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

SWIC Market-Accelerating Hydrogen Distribution and Storage

Start date: Aug 2021
End date: Jan 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Biomethane Study

Start date: Sep 2021
End date: Jan 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

ADAPT-DC

Start date: Sep 2021
End date: Sep 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

HGR&D ST - Assessment Methodologies

Start date: Jul 2021
End date: Mar 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Empower

Start date: Sep 2021
End date: Feb 2023
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Innovative Replacement for Underground Substations

Start date: Sep 2021
End date: Oct 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Energy Storage Strategy

Start date: Aug 2021
End date: Sep 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Impedance Scan Methods

Start date: Jun 2023
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

H21 Occupied Trials Phase 1 - Safety Case

Start date: Sep 2021
End date: Dec 2021
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Tools of Engagement Phase 2

Start date: Sep 2021
End date: Jul 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Consumer Vulnerability Impact Assessment Tool

Start date: Sep 2021
End date: Dec 2021
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Solar PV Nowcasting

Start date: Sep 2021
End date: Jul 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Reactive Power Market Design

Start date: Sep 2021
End date: Jul 2022
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Grangemouth to Granton LTS Futures

Start date: Sep 2021
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

H100 ‘town’ Expansion-Storage Solution: Balgonie Feasibility Study

Start date: Sep 2021
End date: Jul 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Virtual OHL Inspections: Combining Statutory Inspection & Condition Based Assessment (CBA)

Start date: Oct 2021
End date: Jan 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Phoenix IIoT Demonstrator

Start date: Oct 2021
End date: Oct 2022
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
SGN

H21 - Wider Impacts of Hydrogen

Start date: Oct 2021
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

FI-0004 HyNet – Management of Additional Sources of Hydrogen Supply

Start date: Jul 2021
End date: Jan 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Introduction of Process mining enabler into SP Energy Networks

Start date: Oct 2021
End date: Dec 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Pre-Fix

Start date: Oct 2021
End date: Jan 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Data Sharing Protocols

Start date: Oct 2021
End date: Dec 2022
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
SGN

Industrial & Commercial Plant Hydrogen Sensitivity Assessment

Start date: Oct 2021
End date: Dec 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

IoT Pressure Sensor Pilot

Start date: Oct 2021
End date: Mar 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Switching vulnerable consumers to hydrogen

Start date: Oct 2021
End date: Aug 2022
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

SWIC: Assessment of potential hydrogen demand in 2030 - 2050

Start date: Oct 2021
End date: Sep 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Customer Vulnerability Mapping Tool

Start date: Oct 2021
End date: Dec 2022
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Retrofitting Oil Source Heat Recovery to Transformers

Start date: Nov 2021
End date: Oct 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

North East Scotland Pre-FEED

Start date: Oct 2021
End date: Dec 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

HyPurge

Start date: Oct 2021
End date: Apr 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Silent Power II

Start date: Oct 2021
End date: Mar 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Northern Powergrid

The Value of Flexible Heat Demand as a Service to Distribution Networks

Start date: Sep 2021
End date: Mar 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Northern Powergrid

Active Creosote Extraction (ACE)

Start date: Nov 2021
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Advanced Dispatch Optimisation

Start date: Nov 2021
End date: Jul 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

HyDew

Start date: Nov 2021
End date: Mar 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Heat - Discovery Continuation

Start date: Feb 2022
End date: Dec 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Role and value of electrolysers in low-carbon GB energy system

Start date: Sep 2022
End date: Dec 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Asset Reuse and Recovery Collaboration (ARRC) - Discovery Continuity

Start date: Feb 2022
End date: Dec 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Predict4Resilience - Discovery Continuity

Start date: Feb 2022
End date: Dec 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

Multifunctional graphene coatings for pipeline protection

Start date: Jan 2022
End date: Apr 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

H100 Fife Phase 2 Village Pre-FEED

Start date: Oct 2021
End date: Apr 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

HyNTS FutureGrid Phase 1 – Transmission Test Facility NIC

Start date: Apr 2021
End date: Dec 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIC
National Gas Transmission PLC

HyScale Academic Review

Start date: Dec 2021
End date: Feb 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Levenmouth Wastewater Treatment Works

Start date: Dec 2021
End date: Jul 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Recommissioning Grangemouth to Granton

Start date: Nov 2021
End date: Nov 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Long Term, Large Scale Hydrogen Storage Database

Start date: Nov 2021
End date: Feb 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Level-Up

Start date: Dec 2021
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Decarbonisation of Heat – Integrated Market Study

Start date: Dec 2021
End date: Mar 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

A Statistical model for determining cut out failures

Start date: Dec 2021
End date: Jun 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Electricity North West

Inhibition of Hydrogen Embrittlement Effects in Pipeline Steels

Start date: Dec 2021
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

NTS Materials Testing to Enable Hydrogen Injection in High Pressure Pipelines

Start date: Dec 2021
End date: Nov 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Optimal Outage Planning System

Start date: Dec 2021
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

A Common Framework for a Virtual Energy System

Start date: Dec 2021
End date: Sep 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Approach for Long-term Planning accounting for Carbon Assessment (ALPACA)

Start date: Jan 2022
End date: Mar 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Flexible Operation of Water Networks Enabling Response Services (FLOWERS)

Start date: Jan 2022
End date: Jul 2023
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Assessment of Climate Change Event Likelihood Embedded in Risk Assessment Targeting Electricity Distribution (ACCELERATED)

Start date: Jan 2022
End date: Mar 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Visual Inspection and Condition Assessment Platform for OHL Steelwork (VICAP)

Start date: Apr 2022
End date: Sep 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Alternative Approaches to Tower Painting Preparation

Start date: Feb 2022
End date: Jan 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Overhead Line Sagging Monitoring Using 5G Signals

Start date: Jul 2022
End date: Oct 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Technical assessment and feasibility study into water requirements for hydrogen production

Start date: Jan 2022
End date: Aug 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Servitudes and Easements

Start date: Jan 2022
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Community DSO

Start date: Jan 2022
End date: Dec 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Northern Powergrid

The Role for Hydrogen as an Electricity System Asset

Start date: Jan 2022
End date: Mar 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Low Profile 132kV Steel Poles

Start date: Jan 2022
End date: Nov 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Hyperspectral Imaging

Start date: Jan 2022
End date: Jul 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Electricity North West

Collaborative Visual Data Twin Phase 1

Start date: Feb 2022
End date: Jan 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Gas and electricity transmission infrastructure outlook

Start date: Feb 2022
End date: Jan 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Street Score 2

Start date: Feb 2022
End date: Jan 2023
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Secure Edge Platform

Start date: May 2022
End date: Aug 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Environmental Risk and Assurance (ERA)

Start date: Jan 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Decarbonising Utility Transport using Whole System Thinking

Start date: Feb 2022
End date: Nov 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

Bio CNG – SIU Feasibility Study

Start date: Feb 2022
End date: Feb 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Neighbourhood Green

Start date: Feb 2022
End date: Feb 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Emerge

Start date: Feb 2022
End date: Aug 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Community Resilience

Start date: Mar 2022
End date: Dec 2023
Status:
Live
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Glenmavis Masterplan Options Appraisal

Start date: Jan 2022
End date: Aug 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

'D3' - Data-driven Network Dynamic Representation for Derisking the HVDC and Offshore Wind

Start date: Feb 2022
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Demand Forecasting Encapsulating Domestic Efficiency Retrofits (DEFENDER)

Start date: Mar 2022
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Variable Hydrogen Blend Compression

Start date: Mar 2022
End date: Dec 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Centralised PAC

Start date: Aug 2022
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Smart Meter Innovations and Test Network (SMITN)

Start date: Mar 2022
End date: Jul 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Hydrogen Entry Unit Design

Start date: Feb 2023
End date: Aug 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Stratus

Start date: Apr 2022
End date: Sep 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Automated Transformer Monitoring System

Start date: Mar 2022
End date: Aug 2023
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Electricity North West

Probabilistic planning for stability constraints

Start date: Jan 2022
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Autonomous Aerial, Thermal Inspections of Substations

Start date: May 2022
End date: Dec 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Probabilistic Modelling for Connection Studies

Start date: Mar 2022
End date: Mar 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

FI 0015 Hydrogen Blending: Functional Spec for Commercial Frameworks (Phase A)

Start date: Apr 2022
End date: Jul 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

FI-0017 - Exit Strategy Mechanism

Start date: Apr 2022
End date: Mar 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Customer Led Electric Vehicle Early Registration (CLEVER)

Start date: Apr 2022
End date: Nov 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

Low Power Hot Water

Start date: Apr 2022
End date: Nov 2023
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-2
Cadent

Hydrogen Economy: Reassessing Approaches to Connecting Large Electrolyser Sites (HERACLES)

Start date: Apr 2022
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Retrofit Excess Flow Valves (EFVs)

Start date: May 2022
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Failure Modes and Permeation Testing of PE

Start date: May 2022
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

SWIC - Hydrogen Peaking Plant Feasibility Study

Start date: Apr 2022
End date: Mar 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Fibre Health Monitoring

Start date: Aug 2022
End date: Jan 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Portable – Low Voltage Fault Passage Indicators (Portable – LV FPI)

Start date: May 2022
End date: Mar 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

Hydrogen Skills & Competencies (HGR&D NSIB)

Start date: Aug 2022
End date: Sep 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

TOTEM (Transmission Owner Tools for EMT Modelling) Extension

Start date: May 2022
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Project Synthesis – Effective Regional Inertia Monitoring and Automatic Control with a Whole System Approach (T2)

Start date: Apr 2022
End date: Mar 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Transmission

FI-0011 - Functional Specification: Hydrogen Blending Infrastructure

Start date: May 2022
End date: Mar 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Novel methods for sealing SF6 leaks 

Start date: Jun 2022
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Assessment of Legacy Gas Pipeline Steels to Hydrogen Embrittlement Effects

Start date: Sep 2022
End date: Mar 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

New Pipeline AI Route Planning

Start date: Jun 2022
End date: Sep 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Industrial Fuel Switching Phase One

Start date: Jun 2022
End date: Jan 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Leakage Management in the Energy System Transition

Start date: Jun 2022
End date: Feb 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Vulnerability in the Energy System Transition

Start date: Jun 2022
End date: Jun 2023
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

H21 Ignition Consequence Research

Start date: Feb 2023
End date: Jan 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

ATEX Equipment & SR/25 Modification Assessment

Start date: Jul 2022
End date: Apr 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Impact of Hydrogen on NTS Polymer / Elastomer Materials – Phase 1

Start date: Jun 2022
End date: Feb 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

New online tools for Assessment of Bushing Condition

Start date: Jul 2022
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Solving Intelligent LV – Evaluating Responsive Smart Management to Increase Total Headroom (SILVERSMITH)

Start date: Jun 2022
End date: May 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Generating Additional Markets for Mature Access to Flexibility (GAMMA Flex)

Start date: Jun 2022
End date: Mar 2023
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Running Cool

Start date: Jun 2022
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

ANM - Balancing Coordination Demonstration (ABCD)

Start date: Jun 2022
End date: May 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

System value from V2G peak reduction in future scenarios based on strategic transport and energy demand modelling

Start date: Jul 2022
End date: Jan 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Cable Alternative Cooling Technologies for Underground Systems (CACTUS)

Start date: Jul 2022
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Hydrogen Navigator

Start date: Jul 2022
End date: Sep 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

H100 Specific Fire & Risks

Start date: Jun 2022
End date: Apr 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Hydrogen MOBS Data Analysis Phase 1

Start date: Jun 2022
End date: Sep 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

HOMEflex (Household or Microbusiness Energy Flexibility)

Start date: Jun 2022
End date: May 2024
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

FIC (Future of Interconnectors)

Start date: Jul 2022
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

HyScale LOHC Phase 2 Project

Start date: Jun 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Improving Carbon Monoxide Awareness

Start date: Apr 2022
End date: Feb 2023
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Security of Supply for Vulnerable Consumers (SSVC)

Start date: Aug 2022
End date: Sep 2024
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Switch Oil Markers

Start date: Aug 2022
End date: May 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Hydrogen Village Safety Framework

Start date: Jul 2022
End date: Dec 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

VFES - Vulnerability Future Energy Scenarios

Start date: Aug 2022
End date: Mar 2024
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

PSR Communication Review

Start date: Sep 2022
End date: Feb 2023
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Project Helix

Start date: May 2022
End date: Mar 2024
Status:
Live
Strategy themes:
  • Consumer vulnerability
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Insulating Dielectrics: Esters & Alternative Liquids

Start date: Sep 2022
End date: Feb 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Interventions for Hydrogen by Asset Group

Start date: Aug 2022
End date: Jan 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Hydrogen Village Trial Hydrogen Appliance Supply Chain

Start date: Aug 2022
End date: Mar 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Rural Electrification 2.0

Start date: Aug 2022
End date: Dec 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Northern Powergrid

High Voltage (HV) Auto Quote

Start date: Sep 2022
End date: Jun 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Data Historian Replacement

Start date: May 2022
End date: Mar 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Enhance Power Flow Control Capability of GB Network

Start date: Sep 2022
End date: Nov 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Ice Mapping

Start date: Aug 2022
End date: Feb 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Hydrogen Conversion Strategy - Pipework

Start date: Aug 2022
End date: Aug 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Use of Automatic Isolation Valve (AIV) Systems with Hydrogen – AIVs in LP and MP Services

Start date: Aug 2022
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Q-Flex

Start date: Sep 2022
End date: Aug 2023
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • NIA RIIO-1
National Grid Electricity Distribution

Automated Identification of Sub-Synchronous Oscillations (SSO) Events

Start date: Sep 2022
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Strength to Connect

Start date: Oct 2022
End date: Mar 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

LV Fault Passage Indicator

Start date: Sep 2022
End date: Jun 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Enduring Cross-Border Balancing

Start date: Sep 2022
End date: Mar 2023
Strategy themes:
  • Flexibility and commercial evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Research the Impact of Hydrogen on CP & Degradation of Coatings

Start date: Oct 2022
End date: May 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

CageCapture™ SF6 Flange Guard

Start date: Sep 2022
End date: Feb 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

CageCapture™ ™ SF6 Paint Detection

Start date: Sep 2022
End date: Jan 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

NeatHeat

Start date: Sep 2022
End date: Jun 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Inertia Measurement Method Optimisation

Start date: Sep 2022
End date: Sep 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Peak Demand Forecasting

Start date: Aug 2022
End date: Jan 2023
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Hydrogen Production Technologies on the NTS

Start date: Oct 2022
End date: Apr 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

SR25 Calculator update

Start date: Sep 2022
End date: Dec 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

End User Behaviour – Impact on Safety

Start date: Aug 2022
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Hypurge Safe Tooling

Start date: Sep 2022
End date: Feb 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

A Needs based segmentation of Low Income and Vulnerable Customers

Start date: Sep 2022
End date: Mar 2023
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-1
Electricity North West

Ignition Probability in Small Services

Start date: Sep 2022
End date: Mar 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Non-intrusive Tower Foundation Inspections using UGW (NITFI)

Start date: Oct 2022
End date: Sep 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Implications of Hydrogen Purity

Start date: Sep 2022
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Potential for Salt cavern storage of hydrogen in and near South Wales

Start date: Sep 2022
End date: Feb 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Gas & Fire Detection and Suppression – Hydrogen Compression

Start date: Oct 2022
End date: Aug 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

REVEAL

Start date: Sep 2022
End date: Jan 2023
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

LPG to Hydrogen Village: Feasibility and concept design

Start date: Oct 2022
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

HyCompact Laboratory Testing

Start date: Sep 2022
End date: Aug 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Power Protect

Start date: Oct 2022
End date: May 2024
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

Energy water nexus

Start date: Mar 2023
End date: Nov 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

AI Centre of Excellence

Start date: Sep 2022
End date: Dec 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

COMMANDER – Coordinated Operational Methodology for Managing and Accessing Network Distributed Energy Resources

Start date: Oct 2022
End date: Jan 2024
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Automated Tunnel and Shaft inspections

Start date: Oct 2022
End date: Oct 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Hydrogen for Industrial Estate Heating

Start date: Nov 2022
End date: Jan 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Precision Thermography for Hydrogen Pipelines Inspection

Start date: Oct 2022
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Dynamic Risk Based Patrolling

Start date: Oct 2022
End date: Apr 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Identification of NTS Opportunities in the Transport Sector

Start date: Nov 2022
End date: Sep 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Shift 2.0

Start date: Oct 2022
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Our View

Start date: Oct 2022
End date: Feb 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

EUSE – Hazardous Areas Within Buildings

Start date: Nov 2022
End date: Jan 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

EUSE - Ventilation Within Buildings

Start date: Nov 2022
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

HVT Legislative and Regulatory Analysis

Start date: Aug 2022
End date: Mar 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Asset Data Intelligence

Start date: Aug 2022
End date: Jan 2023
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

TapSOS – Digitalisation of the emergency number – Phase 1

Start date: Aug 2022
End date: Nov 2022
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
SGN

Wide Area Control Framework

Start date: Jan 2023
End date: Oct 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Easy Assist Remote Actuation

Start date: Nov 2022
End date: Feb 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Cadent

Powercast

Start date: Nov 2022
End date: Feb 2024
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Truly Sustainable D&T Substations

Start date: Nov 2022
End date: May 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Transmission

Impact of Hydrogen & Hydrogen Blends on Linepack

Start date: Jan 2023
End date: Jan 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

BC Forecasting

Start date: Nov 2022
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

3MD (Market Monitoring Model Development)

Start date: Nov 2022
End date: Oct 2023
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Virtual Energy System – Common Framework Demonstrator

Start date: Nov 2022
End date: Jul 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Technical and Commercial Impact of High Pressure Carbon Transportation

Start date: Nov 2022
End date: Apr 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Supporting vulnerable residents during power cuts

Start date: Oct 2022
End date: Mar 2023
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Smart Gas Pressure Sensor

Start date: Sep 2023
End date: Feb 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Consumer Building Blocks

Start date: Nov 2022
End date: Jul 2023
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Service Provider Capability Mapping

Start date: Oct 2022
End date: Jan 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

FutureGrid Phase 1 – 5% Hydrogen Blend Test

Start date: Dec 2022
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Hydrogen Village - Property Market Evaluation

Start date: Nov 2022
End date: Apr 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Visualising the opportunity for pipeline hydrogen for mobility applications

Start date: May 2023
End date: Dec 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Storm AI

Start date: Dec 2022
End date: Mar 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

H2London Feasibility Study

Start date: Nov 2022
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

HyLights: Hydrogen Gas Lamp Feasibility

Start date: Dec 2022
End date: Mar 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Hydrogen for Aviation

Start date: Jan 2023
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

HyNTS Variable Gas Blend Metering and Gas Analyser System Development - Phase 1

Start date: Jan 2023
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Hydrogen Village Regulation Project

Start date: Feb 2023
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Multi Gas Detection

Start date: Jan 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Safe venting & recompression of hydrogen

Start date: Jan 2023
End date: Dec 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Digital Exclusion

Start date: Feb 2023
End date: Sep 2023
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Cadent

Lessons from the Past: What can we learn from past energy transitions in the Gas Industry

Start date: Jan 2023
End date: Aug 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Carbon Intensity Modelling

Start date: Jan 2023
End date: Dec 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Co-optimisation of Energy and Frequency-containment services (COEF)

Start date: Jan 2023
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Swarfless Cut Isolation System for SF6 Outages and Repairs (SCISSORs)

Start date: Feb 2023
End date: Oct 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Future of the Transmission Network Charging Methodology

Start date: Jan 2023
End date: Mar 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Corrosion Mapping

Start date: Feb 2023
End date: Apr 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Hydrogen MOBS Asset Information Review Phase 2

Start date: Jan 2023
End date: May 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Common Planning Pathways

Start date: Feb 2023
End date: Aug 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

DETECTS II

Start date: Mar 2023
End date: Feb 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Distributed ReStart – Redhouse Live Trial

Start date: Feb 2023
End date: Dec 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Course-correction Dispatch Instructor

Start date: Feb 2023
End date: Mar 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Switchgear Requirements for Future Networks

Start date: Mar 2023
End date: Mar 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Revamp Interconnector Ramping Arrangements (RIRA)

Start date: Feb 2023
End date: Apr 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Hydrogen Production for Thermal Electricity Constraints Management

Start date: Mar 2023
End date: Aug 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Green Heat for Local Communities (GHLC)

Start date: Apr 2023
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Fluid Cable Care Phase 3

Start date: Mar 2023
End date: Sep 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
UK Power Networks

Step Up Transformer

Start date: Mar 2023
End date: Dec 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Northern Powergrid

European Hydrogen Distribution Insights

Start date: Apr 2023
End date: Jun 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

High Volume Gas Escapes Tool – update for hydrogen

Start date: Mar 2023
End date: May 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

PSR Resilience System

Start date: Apr 2023
End date: Mar 2024
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Whole Energy System Network Planning Review

Start date: Mar 2023
End date: Jul 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Integrated Hydrogen Transport Hubs

Start date: Mar 2023
End date: Apr 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

XR Facilitating Training and Operations (X-FacTOR)

Start date: May 2023
End date: Dec 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

Readi

Start date: Mar 2023
End date: Mar 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Northern Powergrid

Power Supply for Pole Mounted LV Monitoring Devices where no Neutral is Present.

Start date: Mar 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Scottish and Southern Electricity Networks Distribution

Resilient and Flexible Railway Multi-Energy Hub Networks for Integrated Green Mobility (Hubs)

Start date: Feb 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

DER Visibility

Start date: Mar 2023
End date: May 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Open Innovation Phase 2

Start date: Apr 2023
End date: Apr 2024
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

STARTZ (Stability Requirements Calculation Toward Net-Zero)

Start date: Mar 2023
End date: Aug 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Orbital Eye

Start date: Apr 2023
End date: Oct 2023
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
SGN

BISEP - H2 Testing with LTS Futures (Phase 1)

Start date: Mar 2023
End date: Sep 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Hydrogen Appliance Supply Chain - Technical Specification & Development Strategy

Start date: Mar 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

EasyKey

Start date: Apr 2023
End date: Jan 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Cadent

Hydrogen Storage Feasibility Study

Start date: May 2023
End date: Sep 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Collaborative Visual Data Twin - Phase 2 (CVDT)

Start date: May 2023
End date: May 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Network Intelligence through Probabilistic Risk Assessment Methodology (NIPRAM) to improve electricity system restoration

Start date: Jul 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

HVT Appliance Development Business Case

Start date: Apr 2023
End date: Sep 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Autonomous Inspection & Monitoring of High Voltage Assets (AIM High)

Start date: Jun 2023
End date: Oct 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Vulnerability Visualisation Tool Phase 2

Start date: Mar 2023
End date: Mar 2024
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Stopple Testing to 100% Hydrogen

Start date: Jun 2023
End date: Sep 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Model-driven Strategy for Balancing Optimisation (MSBO)

Start date: Apr 2023
End date: Jun 2024
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

AGI Pipework Integrity Monitoring for Hydrogen – Phase 1

Start date: Jun 2023
End date: Dec 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Probabilistic Projections

Start date: Jun 2023
End date: Dec 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Characteristics of hydrogen and natural gas blends in the NTS

Start date: Jun 2023
End date: May 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Hydrogen Technical and Safety Case for Domestic Heat

Start date: Apr 2023
End date: Aug 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Network Diversification & Resilience

Start date: Aug 2023
End date: Nov 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Net Zero Infrastructure Planning - Risks & Opportunities

Start date: Jun 2023
End date: Oct 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Understanding the Whole System Impacts of Nuclear Co-Generation on Electricity Transmission Infrastructure

Start date: Aug 2023
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Gas Control System – Impact Assessment (Future requirements)

Start date: Jun 2023
End date: Jan 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Domestic Hydrogen Sensor Research

Start date: Jun 2023
End date: Feb 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

MASiP- Digital Integrated Monitoring System

Start date: Sep 2023
End date: Dec 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Vorte Heating Solution

Start date: Aug 2023
End date: Jan 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Hydrogen Fuel Gas for GTs – Emissions Impact

Start date: Jul 2023
End date: Nov 2023
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Impact of Hydrogen on NTS Oils & Greases – Phase 1

Start date: Jul 2023
End date: Jan 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Impact of Hydrogen on NTS actuators

Start date: Jul 2023
End date: Jul 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

National Gas Customer Centricity

Start date: Jul 2023
End date: Jul 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Dispatch Optimiser Transformation (DOT)

Start date: Jul 2023
End date: Dec 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Forecasting the Risk of Congestion

Start date: Jun 2023
End date: Dec 2023
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Aerial inspections of OHLs from Beyond Visual Line of Sight (BVLOS)

Start date: Mar 2024
End date: Dec 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Supporting Off-Grid Communities

Start date: Jul 2023
End date: Aug 2024
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

RealSim: Real-Time Phasor-EMT Simulations

Start date: Jun 2023
End date: Nov 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

OHL Collision Avoidance

Start date: Aug 2023
End date: Feb 2025
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Northern Powergrid

Demand Flexibility Service Evaluation

Start date: May 2023
End date: Apr 2024
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

QWID FLEXER

Start date: Sep 2023
End date: Feb 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Compressor Fleet Failure Mode and Effects Analysis for Hydrogen

Start date: Sep 2023
End date: May 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

New Approach to Losses

Start date: Sep 2023
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

Hydrogen compatibility of components - Phase 2: Further analysis

Start date: Aug 2023
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Data-Driven Online Monitoring and Early Warning for GB System Stability (DOME)

Start date: Jul 2023
End date: Dec 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Alternative Metering (Baselines)

Start date: Sep 2023
End date: Mar 2024
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Satelline

Start date: Sep 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
UK Power Networks

Linepack opportunities in the current and future energy system

Start date: Sep 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

The Economics of Electrolysers Using Curtailed Electricity

Start date: Sep 2023
End date: Nov 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Lower Cost Excavation and Repair for Hydrogen Pipelines

Start date: Sep 2023
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Hy-Voltage

Start date: Oct 2023
End date: Sep 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Exploring the Economic Benefits of Co-optimising Procurement of Energy, Response and Reserve

Start date: Sep 2023
End date: Mar 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Dispersion of Helium Releases in Domestic Properties

Start date: Sep 2023
End date: Jul 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Hydrogen MOBs QRA and Testing Phase 3

Start date: Oct 2023
End date: Jun 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

HyNTS Dataset - Physical Data Extraction (ILI)

Start date: Oct 2023
End date: May 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

InterCast

Start date: Oct 2023
End date: Dec 2023
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Trial on Implementation of Wide Area Monitoring and Control System (WAMCS)

Start date: Sep 2023
End date: Aug 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

MinGFM

Start date: Sep 2023
End date: Feb 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Ancillary Components Product Suitability for Use with Hydrogen - Verification Evidence

Start date: Oct 2023
End date: May 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Hazardous Areas Impact Mitigation Phase 1

Start date: Nov 2023
End date: Jan 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Hydrogen MOBs Standards and Procedures Phase 4

Start date: Oct 2023
End date: Jun 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Additional Welfare Decision Tool Phase 2

Start date: Oct 2023
End date: Aug 2024
Status:
Live
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
Cadent

Great Britain Hydrogen Distribution QRA

Start date: Oct 2023
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Modelling Hydrogen Impact on Pipeline Steels (HIPS) – Phase 1

Start date: Dec 2023
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

BESS P28

Start date: Nov 2023
End date: Nov 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Northern Powergrid

Hydrogen Technical and Safety Case for Domestic Heat – Phase 2

Start date: Nov 2023
End date: Jan 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

VoltaVisor

Start date: Oct 2023
End date: Mar 2024
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Emissions Mitigations – Purging for a Hydrogen Future

Start date: Nov 2023
End date: May 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

FastOut

Start date: Oct 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

GB Inertia Forecasting with Regional Extrapolation

Start date: Dec 2023
End date: May 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Virtual Energy System: Common Socio-technical Framework Development

Start date: Nov 2023
End date: Feb 2024
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

MASiP H2 Technical & System Development

Start date: Dec 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Materials Qualification for Hydrogen TD1 Pipelines

Start date: Dec 2023
End date: Nov 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Hydrogen Farm of the Future

Start date: Feb 2024
End date: Nov 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Hydrogen Ignition Risk from Static & Autoignition - Stage 1

Start date: Dec 2023
End date: Mar 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Biomethane and Hydrogen Interactions

Start date: Dec 2023
End date: Aug 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Hydrogen Storage Legal Assessment

Start date: Nov 2023
End date: Jan 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Hydrogen Blending in LPG Feasibility Study

Start date: Jan 2024
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

APEX (Alternative Power for Equitable Communities)

Start date: Mar 2024
End date: Aug 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Demand Diversification Service for LMAs

Start date: Feb 2024
End date: Sep 2024
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

Pathfinder Development

Start date: Feb 2024
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

HVT Appliance Development – Phase 1

Start date: Oct 2023
End date: Dec 2023
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Generative AI Discovery

Start date: Feb 2024
End date: Mar 2024
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Carbon Transportation Technical Demonstration - Phase 1

Start date: Feb 2024
End date: Aug 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Network policies and procedures - Development roadmap

Start date: Feb 2024
End date: Aug 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Customer Demand Profiling for Hydrogen Networks

Start date: Jan 2024
End date: Apr 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Accessibility module for CO alarms (Phase 1)

Start date: Mar 2024
End date: Jul 2024
Strategy themes:
  • Supporting consumers in vulnerable situations
Funding mechanism:
  • NIA RIIO-2
SGN

Connected Island

Start date: Apr 2024
End date: Dec 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SP Energy Networks Distribution

IGEM Downstream Hydrogen Standards Development

Start date: Mar 2024
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Hydrogen & Carbon Dryness Management

Start date: Apr 2024
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Green Hydrogen Production Impacts on Water Usage

Start date: Mar 2024
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

HVDC Assets Life Cycle Assessment (HVDC - LCA)

Start date: Apr 2024
End date: Jul 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Thermoplastic liners for Transmission Feasibility

Start date: Feb 2024
End date: May 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

AI Centre of Excellence – GB Energy Industry Data Science Fellowship

Start date: Feb 2024
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Market Signals for the Electrification of Heating

Start date: Mar 2024
End date: Jan 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Assessment for Suitability of Ventilation for Boiler Compartments

Start date: Mar 2024
End date: Aug 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Consequence Assessment of Internal Domestic Pipework Depressurisation

Start date: Apr 2024
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

HyDrive

Start date: Apr 2024
End date: Jan 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Energy Users: Regional Customer Archetypes (EUReCA)

Start date: May 2024
End date: Aug 2024
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
Northern Powergrid

Pre-heating Requirement for Hydrogen Transportation

Start date: May 2024
End date: Nov 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Equal LCTs

Start date: Feb 2024
End date: Nov 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Distribution

Hydrogen Technical and Safety Case for Domestic Heat – Phase 3

Start date: Apr 2024
End date: Sep 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Regional Whole Systems Strategic Planning (RWSSP) Methodology: Problem Statement Development

Start date: Mar 2024
End date: Jul 2024
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

1mol% oxygen on the National Transmission System

Start date: Jun 2024
End date: Aug 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Below 7 barg PRI Suitability Assessment

Start date: Jun 2024
End date: Jan 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Gas Separation within UK Gas Networks

Start date: May 2024
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

New Aspects of Trading to Understand Risks to the Environment (NATURE)​

Start date: Jun 2024
End date: Dec 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission

Transitioning and Repurposing Oil Pipelines for Hydrogen (TROPHy)

Start date: May 2024
End date: Dec 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Electrolyser Horizons: Unveiling the Techno-economic Landscape for Sustainable Hydrogen Production in GB.

Start date: May 2024
End date: Feb 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

High Temperature Low Sag Conductors (HTLS) Non-Destructive Inspection Device

Start date: Jun 2024
End date: Feb 2025
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Scottish and Southern Electricity Networks Transmission

Hydrogen Ignition Risk from Static & Autoignition - Stage 2a

Start date: Jun 2024
End date: Sep 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Hazardous Areas Impact Mitigations (HAIM) Phase 2

Start date: Jul 2024
End date: Dec 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

NDT Fatigue crack growth rate of hydrogen pipelines

Start date: Jun 2024
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Air (Oxygen) Ingress in Isolated Installations

Start date: Jun 2024
End date: Dec 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Application of LV Monitoring in Network Planning

Start date: Sep 2024
End date: Dec 2024
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Northern Powergrid

Strategic Education Roadmap

Start date: Jul 2024
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

MASiP H2– Technical Development

Start date: Jun 2024
End date: Dec 2024
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
SGN

Detecting LCTs from Smart Meter Consumption Data

Start date: Sep 2024
End date: Oct 2024
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
Northern Powergrid

Space Weather Impact for Future Electricity System Resilience (SWIFTER)

Start date: May 2024
End date: Jan 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Battery Storage Modelling for Enhanced Connection Assessments (BaTSeC)

Start date: May 2024
End date: Jan 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

H100 Quantitative Risk Assessment for Emergency Purging

Start date: Jun 2024
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

H100 Interference Damage Management Project

Start date: Sep 2024
End date: Jan 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Sensitive I&C Users for Strategic Hydrogen Network Planning

Start date: Sep 2024
End date: Feb 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Future Energy Innovation Scenarios

Start date: Aug 2024
End date: Sep 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

FastPress

Start date: Mar 2024
End date: Aug 2024
Status:
Live
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Hydrogen Behavioural Change

Start date: Sep 2024
End date: Dec 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

CHIP Composite Pipelines

Start date: Sep 2024
End date: Feb 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

NTS Materials Pipeline Assessment

Start date: Sep 2024
End date: Jan 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Gas Transmission PLC

Compatibility assessment of dispatch options with GB cross-border markets

Start date: Aug 2024
End date: Nov 2024
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Heat Networks - Optimising Stranded Assets

Start date: Sep 2024
End date: Feb 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Northern Gas Networks

Incorporating the impact of climate change in power system modelling

Start date: Apr 2024
End date: Apr 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Heat Network Transition Study

Start date: Oct 2024
End date: Feb 2025
Status:
Live
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • NIA RIIO-2
SGN

Dispatch Transparency Methodology

Start date: Oct 2024
End date: Jul 2024
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

H100 Design of Purging Trailer for Emergency Operations

Start date: Oct 2024
End date: Jan 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
SGN

Accelerating Progress

Start date: Nov 2024
End date: Feb 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
Wales & West Utilities

Quantitative assessment of self and central scheduling

Start date: Jul 2024
End date: Oct 2024
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Dispatch Decision Intelligence

Start date: Aug 2024
End date: Feb 2025
Status:
Live
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Centralised Strategic Network Plan Decision Making Tool (CSNP)

Start date: Nov 2024
End date: Jan 2025
Status:
Live
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Options for optimising GB Data Centres

Start date: Dec 2024
End date: Jan 2025
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Combined On-line Transformer Monitoring

Start date: Sep 2014
End date: Sep 2022
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Sentinel

Start date: Sep 2015
End date: Dec 2023
Status:
Live
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Cable Health Assessment - Low Voltage

Start date: Nov 2015
End date: Aug 2021
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Optimising Oil Regeneration for Transformers

Start date: Feb 2016
End date: Sep 2022
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Tap Changer Monitoring

Start date: Feb 2016
End date: May 2022
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Project Avatar

Start date: Oct 2016
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Stakeholder attitudes to electricity infrastructure

Start date: Oct 2013
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

SF6 Management and Alternative Gases

Start date: Mar 2015
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Investigation of transient and safety issues in gas insulated systems

Start date: Oct 2016
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Alternatives to SF6 for retro-filling existing equipment

Start date: Nov 2016
End date: Nov 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Frequency Response Analysis for Transformer Characterisation and Objective Interpretation of Results

Start date: Jan 2017
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Electric & Magnetic Fields Health & Safety (P60) 2017 -2021

Start date: Jan 2017
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Condition and Climatic Environment for Power Transformers (ConCEPT)

Start date: Sep 2017
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Transformer and Transformer Oil Life Optimisation and Management Through Analysis and Modelling

Start date: Mar 2017
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Automated assessment of steelwork condition using innovative imaging techniques

Start date: Sep 2017
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EZ valve: Live Insertion of Pipeline Isolation Valves on Risers

Start date: Sep 2016
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Connecting homes for health

Start date: Dec 2016
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Squeeze free flow stopping on PE mains

Start date: Sep 2017
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Vonaq Utility Pole Strength Measurement

Start date: Apr 2015
End date: Oct 2016
Status:
Live
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Integrated substation Condition Monitoring (ISCM)

Start date: Apr 2015
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

FORESIGHT – LV pre-fault recognition and management

Start date: Oct 2015
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Vehicle to Grid (V2G) - the network impact of grid-integrated vehicles.

Start date: May 2017
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Silent Night – Hybrid EV Generator

Start date: May 2017
End date: Jul 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Integrel – Baseline Implementation

Start date: Jul 2017
End date: Jul 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Microresilience

Start date: Sep 2017
End date: Sep 2020
Status:
Live
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Customer-Led Distribution System

Start date: Sep 2017
End date: Jun 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Olympic Rings for RIIO

Start date: Sep 2014
End date: Nov 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Mains and Service Replacement through Keyhole

Start date: Jul 2014
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Cured In-Place Pipe (CIPP) (Stage 3)

Start date: Oct 2015
End date: Apr 2022
Funding mechanism:
  • Network Innovation Allowance
SGN

Small Diameter PE Flowstop

Start date: May 2016
End date: Nov 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

100% Hydrogen

Start date: Jan 2017
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

IGEM Gas Quality Standard Working Group

Start date: Jan 2017
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

Forged Carbon Fiber Products (FCFP) - Stage 1

Start date: Mar 2017
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Partial Discharge Monitoring to Reduce Safety Criticality

Start date: Jan 2015
End date: Oct 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Transmission System Fault Level Monitoring

Start date: Jun 2017
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Linkbox Monitoring using Narrow Band IoT

Start date: Dec 2017
End date: Dec 2019
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Mini-Mole

Start date: Apr 2015
End date: Sep 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

EVOLUTION

Start date: Dec 2015
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

SINE Post

Start date: Jan 2017
End date: Jan 2021
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Active Fault Level Management (AFLM)

Start date: Feb 2017
End date: Mar 2024
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Secondary Communications Phase 2 - Consultancy Engagement

Start date: Jan 2017
End date: Jan 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Instrument for the identification of Live and Not Live HV and LV cables

Start date: May 2017
End date: Nov 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Weather Normalised Demand Analytics (WANDA)

Start date: Aug 2017
End date: Dec 2018
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Connected Worker Phase 1 - Field Data Automated Capture

Start date: Oct 2017
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Endbox G38 Level Detection Phase 2

Start date: Oct 2017
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Low Cost Fault Current Measurement of Wooden Poles

Start date: Nov 2017
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Managing uncertainty in future load-related investment

Start date: Feb 2016
End date: Dec 2019
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

Trial of Open Innovation Model in the Utilities Sector

Start date: Oct 2015
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

The Planning Data Exchange System between Network Licensees to Enable a Smarter Grid

Start date: Jan 2017
End date: Jan 2022
Status:
Live
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Transmission

11kV power electronics providing reactive compensation for voltage control

Start date: Jun 2016
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Low Voltage Network Modelling and Analysis Environment

Start date: Jun 2011
End date: Oct 2012
Funding mechanism:
  • LCNF Tier 1
Scottish and Southern Electricity Networks Distribution

Low Voltage Network Solutions

Start date: Apr 2011
End date: Mar 2014
Funding mechanism:
  • LCNF Tier 1
Electricity North West

Low Voltage Current Sensor Technology Evaluation

Start date: Dec 2011
End date: Jun 2013
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

Trial of Orkney Energy Storage Park (Phase 2)

Start date: Oct 2011
End date: Aug 2012
Funding mechanism:
  • LCNF Tier 1
Scottish and Southern Electricity Networks Distribution

Seasonal Generation Deployment

Start date: Jan 2011
End date: Apr 2013
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

Early Learning of Low Voltage Network Impacts from Estate PV Cluster

Start date: Jul 2011
End date: Feb 2013
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

Demonstrating the Functionality of Automated Demand Response

Start date: Jun 2011
End date: Aug 2012
Funding mechanism:
  • LCNF Tier 1
Scottish and Southern Electricity Networks Distribution

Voltage Management on Low Voltage Busbars

Start date: Apr 2011
End date: Oct 2013
Funding mechanism:
  • LCNF Tier 1
Electricity North West

Clyde Gateway

Start date: Jan 2012
End date: Mar 2014
Funding mechanism:
  • LCNF Tier 1
SP Energy Networks Transmission

Voltage Control System Demonstration Project

Start date: Mar 2014
End date: Mar 2015
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

Hook Norton Low Carbon Community Smart Grid

Start date: Feb 2012
End date: Oct 2013
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

Photovoltaic Impact on Surburban Networks

Start date: Nov 2012
End date: Nov 2013
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

Ashton Hayes Smart Village

Start date: Jan 2012
End date: Oct 2013
Funding mechanism:
  • LCNF Tier 1
SP Energy Networks Transmission

Network Management on the Isles of Scilly

Start date: Aug 2012
End date: Aug 2013
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

The Bidoyng Smart Fuse

Start date: Jan 2012
End date: Dec 2014
Funding mechanism:
  • LCNF Tier 1
Electricity North West

Interconnection of WPD and NGC SCADA Systems

Start date: Dec 2011
End date: Dec 2012
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

Trial Evaluation of Domestic Demand Side Management (DDSM)

Start date: Oct 2010
End date: Aug 2012
Funding mechanism:
  • LCNF Tier 1
Scottish and Southern Electricity Networks Distribution

Demonstrating the Benefits of Monitoring Low Voltage Network with Embedded PV Panels and EV Charging Point

Start date: Sep 2010
End date: Oct 2011
Funding mechanism:
  • LCNF Tier 1
Scottish and Southern Electricity Networks Distribution

1MW Shetland NaS Battery

Start date: Sep 2010
End date: Mar 2014
Funding mechanism:
  • LCNF Tier 1
Scottish and Southern Electricity Networks Distribution

Implementation of Real-Time Thermal Ratings

Start date: Jan 2012
End date: Jun 2013
Funding mechanism:
  • LCNF Tier 1
SP Energy Networks Transmission

SoLa Bristol

Start date: Dec 2011
End date: Jan 2015
Funding mechanism:
  • LCNF Tier 2
National Grid Electricity Distribution

Flexible Approaches for Low Carbon Optimised Networks (FALCON)

Start date: Nov 2011
End date: Sep 2015
Funding mechanism:
  • LCNF Tier 2
National Grid Electricity Distribution

Thames Valley Vision

Start date: Jan 2012
End date: Mar 2017
Funding mechanism:
  • LCNF Tier 2
Scottish and Southern Electricity Networks Distribution

Capacity to Customers

Start date: Jan 2012
End date: Dec 2014
Funding mechanism:
  • LCNF Tier 2
Electricity North West

Flexible Networks for a Low Carbon Future

Start date: Jan 2012
End date: Dec 2014
Funding mechanism:
  • LCNF Tier 2
SP Energy Networks Transmission

Low Voltage Network Templates

Start date: Apr 2011
End date: Jul 2013
Funding mechanism:
  • LCNF Tier 2
National Grid Electricity Distribution

Northern Isles New Energy Solutions (NINES)

Start date: Nov 2011
End date: Dec 2013
Funding mechanism:
  • LCNF Tier 2
Scottish and Southern Electricity Networks Distribution

Lincolnshire Low Carbon Hub

Start date: Jan 2012
End date: Feb 2015
Funding mechanism:
  • LCNF Tier 2
National Grid Electricity Distribution

Accelerating Renewable Connections (ARC)

Start date: Jan 2013
End date: Dec 2016
Funding mechanism:
  • LCNF Tier 2
SP Energy Networks Transmission

Customer Load Active System Services (CLASS)

Start date: Jan 2013
End date: Sep 2015
Funding mechanism:
  • LCNF Tier 2
Electricity North West

FLEXDGRID - Advanced Fault Level Management in Birmingham

Start date: Dec 2012
End date: Mar 2017
Funding mechanism:
  • LCNF Tier 2
National Grid Electricity Distribution

My Electric Avenue (I²EV)

Start date: Jan 2013
End date: Dec 2015
Funding mechanism:
  • LCNF Tier 2
Scottish and Southern Electricity Networks Distribution

Orkney Energy Storage Park (Phase 1)

Start date: Jun 2012
End date: Mar 2015
Funding mechanism:
  • LCNF Tier 1
Scottish and Southern Electricity Networks Distribution

Low Voltage (LV) Network Connected Energy Storage

Start date: Jan 2012
End date: Mar 2014
Funding mechanism:
  • LCNF Tier 1
Scottish and Southern Electricity Networks Distribution

Active Network Management with Hydro Generation

Start date: Mar 2012
End date: Dec 2014
Funding mechanism:
  • LCNF Tier 1
SP Energy Networks Transmission

Temperature Monitoring Windfarm Cable Circuits

Start date: Oct 2012
End date: Mar 2015
Funding mechanism:
  • LCNF Tier 1
SP Energy Networks Transmission

Community Energy Action

Start date: Oct 2012
End date: May 2014
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

Implementation of an Active Fault Level Management Scheme

Start date: Feb 2012
End date: Dec 2014
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

Smart Urban Low Voltage Network

Start date: Jul 2012
End date: Mar 2015
Funding mechanism:
  • LCNF Tier 1
UK Power Networks

Accelerated Network Modelling

Start date: Apr 2010
End date: Mar 2011
Funding mechanism:
  • IFI
Electricity North West

Chromatic Oil Analysis (Phase 2)

Start date: Jul 2009
End date: Feb 2010
Funding mechanism:
  • IFI
Electricity North West

Customer Research

Start date: Nov 2011
End date: Mar 2013
Funding mechanism:
  • IFI
Electricity North West

Demand Control

Start date: Oct 2011
End date: Jan 2012
Funding mechanism:
  • IFI
Electricity North West

Distribution Transformer Real Time Thermal Ratings

Start date: Apr 2011
End date: Mar 2015
Funding mechanism:
  • IFI
Electricity North West

Dynamic Line Rating

Start date: Dec 2009
End date: Jun 2011
Funding mechanism:
  • IFI
Electricity North West

Earthing

Start date: Apr 2005
End date: Mar 2011
Funding mechanism:
  • IFI
Electricity North West

EA Technology Forums

Start date: Apr 2009
End date: Mar 2015
Funding mechanism:
  • IFI
Electricity North West

Electricity Supply Research (ESR) Network

Start date: Sep 2010
End date: Aug 2012
Funding mechanism:
  • IFI
Electricity North West

ENA Recharges

Start date: Jun 2011
End date: Jul 2011
Funding mechanism:
  • IFI
Electricity North West

CBRM Extension (Wood Pole Over Head Lines and Distribution Substations - Stages 2 &3)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

CBRM Load Related Risk

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Demand-Side Management and Risk

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Collaborative ENA Research & Development Programme

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Engineers Forums: Cable, Overhead Line (OHL), Plant and Protection

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Environmental Monitoring of Distribution Substations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Failure on Demand

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Ground Mounted Fault Passage Indicator

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

High Voltage to Low Voltage Transfer Potentials

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Live Alert

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

132kV Insulated Composite Crossarm Trial

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Advanced Radio Control

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Aluminium Carbon Core Conductor (ACCC)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Assessment of Conducrete

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

BMW Electric Car

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

ENA Research & Development Programme

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Collapse Prediction Relay

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Corvid Behaviour Study

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

DECC Smart Capital Grant Comms Hub

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Surenet LV Sure

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

3 Live Alert – Energised Alert

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

3rd Party Rise Of Earth Potential (ROEP) Risk Assessment

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

4 PURL2

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Alternative Insulating Oils (Phase 1)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

BT 21st Century Protection Solutions (BT21CN)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Cable Identification Devices

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Energy Storage Project

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Electric Power Research Insitute (EPRI)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

ESRI Powerfactory

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Active Distribution Networks with Full Integration of Demand and Distributed Energy Resources (ADDRESS)

Start date: Apr 2008
End date: Mar 2009
Funding mechanism:
  • IFI
UK Power Networks

Autonomous Regional Active Network Management System (AURA NMS)

Start date: Apr 2006
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Automated Asset Registration

Start date: Apr 2011
End date: Mar 2012
Funding mechanism:
  • IFI
UK Power Networks

Automated Long Term Development Statement (LTDS) Diagrams

Start date: Apr 2011
End date: Mar 2012
Funding mechanism:
  • IFI
UK Power Networks

Bankside Heat Transfer

Start date: Apr 2006
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Collaborative ENA Research & Development Programme

Start date: Apr 2006
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Distribution Network Visibility

Start date: Apr 2010
End date: Mar 2013
Funding mechanism:
  • IFI
UK Power Networks

Earthing Information System

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Growth in City Centres

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Helicopter Mounted Partial Discharge Locator

Start date: Apr 2010
End date: Mar 2013
Funding mechanism:
  • IFI
UK Power Networks

Active Fault Current Management

Start date: Apr 2008
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Climate Change and Seasonal Variation Impacts on Electrical Earthing Installations

Start date: Jan 2005
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Dynamic Ratings

Start date: Apr 2008
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Partial Discharge Project and Forum

Start date: Apr 2008
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Protective Coatings Forum

Start date: Apr 2008
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Integrated Condition Based Risk Management

Start date: Apr 2010
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Strategic Technology Programme Module 3 Cable Networks

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Strategic Technology Programme Module 5 Distributed Energy Resources

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Strategic Technology Programme Module 2 Overhead Line

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Strategic Technology Programme Module 4 Substations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Effect of Electric Vehicles on Distribution Networks

Start date: Apr 2008
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Collaborative ENA Research & Development Programme

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Environmental Monitoring of Fluid Filled Cables

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Harmonic Cable Modelling

Start date: Oct 2009
End date: Jan 2010
Funding mechanism:
  • IFI
Electricity North West

Live Alert

Start date: Dec 2009
End date: Dec 2010
Funding mechanism:
  • IFI
Electricity North West

Load Allocation

Start date: Apr 2011
End date: Jul 2012
Funding mechanism:
  • IFI
Electricity North West

Load Flow

Start date: May 2010
End date: Nov 2011
Funding mechanism:
  • IFI
Electricity North West

Load Related Risk Methodology

Start date: Aug 2011
End date: Sep 2011
Funding mechanism:
  • IFI
Electricity North West

Network Risk (Phase 2)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Low Voltage (LV) Network Automation

Start date: Apr 2011
End date: Mar 2013
Funding mechanism:
  • IFI
Electricity North West

Modular Rezap Fault Master

Start date: Jul 2006
End date: Sep 2008
Funding mechanism:
  • IFI
Electricity North West

Protective Coatings Forum

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Partial Discharge User Group

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Strategic Technology Programme Module 5 Distributed Energy Resources

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Stay Rod Testing

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Detecting Distributed Generation Stage 1

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Distributed Generation and ARM Strathclyde

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Distribution Dynamic Line Rating

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Ecoplugs

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Evaluation of FORD Focus / Tourneo Electric Vehicle on Network

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Lynx Kelvatek LV Switch

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

LV Fault Location Devices

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

LV Jumpers with Integral CB

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

IEC 61850 Application in SP Transmission

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

Nanodielectrics

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

High Performance Computing Technologies for Smart Distributed Network Operation (HiPerDNO)

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Increased Capacity from Existing Overhead Line Routes

Start date: Apr 2013
End date: Mar 2014
Funding mechanism:
  • IFI
UK Power Networks

Low Carbon Scenario Modelling

Start date: Apr 2011
End date: Mar 2012
Funding mechanism:
  • IFI
UK Power Networks

LV Remote Control and Automation

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

National Underground Assets Group (NUAG)

Start date: Apr 2011
End date: Mar 2012
Funding mechanism:
  • IFI
UK Power Networks

NaFIRS Analysis

Start date: Feb 2012
End date: Jun 2012
Funding mechanism:
  • IFI
Electricity North West

Oil Regeneration

Start date: Nov 2011
End date: Nov 2016
Funding mechanism:
  • IFI
Electricity North West

OLTC Monitoring

Start date: Jul 2009
End date: Mar 2010
Funding mechanism:
  • IFI
Electricity North West

Overhead Line Fault Location

Start date: Feb 2012
End date: Feb 2013
Funding mechanism:
  • IFI
Electricity North West

Pole Mounted Fault / Load Monitor

Start date: Apr 2006
End date: Mar 2015
Funding mechanism:
  • IFI
Electricity North West

Polymeric Investigation

Start date: Apr 2009
End date: Mar 2011
Funding mechanism:
  • IFI
Electricity North West

Stay Anchor Testing Using Magnetostrictive Sensor Measurements

Start date: Dec 2010
End date: Mar 2011
Funding mechanism:
  • IFI
Electricity North West

Storage

Start date: Jan 2011
End date: Jan 2014
Funding mechanism:
  • IFI
Electricity North West

Strategic Technology Programme Module 3 Cable Networks

Start date: Apr 2009
End date: Mar 2015
Funding mechanism:
  • IFI
Electricity North West

Strategic Technology Programme Module 5 Distributed Energy Resources

Start date: Apr 2009
End date: Mar 2015
Funding mechanism:
  • IFI
Electricity North West

Strategic Technology Programme Module 2 Overhead Line

Start date: Apr 2009
End date: Mar 2015
Funding mechanism:
  • IFI
Electricity North West

Strategic Technology Programme Module 4 Substations

Start date: Apr 2009
End date: Mar 2015
Funding mechanism:
  • IFI
Electricity North West

Superconducting Fault Current Limiter (SFCL)

Start date: Feb 2006
End date: Jan 2009
Funding mechanism:
  • IFI
Electricity North West

Thermodynamic Models Options for Upgrading Cooling for Distribution Transformer

Start date: Apr 2011
End date: Jul 2012
Funding mechanism:
  • IFI
Electricity North West

Transducer Accuracy

Start date: Apr 2011
End date: Dec 2012
Funding mechanism:
  • IFI
Electricity North West

Strategic Technology Programme Module 2 Overhead Line

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Strategic Technology Programme Module 3 Cable Networks

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Strategic Technology Programme Module 4 Substations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Superconducting Fault Current Limiter

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Supergen FlexNet

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Tree Growth Regulator

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Flow Battery Trial

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

GIS Tree Clearance

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Heat Pump Load Profile

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Helicopter Mounted Partial Discharge Detection

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Power Networks Research Academy

Start date: Jan 2008
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Insulated Composite Crossarm

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Line Mounted Sensor Assessment

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Live Line Tree Felling

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Low Voltage (LV) Connected Batteries

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Microplanet Low Voltage Regulator

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Mobile Condition Monitoring System for Open Busbar Transmission Substations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Mobile Sync GVR

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Nano Composite HVDC Insulation

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Orkney Active Network Management

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Orkney Active Power Network

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Orkney Active Power Network Voltage Control

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Overhead Line Sensor- FMC Tech

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Partial Discharge User Group

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Plugged in Places

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Power Networks Demo Centre (PNDC)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Power Line Carrier Trial Installation and Assessment

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Protective Coatings Forum

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Radio Tele Switching (RTS) Assessment

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

ROCOF Protection Alternative

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Smart Analytics

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Strategic Technology Programme Module 2 Overhead Line

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Strategic Technology Programme Module 3 Cable Networks

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Strategic Technology Programme Module 5 Distributed Energy Resources

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Strategic Technology Programme Module 4 Substations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Supergen Flexnet

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Supergen HiDEF

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Supply Point Monitoring

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Surenet LV Sure

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Tell US GIS

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Tree Growth Regulator

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Trip Timing Module

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Ultra TEV Alarm

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

VOAS Optical Current Transformer

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Wide Area Monitoring Protection & Control (WAMPAC)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

Offline Planning Tool for Dynamic Thermal Rating

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Partial Discharge Monitoring in Supergrid Transformers

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

PD Monitoring of Cables (11 & 33kV)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Power Network Demonstration Centre (PNDC)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Psymetrix ACAM Phase 1

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Scottish Power Advanced Research Centre (SPARC)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Sensor Networks (Smart Dust) Phase 2

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Strategic Technology Programme Module 2 Overhead Line

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Strategic Technology Programme Module 3 Cable Networks

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Strategic Technology Programme Module 4 Substations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Strategic Technology Programme Module 5 Distributed Energy Resources

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Strategic Asset Lifecycle Value Optimisation (SALVO)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Substation Earth Integrity Monitoring System

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Superconducting Fault Current Limiter (SFCL)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Supergen FlexNet

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Supergen HiDEF

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Transmission SSR & Harmonics

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

Vegetation Management ADAS

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Voltage Control ACTIV

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Online Condition Monitoring

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Overhead Line Incipient Fault Location

Start date: Apr 2013
End date: Mar 2014
Funding mechanism:
  • IFI
UK Power Networks

Power Networks Research Academy

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Radio Frequency (RF) Mesh for Smart Grid Communications

Start date: Apr 2011
End date: Mar 2012
Funding mechanism:
  • IFI
UK Power Networks

Strategic Technology Programme Module 2 Overhead Line

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Strategic Technology Programme Module 4 Substations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Strategic Technology Programme Module 5 Distributed Energy Resources

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Supergen FlexNet

Start date: Jan 2007
End date: Jan 2011
Funding mechanism:
  • IFI
UK Power Networks

Supergen 3 HiDEF Highly Distributed Energy Futures

Start date: Apr 2010
End date: Mar 2013
Funding mechanism:
  • IFI
UK Power Networks

Sustainable Asset Risk and Prioritisation Modelling

Start date: Apr 2011
End date: Mar 2013
Funding mechanism:
  • IFI
UK Power Networks

Transformer Design for FR3

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Tree Growth Regulator

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Urban Transformer Substation

Start date: Apr 2011
End date: Mar 2013
Funding mechanism:
  • IFI
UK Power Networks

Vegetation Management ADAS

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Helicopter Mounted Partial Discharge Detection

Start date: Apr 2008
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Tree Growth Regulator

Start date: Apr 2008
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Distribution

SuperGen HiDef

Start date: Apr 2010
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Understanding Networks with High Penetrations of Distributed Generation and other Low Carbon Technologies

Start date: Apr 2008
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Substation Communication Development

Start date: Apr 2008
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Vegetation Management ADAS

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Transient Fault Detection from Disturbance Recorders

Start date: Apr 2008
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Technical Assessment of Power Quality Issues

Start date: Apr 2010
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Harmonic Detection and Analysis

Start date: Apr 2010
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Network Unbalance Source Detection by Optimum Monitoring

Start date: Apr 2010
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Power Communications Meter

Start date: Apr 2008
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Sensor Networks (Smart Dust)

Start date: Apr 2008
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Power Networks Research Academy

Start date: Apr 2008
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Urban Heat Island Study (KTP)

Start date: Apr 2008
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Distribution

OLTC Tap Changer Monitor

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Voltage Optimisation 11kV Network

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Investigating Balancing of LV Networks

Start date: Apr 2010
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Phasor Measurement Trial

Start date: Apr 2010
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Smart Grid Equipment – LV Link Box Monitoring

Start date: Apr 2010
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Smart Grid Design

Start date: Apr 2010
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Switchgear De-rating

Start date: Apr 2010
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Supergen FlexNet

Start date: Apr 2008
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Second Life Car Batteries

Start date: Apr 2011
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Generating Value from Smart Meter Data

Start date: Apr 2011
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Wide Area Monitoring Protection & Control (WAMPAC)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Strategic Technology Programme Module 3 Cable Networks

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Microshock PPE Development

Start date: Jun 2009
End date: Sep 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Development of Probabilistic Risk Assessment Procedure for Earthing Systems

Start date: Oct 2010
End date: Sep 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

High Level Indoor Isolator Access

Start date: Dec 2010
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Fixed Maintenance Earth (FME) - Development of Handling Techniques and Tools

Start date: Dec 2010
End date: Dec 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

JW420 - Developing Improved Maintenance Tools and Techniques

Start date: Jun 2011
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

33Kv Voltage Transformer (VT) Shutter Locking Device

Start date: Sep 2010
End date: May 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

OB 14 Blast Valve Lifting Rig

Start date: May 2010
End date: Mar 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

GA ABCB Slow Closing Device

Start date: Nov 2010
End date: Sep 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Fault Current Distribution in New Type of EHV cables

Start date: Dec 2008
End date: May 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Exported Potentials and Profiles Around Earth Electrodes and Opposite-Side Injection for Large-Area Earthing Systems

Start date: Jan 2011
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Rapid Deployment Ballistic Screen

Start date: Jul 2011
End date: Sep 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

NSI5 Earthing Improvements

Start date: Sep 2008
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Air Receiver Inspection Cover Hinge

Start date: Mar 2012
End date: Sep 2021
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Bascules and Safety Gate Accessories

Start date: Mar 2012
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Portable Earthing Trailer

Start date: Sep 2007
End date: Sep 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Mobile Transformer Assessment Clinic

Start date: Mar 2011
End date: Sep 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

OHL Data Collection (Original Title - Data Visualisation)

Start date: Oct 2011
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Magnetic Models for Transformers Transformer Core Modelling

Start date: Oct 2007
End date: Dec 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Development of Multi Response Stockbridge Damper at 400kV

Start date: Feb 2010
End date: May 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Further Development of PFT in Service Cable Oil Leak Location Technique

Start date: Mar 2009
End date: Mar 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

SALVO

Start date: Dec 2011
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Impact of Extending Operational Lifetimes of Electromechanical Relays

Start date: Nov 2011
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Improved Transformer Thermal Monitoring

Start date: Oct 2010
End date: Nov 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Development of OHL Hot Joint Monitoring Tool

Start date: Nov 2010
End date: Dec 2023
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Use of Fibre Optics in Substations to Detect Noise

Start date: Oct 2007
End date: Apr 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Transformer and System Reliability

Start date: Oct 2010
End date: Dec 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Oil-less DGA Sampling (Prospective Trial)

Start date: Feb 2011
End date: Nov 2023
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Tapchanger Spring Measuring Device

Start date: May 2010
End date: Nov 2023
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Transformer Oil Passivation and Impact of Corrosive Sulphur (TOPICS)

Start date: Feb 2008
End date: Aug 2008
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Wireless Condition Monitoring Sensors with Integrated Diagnostics

Start date: Jul 2011
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Voltage Optimiser Pilot

Start date: Jan 2004
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

A Probabilistic Wind & Ice Map for the UK

Start date: Aug 2011
End date: Dec 2023
Funding mechanism:
  • IFI
National Energy System Operator

In-situ Remediation of OHL Tower Steelwork

Start date: Jan 2012
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

GIC DGA Monitoring and Alerting

Start date: Feb 2008
End date: Feb 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Non Conventional Current Sensors

Start date: Oct 2009
End date: Sep 2013
Funding mechanism:
  • IFI
National Energy System Operator

Detection and Measurement of ACSR Corrosion

Start date: Oct 2013
End date: Oct 2019
Funding mechanism:
  • IFI
National Energy System Operator

Measuring Alcohols to Determine Early Stages of Cellulosic Insulation Degradation

Start date: Oct 2013
End date: Oct 2019
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Partial Discharge Monitoring of DC Cable (DCPD)

Start date: Nov 2011
End date: Dec 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Transformer Lifetime Modelling

Start date: Sep 2011
End date: Sep 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Effective Protective Coatings for OHL Towers

Start date: Apr 2007
End date: Apr 1951
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Phase III Centrifuge Modelling and Field Monitoring of Wind Induced Loads on Transmission Towers

Start date: Oct 2007
End date: Oct 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

OHL Conductor Asset Lives

Start date: Jan 2008
End date: Sep 2023
Funding mechanism:
  • IFI
National Grid Electricity Transmission

HVDC EngD - Richard Poole

Start date: Jan 2012
End date: Jan 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Voltage Transformer Comparison

Start date: Feb 2007
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Architecture for Substation Secondary System (AS3) Project

Start date: Apr 2010
End date: Mar 2011
Funding mechanism:
  • IFI
National Energy System Operator

Protection Performance Study for IEC61850 Process Bus Architecture of Substation Secondary Systems (AS3)

Start date: Aug 2004
End date: Dec 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Alternative Bus Bar Protection Solution

Start date: Mar 2011
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Design of a Smart Tool for Detecting Hidden Errors in Protection Setting Files

Start date: Jan 2011
End date: Mar 2016
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Sustainability First - Smart Demand Forum

Start date: Nov 2008
End date: Mar 2014
Funding mechanism:
  • IFI
National Energy System Operator

Acoustic Emissions from HV Overhead Conductors

Start date: Oct 2011
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Optimising the Operation of an Integrated DC Link within an AC System

Start date: Jul 2011
End date: Dec 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Composite Cross Arms Study

Start date: Jun 2007
End date: Oct 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Ratings of Cables in Tunnels (RoCiT)

Start date: Aug 2007
End date: Dec 2023
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Overhead Line Robotic Technology

Start date: Oct 2005
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Live Working in Substations (Feasibility Study)

Start date: Jan 2012
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Finite Element Analysis for Ratings (FEAR)

Start date: Sep 2004
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Oil/Paper Insulation HVDC Performance

Start date: Oct 2010
End date: Sep 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Electromagnetic Transients (EMT) in Future Power Systems – Phenomena, Stresses & Modelling

Start date: May 2008
End date: Dec 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Control of Cable Tunnel Ventilation (CCTV)

Start date: Jul 2011
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

ESO Future Transmission System Stability Analysis

Start date: Sep 2011
End date: Jan 2012
Funding mechanism:
  • IFI
National Energy System Operator

Constraint and Reserve Optimisation for Wind Generation (CROW)

Start date: Oct 2011
End date: Oct 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Test of Multi Terminal Voltage Sourced Converter (VSC) HVDC Control Strategies by Means of an Analogue Test Rig

Start date: Jan 2012
End date: Jun 2012
Funding mechanism:
  • IFI
National Energy System Operator

Flexible Rating Options for DC Operation (FRODO)

Start date: Mar 2008
End date: Mar 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Improve Reliability of Future System by Enabling Integration of New Generation

Start date: Apr 2007
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Satellite Based Loss of Mains (LoM)

Start date: Feb 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Scenario Scoping for DSM Price Signals

Start date: Jun 2011
End date: Dec 2011
Funding mechanism:
  • IFI
National Energy System Operator

Alternative Fluids for Transformers

Start date: Apr 2008
End date: Mar 2008
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Investigation Into the Performance of a Nano Coating for High Voltage Substation Insulation

Start date: Feb 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Non Conventional Instrument Transformers (NCIT) Pilot Project Closures

Start date: Mar 2011
End date: May 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Polymeric Insulation Evaluation

Start date: Sep 2007
End date: Jun 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

33kV Fault Current Limiter

Start date: Sep 2011
End date: May 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Trial & Performance Assessment of ACCR Conductor (3M)

Start date: Sep 2011
End date: Sep 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

FEA Modelling of Current Transformers with Composite Insulators in Various Rigid Busbar Configurations

Start date: Jan 2010
End date: Jan 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Enhanced Lubrication for National Grid HV Maintenance

Start date: Sep 2008
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Long Term Performance of Silicone Based Composite Insulators

Start date: Aug 2008
End date: Apr 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Power Cable Materials Related TSB Project: Sustainable Power Cable Materials Technologies with Improved Whole Life Performance

Start date: Apr 2009
End date: Aug 2008
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Electric Power Research Insititute (EPRI) Substations

Start date: Mar 2006
End date: Oct 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Power Networks Research Academy

Start date: Jan 2004
End date: Feb 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

SuperGen – HiDEF (Highly Distributed Energy Future)

Start date: Mar 2009
End date: Mar 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

European FP7 Projects - Real Smart

Start date: Nov 2007
End date: Dec 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

European FP7 Projects - iTESLA

Start date: Nov 2011
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Resilient Electricity Networks for Great Britain (RESNET)

Start date: Oct 2007
End date: Sep 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Supergen FlexNet

Start date: May 2008
End date: Aug 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Electric and Magnetic Fields and Health

Start date: Feb 2009
End date: Jul 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

TSO - DNO Real Time Data Exchange for Smartgrid Operation

Start date: Jun 2006
End date: Mar 2011
Funding mechanism:
  • IFI
National Energy System Operator

Voltage Transducers for Power Quality Measurements

Start date: Nov 2008
End date: Sep 2011
Funding mechanism:
  • IFI
National Energy System Operator

SmartZone Project

Start date: Dec 2007
End date: Mar 2016
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Quantifying Benefits and Risks of Applying Advanced Network Control and Demand Response Technologies to Enhance Transmission Network Performance

Start date: Jul 2011
End date: Oct 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Fault Management of the Multi-terminal VSC HVDC using Delayed Auto-Re- Configuration (DARC) Schemes

Start date: Oct 2006
End date: Sep 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Simulation of Multi-Terminal VSC HVDC System by Means of Real Time Digital Simulator (RTDS)

Start date: Mar 2009
End date: Mar 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Future Real Time Demand Forecasting

Start date: Sep 2011
End date: Dec 2011
Funding mechanism:
  • IFI
National Energy System Operator

A Combined Approach to Wind Profile Prediction

Start date: Sep 2011
End date: Sep 2014
Funding mechanism:
  • IFI
National Energy System Operator

Multi-terminal VSC HVDC Operation, Control and AC System Integration

Start date: Oct 2011
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

MI HVDC Cable Load Cycling

Start date: Jan 2009
End date: Oct 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Development of Advanced Line-Commutated Converter (LCC) HVDC Model for System Studies

Start date: Aug 2008
End date: Jun 2012
Funding mechanism:
  • IFI
National Energy System Operator

Strategic Research & Development (Programme)

Start date: Jan 2012
End date: Oct 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Distribution Transformer with On-Load Tap Changer (OLTC)

Start date: Jul 2006
End date: Mar 2011
Funding mechanism:
  • IFI
Electricity North West

FuseRestore (Now the Bidoyng Smart Fuse)

Start date: Oct 2006
End date: Apr 2008
Funding mechanism:
  • IFI
Electricity North West

Expansion Planning

Start date: Apr 2006
End date: Mar 2011
Funding mechanism:
  • IFI
Electricity North West

Vegetation Management

Start date: Nov 2007
End date: Dec 2011
Funding mechanism:
  • IFI
Electricity North West

Radiometric Arc Fault Location

Start date: Nov 2007
End date: Nov 2009
Funding mechanism:
  • IFI
Electricity North West

Wide Area Data Gathering

Start date: Apr 2008
End date: Mar 2011
Funding mechanism:
  • IFI
Electricity North West

Condition Based Risk Management for Cables

Start date: Oct 2008
End date: Aug 2009
Funding mechanism:
  • IFI
Electricity North West

Transient Ferroresonance Study

Start date: Apr 2009
End date: Mar 2011
Funding mechanism:
  • IFI
Electricity North West

Conductor Mounted Sensor

Start date: Apr 2009
End date: Mar 2011
Funding mechanism:
  • IFI
Electricity North West

SG Scoping Study

Start date: Nov 2009
End date: Jan 2010
Funding mechanism:
  • IFI
Electricity North West

Overhead Line Fault Passage Indicators

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Thermal Modelling and Active Network Management

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

AURA NMS

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

LV Network Automation

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Monitoring Solution for Overhead Networks

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

ENA Collaborative IFI Projects

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

GIS Impedance Mapping zMap

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Outram Fault Level Monitor

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Distribution Network Analysis

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Storm Assessment

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Radiometric Arc Fault Location

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Network Resilience to Weather

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

ENMAC Mobile

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

LV System Losses

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Smart Metering Op Benefit

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Integrated Demand Side Management and Energy Storage (Shetland Battery)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Orkney Active Power Network (Phase 3) Electrical State Estimation

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

PURL2 Stage 1

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Protection Performance Study IEC 61850 & Evaluation of IEC61850 - 9 - 2 Process Bus

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Feasibility of an Active Network Management Solution

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

International DSM Survey

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Advanced Management of Tap Changers

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Understanding Ageing Mechanisms in XLPE Cables

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Condition Monitoring of Composite Insulators

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Grid Transformer Monitoring

Start date: Apr 2006
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Supergen V AMPerES

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

GIS Data Definition

Start date: Apr 2010
End date: Mar 2012
Funding mechanism:
  • IFI
UK Power Networks

Transformer Oil Health Index Tool

Start date: Apr 2010
End date: Mar 2011
Funding mechanism:
  • IFI
UK Power Networks

Algorithmic Automation

Start date: Apr 2010
End date: Mar 2011
Funding mechanism:
  • IFI
UK Power Networks

The Zefal Generator for Active Urban Networks

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

LV Underground Cable Fault Management

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Optimal Transformer Utilisation Model

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Network Risk Management

Start date: Apr 2006
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Vacuum Tap Changer

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Recycling Excavated Material

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Lone Worker Risk Management

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Multiple Cable Ratings in Ventilated Tunnels

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Advanced Harmonic Monitoring

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Online Monitoring Integration

Start date: Oct 2007
End date: Dec 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Assest Management - Condition Monitoring of Circuit Breakers

Start date: Nov 2009
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Asset Management - Remote Mass Flow Meters

Start date: Mar 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Review of Voltage Dependency of Load

Start date: Jan 2009
End date: Jul 2009
Funding mechanism:
  • IFI
National Energy System Operator

Demand Response

Start date: Nov 2008
End date: Feb 2010
Funding mechanism:
  • IFI
National Energy System Operator

Communication of System Wide Quantities

Start date: May 2007
End date: Jan 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Reducing Climate Change Impacts

Start date: Jul 2007
End date: Dec 2010
Funding mechanism:
  • IFI
National Energy System Operator

SuperGUM

Start date: Oct 2007
End date: Sep 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Harmonic Data Gathering Project Organised by ENA

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
National Energy System Operator

Scheme 20448 Development of a Live Wrap Replacement Techniques for OHLs Using a Modified SCC System

Start date: Mar 2009
End date: Mar 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Earthwire Platform

Start date: Jul 2008
End date: Sep 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Remote Control of Bird Scarers

Start date: Apr 2008
End date: Mar 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Vegetation Management Research

Start date: Aug 2009
End date: May 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

ACSR Corrosion Research

Start date: May 2008
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Electric Field / Microshock mitigation

Start date: Oct 2010
End date: Sep 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Severn Cable Tunnel Access/Egress Trolley

Start date: Feb 2006
End date: Aug 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Automatic Risk Based Handling of Plant Enquiries Relating to National Grid Transmission Electricity and Gas Assets

Start date: Mar 2008
End date: Dec 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Cable Asset Life Project

Start date: Dec 2008
End date: Sep 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

SODA

Start date: Oct 2007
End date: Sep 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Cable Oil Leaks & Thermal Data Analysis

Start date: Oct 2008
End date: Sep 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Recovery of Cable Core

Start date: Feb 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Bolney 400kV MSCDN Insulation Co-ordination Studies and Measurements

Start date: Nov 2008
End date: Jan 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Development and Approval of 190KN Extra Creepage Length (ECL) Suspension and Tension Insulators

Start date: Jun 2010
End date: Apr 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Evaluation of the Performance and Application of Process Bus

Start date: Jan 2009
End date: Dec 2010
Funding mechanism:
  • IFI
National Energy System Operator

Feasibility of Using Trifluoromethyl Iodide as a Replacement for SF6 in High Voltage Switchgear

Start date: Aug 2009
End date: Dec 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Replacement of SF6 in Transmission Switchgear

Start date: Jan 2009
End date: Dec 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Air System Conditioning Monitoring

Start date: Nov 2008
End date: Jan 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Demountable Flood Barrier Facilitating Work Phase 1 and 2

Start date: Oct 2010
End date: Dec 2014
Funding mechanism:
  • IFI
National Energy System Operator

Determine the Resilience of GPS Clocks and Installations to Substation and Externally Generated Radiated Interference

Start date: Feb 2009
End date: May 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

High Contact Resistance on SF6

Start date: Feb 2007
End date: Feb 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Bus Transfer Capability

Start date: Jan 2008
End date: Sep 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Environmentally Acceptable Alternatives to SF6

Start date: Feb 2008
End date: Mar 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Uneven Dynamic Voltages

Start date: Oct 2007
End date: Dec 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Improved Life Cycle Costing Methods

Start date: Jun 2008
End date: Jan 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Asset Management - Energy Harvesting Technology for Self-Powering Condition Monitoring Sensors

Start date: Feb 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Demonstration of Distributed Demand Side Management as a Service to the UK Grid Operator

Start date: Feb 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

DC Supply Com Air Energy Storage System Pnu Power

Start date: Feb 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

PHILON

Start date: Feb 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Radiometric Arc Fault Location

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Waveform Analysis for Distribution Level Identification of Load Type

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Electric Power Research Institute Intelligent Universal Transformer

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Voltage Control ACTIV

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Flood Risk Modelling

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Zero Fault Level Generation for Active Urban Network (ZEFAL)

Start date: Apr 2008
End date: Mar 2011
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Black Start Study

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Power Line Carrier Demonstration

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Regional Allocation of Carbon Emissions

Start date: Apr 2010
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Voltage Gradient Fault Detection

Start date: Apr 2010
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Remote Access to Pole Mounted Auto Reclosers

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Condition Based Risk Management Criticality Assessment

Start date: Apr 2004
End date: Mar 2010
Funding mechanism:
  • IFI
Electricity North West

Line Tracker Development

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Electricity North West

Rezap Fault Master Developments

Start date: Feb 2006
End date: Jan 2008
Funding mechanism:
  • IFI
Electricity North West

IHost Developments

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Electricity North West

Delta V Developments and Trials

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
Electricity North West

Indoor Substation Environments

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
Electricity North West

Remote Monitoring Software Development

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
Electricity North West

Network Resilience

Start date: Jun 2009
End date: Aug 2009
Funding mechanism:
  • IFI
Electricity North West

Network Resilience Feasibility Phase

Start date: Jun 2009
End date: Aug 2009
Funding mechanism:
  • IFI
Electricity North West

Supergen V AMPerES

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Partial Discharge Mini Monitor

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

IntelliTeam DA

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Trenchless Washover System

Start date: May 2006
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

No Interruptions

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Losses Reduction

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Live Alert

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

275kV Alternative Conductor

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

132kV Trifurcating Joint

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Western Isles Generation Capacity Studies

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Western Isles Cable Studies

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Tower Loading Risk Assessment

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Composite 132kV Insulators

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Distribution System State Estimation

Start date: Apr 2005
End date: Mar 2009
Funding mechanism:
  • IFI
UK Power Networks

Activ Project

Start date: Apr 2007
End date: Mar 2009
Funding mechanism:
  • IFI
UK Power Networks

33kV Voltage Control

Start date: Apr 2006
End date: Mar 2009
Funding mechanism:
  • IFI
UK Power Networks

FENIX

Start date: Apr 2005
End date: Mar 2009
Funding mechanism:
  • IFI
UK Power Networks

Application of Storage and Demand Side Management

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Risk Management of Assets

Start date: Apr 2008
End date: Mar 2009
Funding mechanism:
  • IFI
UK Power Networks

Improved Fluid Filled Cable Leak Location System

Start date: Apr 2008
End date: Mar 2009
Funding mechanism:
  • IFI
UK Power Networks

Overhead Line Fault Location

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Innovative 132kV Joint Development

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Evaluation of the Characteristics of Alternative Oils for Retro Filling Power Transformers and for Use in New Transformers (Phase 2)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Network Technical Losses Reduction

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Steyning Primary Registered Power Zone

Start date: Apr 2009
End date: Mar 2010
Status:
Live
Funding mechanism:
  • Registered Power Zones
UK Power Networks

Smart Network Trial

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Helicopter Mounted Partial Discharge Detection Feasibility Trial

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Supergen V AMPerES

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Efficient Incorporation of Intermittent Generation Considerations in Network Design

Start date: Feb 2007
End date: Feb 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Oil Level Monitor

Start date: Jan 2009
End date: Feb 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Assest Management - Smartlife Workgroup

Start date: Feb 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Assest Management - Full Site Trial of Condition Monitoring

Start date: Sep 2009
End date: Dec 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Assest Management - Bi-Directional R.F Intra-Substation Communications System

Start date: Feb 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Assest Management - Noise Recorder GPRS Interface to Provide Online Data Logging Facility

Start date: Jul 2009
End date: Jan 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Substation Compaction

Start date: Apr 2006
End date: Sep 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Terrestrial Laser Survey of Substation Assets

Start date: Jul 2008
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Verification and Benchmark Testing of Dynamic Short Circuit (SC) Ratings for Civil Structures - Feasibility Study

Start date: Sep 2009
End date: Dec 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Ballistic Screening

Start date: Oct 2005
End date: Oct 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Substation Indication Discharge Detection (SIDD)

Start date: Jul 2009
End date: Jan 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

OMU Top Up tanks

Start date: Jan 2009
End date: Jun 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Development of an Interlock System for Portable Primary Earths on the National Grid System

Start date: Dec 2008
End date: Nov 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Current and Earth Potential at Substations

Start date: Aug 2006
End date: Oct 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Sulphur in Oil Trial

Start date: Jul 2008
End date: Jul 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Digital Control System Upgrade

Start date: Mar 2009
End date: Feb 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Reference Networks (Phase 2)

Start date: Apr 2004
End date: Mar 2008
Funding mechanism:
  • IFI
Electricity North West

Electricity Supply Fault Level Instrument

Start date: Apr 2005
End date: Mar 2007
Funding mechanism:
  • IFI
Electricity North West

Vista Mapping Underground Assets

Start date: Apr 2005
End date: Mar 2008
Funding mechanism:
  • IFI
Electricity North West

TP 22 LV Fault Locator

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
Electricity North West

Delta V Developments and Trials

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
Electricity North West

LV Sure

Start date: Apr 2006
End date: Mar 2009
Funding mechanism:
  • IFI
Electricity North West

LV Sure (Phase 2)

Start date: Apr 2008
End date: Mar 2009
Funding mechanism:
  • IFI
Electricity North West

Chromatic Oil Analysis (Phase 1)

Start date: Oct 2008
End date: Aug 2008
Funding mechanism:
  • IFI
Electricity North West

Transient Resonance Study

Start date: Apr 2008
End date: Mar 2011
Funding mechanism:
  • IFI
Electricity North West

Alternative Oils for Transformers Stage 2

Start date: Apr 2008
End date: Mar 2009
Funding mechanism:
  • IFI
Electricity North West

Climate Change Impact On Network Resilience

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Radiometric Arc Fault Location

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

ENA/ENFG Smart Grid Studies

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Activ Project

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Flex Net

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Health Indices Development Wood pole OHL and Distribution Substations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Network Risk Modelling

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

ZEFAL Generator for Active Urban Networks

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Supergen V AMPerES

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Pole Leakage Mitigation

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Remote Indicating Fault Passage Indicators

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

UltraTev Alarm Trial

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Stability of Loss of Mains Relays (LoM) to Transient Faults

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Loss of Mains Relays (LoM) for Generation Interface Protection

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Reverse Reactive Power Relays

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Health Index Development EHV Cables

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Asset Condition Data Strategy

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Reference Networks

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Met Office Energy Phase 2 Climate Change Modelling

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Woodhouse Steel Girder Mast Replacement Specification

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Technology Roadmap

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Loss of Mains (LoM) Protection (ROCOF) Phase 2

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

NaREC LV AVC feasibility Study

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Innovative Fault Passage Indicator for Cable Systems (GM FPI)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

GROND Contingency Analysis

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Long Underground EHV Cables

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Oil Degradation

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

OBYR14 UV Camera Survey

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Condition Based Risk Management

Start date: Dec 2010
End date: Sep 2011
Funding mechanism:
  • IFI
Electricity North West

Fibre Optic Based Substation Communications

Start date: Apr 2005
End date: Mar 2008
Funding mechanism:
  • IFI
Electricity North West

ENA Lightning Protection

Start date: Apr 2005
End date: Mar 2007
Funding mechanism:
  • IFI
Electricity North West

Line Tracker Trial

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Electricity North West

LV Voltage Regulator

Start date: Apr 2005
End date: Mar 2008
Funding mechanism:
  • IFI
Electricity North West

Resilience and Investment Model

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
Electricity North West

Climate Change

Start date: Apr 2007
End date: Mar 2008
Funding mechanism:
  • IFI
Electricity North West

Alternative Oils for Transformers Stage 1

Start date: Apr 2004
End date: Mar 2007
Funding mechanism:
  • IFI
Electricity North West

NaFIRS HV Fault Data

Start date: Apr 2005
End date: Mar 2007
Funding mechanism:
  • IFI
Electricity North West

Functional Spec ROCOF Relay

Start date: Apr 2005
End date: Mar 2007
Funding mechanism:
  • IFI
Electricity North West

Distributed IO

Start date: Apr 2005
End date: Mar 2006
Funding mechanism:
  • IFI
Electricity North West

Software Tool for Allocating Distribution Losses

Start date: Apr 2004
End date: Mar 2006
Funding mechanism:
  • IFI
Electricity North West

Cost Effective Marginal Distribution Network Pricing Methodology

Start date: Apr 2004
End date: Mar 2005
Funding mechanism:
  • IFI
Electricity North West

Integration of Substation Relay Information (Skerneside Trial)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Single Phase Low Voltage Regulators

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Fault Level Monitor Project

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Development of Redox Flow Battery for Energy Storage

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Innovative Protection Solutions

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

MANtIS (Managing Active Networks through Intelligent Systems)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Tower Foundation Radar

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Energy Innovation Centre

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Impact of Climate Change Energy (Phase 2) MET Office

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Asset Decision Support Dashboard

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Lattice Steel Tower Protective Coatings

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

4Energy Low Carbon Comms Cooling

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Ashton Hayes Microgrid

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Wind Turbine Effects on Transmission Lines

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

Health Indices for Asset Management Decision Making

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Sub.net Monitoring

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

GB SQSS Review Studies

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

Alternative Design for 132kV Overhead Lines

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

Radiometric Substation Monitoring

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

L36 33kV Overhead Line Spec inc. OPPC

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Offline Corrosion Monitoring (Towers)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Remote Line Temperature Monitor

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

GridSense LineTracker FPI (Conductor Temperature)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

Pole Leakage Detection Device (Phase 1-3)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Energy Storage Devices for Distribution Networks

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Fault Infeed Calculations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Advanced Cable Technologies

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

ESR Network (ESR 21)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Portable Smart Link (ASL) Tester

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Smart Dust (Phase 1)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Scottish Power/Rolls Royce Prototype Network

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Supergen III

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Overhead Line Uprating Project Compact Transmission Lines

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

Substation Acoustic Monitoring

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

4Energy Battery Aircon Device

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Kelman Circuit Breaker Intelligence Analysis

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Minimum Switchgear Project

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

IED Radio

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Broadband Power Carrier

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Testing Procedure for ROCOF Relays

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Hydrogen Electrolyser / Storage DTI Submission

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Optimising Voltage Control / Var Performance of a Large Scale Wind Farms

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

ENA Lightning Protection

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

HV Sure

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Self Tuning Petersen

Start date: Jul 2008
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Integrated Vegetation Management

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Dynamic Sag Monitor

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Multi Terminal DC Micro Grid

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Power Electronics Regulator

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

CBRM (Transformers)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

CRATER for Submarine Cables

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Application of Storage & Demand Side Management

Start date: Jul 2008
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

275kV Woodpole Design

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

Orkney Active Distribution Network Management

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • Registered Power Zones
Scottish and Southern Electricity Networks Distribution

Huddig

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

FPIs + GSM

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Underground Cable Plough

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Live Line High-Res Camera

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Shetland RPZ

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • Registered Power Zones
Scottish and Southern Electricity Networks Distribution

Network Damage Assessment

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

POLESTAR FPIs

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Portable Fault Passage Indicators (FPIs) with GSM Communications

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Development of Downstream OYT Operation Detector

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Communications Network Study

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

GPS Technology with Datalogger

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Geographic Information System (GIS) to Vehicles and Strategic Substations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Template 2 Automation

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

A New Approach to 11kV Network Design

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Vulnerable Customer UPS

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Intelligent Distribution Network Monitoring

Start date: Apr 2008
End date: Mar 2009
Funding mechanism:
  • IFI
UK Power Networks

Distributed Generation (DG) Connection Planner

Start date: Apr 2006
End date: Mar 2009
Funding mechanism:
  • IFI
UK Power Networks

Advanced Forensic Methods

Start date: Apr 2008
End date: Mar 2009
Funding mechanism:
  • IFI
UK Power Networks

Distributed Generation Planning Software

Start date: Apr 2007
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

GenAVC Assessment Tool

Start date: Apr 2005
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Battery Asset Management

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Transformer Damping

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Domestic Cut Out Temp Indicators

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Power Factor Analysis

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Primary SCADA Communications IP Upgrade

Start date: Apr 2007
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Impact of Climate Change on the UK Energy Industry

Start date: Apr 2007
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

RTU Local Display Facility

Start date: Apr 2007
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Improvements in Overhead Line Performance

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Wood Pole Disposal

Start date: Apr 2005
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Electrical Energy Harvesting from Vibrations

Start date: Apr 2006
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

Transformer Temperature Fibre Optic Monitoring

Start date: Apr 2005
End date: Mar 2008
Funding mechanism:
  • IFI
UK Power Networks

The Use of Perfluorocarbon Tracers (PFT) Leak Location Techniques

Start date: Apr 2005
End date: Mar 2007
Funding mechanism:
  • IFI
UK Power Networks

Risk Assessment

Start date: Apr 2005
End date: Mar 2006
Funding mechanism:
  • IFI
UK Power Networks

Energy Efficiency in Substations

Start date: Apr 2005
End date: Mar 2006
Funding mechanism:
  • IFI
UK Power Networks

Low Voltage Automation

Start date: Apr 2005
End date: Mar 2006
Funding mechanism:
  • IFI
UK Power Networks

National Committee Activity

Start date: Apr 2005
End date: Mar 2006
Funding mechanism:
  • IFI
UK Power Networks

Network Resilience

Start date: Apr 2005
End date: Mar 2006
Funding mechanism:
  • IFI
UK Power Networks

Protection Schemes Demonstration Tool

Start date: Apr 2005
End date: Mar 2006
Funding mechanism:
  • IFI
UK Power Networks

Relay Tester

Start date: Apr 2005
End date: Mar 2006
Funding mechanism:
  • IFI
UK Power Networks

Martham Primary RPZ

Start date: Apr 2005
End date: Mar 2006
Status:
Live
Funding mechanism:
  • Registered Power Zones
UK Power Networks

Fault Level Monitor Project

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Impact of Climate Change on the UK Energy Industry

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Life Cycle Assessment of 11kV Overhead Line and Underground Cable

Start date: Apr 2008
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Condition Based Risk Management Cables

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

UltraTEV Alarm

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Charging Methodologies

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Mobile SCADA

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

ENA Lightning Protection

Start date: Jan 2005
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Remote Access to Substations

Start date: Sep 2004
End date: Sep 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Understanding and Mitigation of Hazards Related to Transmission Tower (TT) Bases

Start date: Sep 2010
End date: Mar 2014
Funding mechanism:
  • IFI
National Energy System Operator

Terrestrial Laser Survey

Start date: Jul 2008
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

River Crossing Dampers

Start date: Dec 2006
End date: Aug 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Design and Development of Maintenance Delivery Tools (MDT)

Start date: Sep 2010
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Flooding Risk Analysis Pluvial Flooding Risk

Start date: Feb 2012
End date: May 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Weather Observation Network Review and Trial

Start date: Dec 2007
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Data Visualization

Start date: Aug 2011
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Network Design New Generation

Start date: Oct 2008
End date: Mar 2008
Funding mechanism:
  • IFI
National Energy System Operator

Network Design System Stability

Start date: Nov 2011
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

New Technology to Enable the Connection of Low Carbon Generation (LCG)

Start date: Sep 2004
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Infrastructure Development for the Electricity Transmission Network for 2020 to 2030

Start date: Jun 2011
End date: Dec 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Charge Development of GIS Spacers

Start date: Sep 2007
End date: Oct 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Grading Capacitor Condition Evaluation

Start date: Mar 2008
End date: Sep 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Vacuum Tapchanger

Start date: Jun 2011
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Asset Management - ARMADA

Start date: Jan 2009
End date: Dec 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Asset Management - Remote Connection to Partial Discharge Monitoring

Start date: Sep 2011
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Asset Management - Energy Scavenging Technology

Start date: Apr 2009
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Substation Design Reliability

Start date: May 2008
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Portable Primary Earthing (PPE)

Start date: Jun 2009
End date: Jul 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Understanding Conduction Mechanisms in Earthing Systems and Optimisation of Earth Electrode Geometries

Start date: Nov 2009
End date: Nov 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Wide Area Monitoring Protection & Control (WAMPAC)

Start date: Dec 2007
End date: Jan 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Collapse Prediction on Transmission Networks

Start date: Oct 2007
End date: Sep 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Lubrication Rationalisation

Start date: Oct 2006
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Reduced Asset Related Safety Incidents

Start date: Jun 2010
End date: Aug 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Flood Risk Strategy Development

Start date: Nov 2007
End date: Mar 2008
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Flood Risk Study

Start date: Nov 2007
End date: Mar 2008
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Ostwald Coefficients for Cable Oil

Start date: Apr 2008
End date: Jun 2008
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Portable Oil in Soil Measuring Instrument

Start date: Sep 2007
End date: Sep 2008
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Multi Agent Based Wide Area Protection

Start date: Dec 2006
End date: Sep 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Smart Grid Oscillation Management for a Changing Generation Mix (Psymetrix)

Start date: Feb 2009
End date: Nov 2012
Funding mechanism:
  • IFI
National Energy System Operator

ROADS

Start date: Apr 2007
End date: Mar 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Plastic V Concrete Cable Protection

Start date: Oct 2007
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Potential Impact of Wind Turbines on Overhead Lines (Phase 1)

Start date: Feb 2009
End date: Feb 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Greasy Conductor Interstices Cleaner

Start date: Aug 2011
End date: Jun 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Composite Technology Conductor Trial

Start date: Feb 2009
End date: Oct 2007
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Unmanned Aerial Vehicles (UAVs)

Start date: Jul 2008
End date: Mar 2009
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Reducing National Grid Carbon Footprint

Start date: Nov 2011
End date: Jan 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Development of Toolkit for the Remediation of Oil Contaminated Soils

Start date: Apr 2006
End date: Mar 2007
Funding mechanism:
  • IFI
National Grid Electricity Transmission

UK Investment Recovery

Start date: Nov 2011
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Transformer Heat Recovery

Start date: Jan 2009
End date: Oct 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Aged Transformer Insulation Capability

Start date: Oct 2004
End date: Sep 2006
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Control & Impact of Ferroresonance on Power Transformers

Start date: Apr 2008
End date: Sep 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Transformer Refurbishment Trial

Start date: Dec 2011
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Dynamic Resistance of Transmission Tower Footings

Start date: Sep 2003
End date: Jun 2005
Funding mechanism:
  • IFI
National Grid Electricity Transmission

EPRI Power Delivery

Start date: Apr 2009
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Transformer Life Management

Start date: Oct 2007
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Ratings Developments

Start date: Aug 2006
End date: Nov 2007
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Ageing Mechanisms in Composite Insulators

Start date: Aug 2004
End date: Oct 2007
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Oils Technology

Start date: Sep 2005
End date: Apr 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Condition and Life Extension of Substation Assets

Start date: Oct 2007
End date: Apr 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Development to Upgrade Digital Control System

Start date: Dec 2006
End date: Feb 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Portable Earthing

Start date: Oct 2011
End date: Dec 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Alternative Technologies

Start date: Sep 2008
End date: Sep 2011
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Substation Design

Start date: Oct 2007
End date: Dec 2010
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Climate Change Work

Start date: Nov 2011
End date: May 2006
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Flooding Risk Reduction

Start date: Oct 2011
End date: Sep 2014
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Investigation to Network Resilience to Weather Events

Start date: Apr 2011
End date: Mar 2014
Funding mechanism:
  • IFI
National Energy System Operator

Developments in Protection and Control

Start date: Aug 2009
End date: Jan 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Measurement of 3rd Party Exposure to Rise of Earth Potential

Start date: Oct 2010
End date: Mar 2014
Funding mechanism:
  • IFI
National Energy System Operator

Composite Technology

Start date: Jan 2009
End date: Oct 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

The Role of the Demand Side in Delivering Effective Smart Grids

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Enhanced Weather Modelling for Dynamic Line Rating

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Energy and Carbon Master Planning (ECMP)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

FM Sudafix Conductive Concrete

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

GnoSys Self Healing Cables

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Battery Alarm and EFI Signalling from HV Secondary Substations

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

Transformer Research Consortium (Phase 3)

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

DNO Trial of Power Line Carrier (PLC) to Support Low Voltage SCADA

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Impact of Residential Heating and Building Standards on Demand Profiles

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Substation Efficiency

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

GB Electricity Demand Project

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Smart 3 Phase LV Voltage Regulator

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Transient Earth Detector

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

SUSCABLE 2

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Data Concentrator CCU & DNP3 Digital Radio Development

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Transmission

Smart Meter Enablement

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Voltage Regulating Secondary Transformer

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
SP Energy Networks Distribution

Electric Boulevards

Start date: Feb 2013
End date: Mar 2015
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

GROND - Assessment of HV Network and Policy Module

Start date: Apr 2004
End date: Mar 2006
Funding mechanism:
  • IFI
Electricity North West

Intelligent Condition Monitoring and Diagnosis

Start date: Apr 2009
End date: Mar 2010
Funding mechanism:
  • IFI
UK Power Networks

Development of Overhead Line Condition Monitoring Techniques

Start date: Apr 2005
End date: Mar 2006
Funding mechanism:
  • IFI
UK Power Networks

Low Voltage Integrated Automation (LoVIA)

Start date: Mar 2013
End date: Jul 2015
Funding mechanism:
  • LCNF Tier 1
Electricity North West

Birds and Power Lines

Start date: Apr 2013
End date: Aug 2014
Funding mechanism:
  • IFI
Electricity North West

Composite Link Box Lids

Start date: Feb 2012
End date: Jul 2012
Funding mechanism:
  • IFI
Electricity North West

Conservation Voltage Reduction

Start date: Nov 2012
End date: May 2014
Funding mechanism:
  • IFI
Electricity North West

Duckbill Anchors

Start date: Aug 2012
End date: Aug 2013
Funding mechanism:
  • IFI
Electricity North West

Fluid Filled Cables Repair System

Start date: Apr 2013
End date: Nov 2014
Funding mechanism:
  • IFI
Electricity North West

IEA Smart Grids for Customers

Start date: Sep 2012
End date: Sep 2014
Funding mechanism:
  • IFI
Electricity North West

Load Allocation (Phase 2)

Start date: Jul 2012
End date: Jun 2014
Funding mechanism:
  • IFI
Electricity North West

Low Voltage Network Modelling

Start date: Apr 2011
End date: Mar 2013
Funding mechanism:
  • IFI
Electricity North West

LV Voltage Regulators

Start date: Aug 2012
End date: Feb 2014
Funding mechanism:
  • IFI
Electricity North West

Monitoring of PV Arrays

Start date: Aug 2012
End date: Aug 2013
Funding mechanism:
  • IFI
Electricity North West

Oil Regeneration Stage 1 & 2

Start date: Nov 2011
End date: Nov 2016
Funding mechanism:
  • IFI
Electricity North West

Primary Voltage Control

Start date: Apr 2013
End date: Oct 2013
Funding mechanism:
  • IFI
Electricity North West

Substation Security

Start date: Jan 2014
End date: Mar 2015
Funding mechanism:
  • IFI
Electricity North West

CBRM Extension – Health Indices

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Distribution Load Estimates Methodology

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Load Forecasting Scenario Model

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Smart Data

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Northern Powergrid

Contact Voltage Testing

Start date: Apr 2012
End date: Mar 2013
Funding mechanism:
  • IFI
UK Power Networks

Detection of Broken and Low Hanging Conductors

Start date: Apr 2014
End date: Mar 2015
Funding mechanism:
  • IFI
UK Power Networks

Developing Long Term Asset Risk Replacement Modelling

Start date: Apr 2012
End date: Mar 2013
Funding mechanism:
  • IFI
UK Power Networks

Earthing Design Tool

Start date: Apr 2013
End date: Mar 2014
Funding mechanism:
  • IFI
UK Power Networks

Energy Innovation Centre

Start date: Apr 2012
End date: Mar 2015
Funding mechanism:
  • IFI
UK Power Networks

Fault Level Management Study

Start date: Apr 2013
End date: Mar 2015
Funding mechanism:
  • IFI
UK Power Networks

Home Based Flexible Demand Management (HBFDM)

Start date: Apr 2012
End date: Mar 2013
Funding mechanism:
  • IFI
UK Power Networks

Smart Power Distribution

Start date: Apr 2012
End date: Mar 2014
Funding mechanism:
  • IFI
UK Power Networks

Carbon Tracing

Start date: Jan 2005
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Distribution

CuTS LV Overhead Line Project

Start date: Jan 2005
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Demonstration Of Distribution Scale Energy Storage

Start date: Jan 2005
End date: Mar 2014
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Identification and Prioritisation of Network Losses

Start date: Jan 2005
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

Reactive Power Compensation For Distribution Networks

Start date: Jan 2005
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Distribution

BellRock Lumen Condition Monitoring Decision Support

Start date: Apr 2005
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Transmission

2050 Energy Infrastructure Outlook

Start date: Jan 2008
End date: Aug 2013
Funding mechanism:
  • IFI
National Energy System Operator

A Tool for Evaluating Overhead Line Performance Under Novel Technology Implementations

Start date: Apr 2011
End date: Mar 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Alternative Differential Unit Protection for Cable only and Cable & OHL

Start date: Sep 2010
End date: Dec 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Application of DC Circuit Breakers in DC Grids

Start date: Oct 2008
End date: Jul 2017
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Cables with Long Electrical Sections

Start date: Sep 2004
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Co-managed Innovation Projects (SSE/NG/UMIP)

Start date: Mar 2011
End date: Dec 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Dinorwig Thermal Cycling and Cable Rating

Start date: Oct 2005
End date: Jun 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Dynamic Ratings for improved Operational Performance (DROP)

Start date: Apr 2012
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Ultra Wire

Start date: Oct 2008
End date: Oct 2019
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Fault Current Active Management (FCAM)

Start date: Sep 2013
End date: Mar 2015
Funding mechanism:
  • LCNF Tier 1
Electricity North West

Energy Control for Household Optimisation (ECHO)

Start date: Aug 2013
End date: Feb 2015
Funding mechanism:
  • LCNF Tier 1
National Grid Electricity Distribution

LV Protection And Communications (LV PAC)

Start date: Sep 2013
End date: Mar 2015
Funding mechanism:
  • LCNF Tier 1
Electricity North West

Community Energy Coaching Programme

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Community Energy Coaching Programme

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

CES Knowledge Transfer Partnership

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Vehicle to Grid

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Isle of Wight Losses Project

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Subsea Desktop Study Tool

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Green Running Load and DG Detection

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

BMW Active E

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Electric Bus for Glasgow

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Establish the Affordability of ADR

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Multi-Terminal Test Environment (MTTE) for HVDC Systems

Start date: Jan 2014
End date: Mar 2021
Funding mechanism:
  • NIC
Scottish and Southern Electricity Networks Transmission

Visualisation of Real Time System Dynamics using Enhanced Monitoring (VISOR)

Start date: Dec 2013
End date: Mar 2017
Status:
Live
Funding mechanism:
  • NIC
SP Energy Networks Transmission

BioSNG Demonstration Plant

Start date: Apr 2014
End date: Mar 2017
Status:
Live
Funding mechanism:
  • NIC
Cadent

Low Carbon Gas Preheating

Start date: Jan 2014
End date: Dec 2017
Status:
Live
Funding mechanism:
  • NIC
Northern Gas Networks

Smart Street (eta)

Start date: Jan 2014
End date: Dec 2017
Funding mechanism:
  • LCNF Tier 2
Electricity North West

Vulnerable Customers and Energy Efficiency

Start date: Jan 2014
End date: Dec 2017
Funding mechanism:
  • LCNF Tier 2
UK Power Networks

Solent Achieving Value from Efficiency (SAVE)

Start date: Jan 2014
End date: Jun 2019
Funding mechanism:
  • LCNF Tier 2
Scottish and Southern Electricity Networks Distribution

GPS Installation Condition Assessments & Interference Monitoring System Installations

Start date: Apr 2012
End date: Jun 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Mathematics of Balancing Energy Networks Under Uncertainty

Start date: Jan 2012
End date: Jul 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Modelling and Analysis of Potential Installations and Uses of Grid Scale Energy Storage in Great Britain

Start date: Apr 2012
End date: Mar 2013
Funding mechanism:
  • IFI
National Energy System Operator

Novel Backfill

Start date: Oct 2011
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Novel Use of Distribution Equipment for Power Quality Management

Start date: Jan 2012
End date: Mar 2015
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Power System Oscillation Damping with HVDC (POD) - Feasibility Study

Start date: Oct 2012
End date: Nov 2012
Funding mechanism:
  • IFI
National Energy System Operator

PPE Closing the Loop for Commodities and Workwear

Start date: Oct 2012
End date: Jun 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Impact of Electrolysers on the Distribution Network

Start date: Oct 2013
End date: Mar 2015
Funding mechanism:
  • LCNF Tier 1
Scottish and Southern Electricity Networks Distribution

Smart Building Potential Within Heavily Utilised Networks

Start date: Apr 2014
End date: Mar 2015
Funding mechanism:
  • LCNF Tier 1
SP Energy Networks Transmission

Power Transformer Real Time Thermal Rating

Start date: Jun 2014
End date: Dec 2016
Funding mechanism:
  • LCNF Tier 1
UK Power Networks

DISCERN

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Analysis of Transmission Solution for Distribution Networks (ATSD)

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Leak location & Oxifree Coatings

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Remote Access Soultions

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

ZeEUS

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Network Damage Reporter

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Orkney ANM Critical Circuits

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Overhead Line Vibration Monitoring

Start date: Jan 2014
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Field Team Support Tool

Start date: Jan 2014
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Fault Passage Indicator Consolidation

Start date: Jan 2014
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Data matching for Smart Registration

Start date: Jan 2014
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Cable Core Temperature Sensor

Start date: Jan 2014
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

RPAS Operational Requirements & Specifications For Aerial Inspection BVLOS

Start date: Jan 2014
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Ultrapole

Start date: Jan 2014
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

PHD Power Net Asset Man

Start date: Jan 2011
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Asset Man of LV Cables

Start date: Jan 2011
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Sub Sea Cable Monitoring

Start date: Jan 2011
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Harmonics Investigation

Start date: Jan 2011
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Tellus GIS

Start date: Jan 2011
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Hybrid Generator

Start date: Jan 2011
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Phase Identification

Start date: Jan 2011
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Cryogenic Storage Technology Review

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Aberdeen Hydrogen Feasibility Study

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

SASensor HMV Primary Substation Provider

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Mobile Diesel Generation with Battery Storage

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Markets for DSM and Storage-Phase 1

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Orkney Sub 50kW

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Orkney RPZ Phase 2

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Espirit Network Trial

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Real Time Java

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Methanation

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Grid Integration of Marine Energy

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

GENDRIVE

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Gynosys Self Healing Cables

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Radio Teleswitch Phase 2

Start date: Jan 2012
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Copper Theft detection

Start date: Jan 2013
End date: Mar 2010
Funding mechanism:
  • IFI
Scottish and Southern Electricity Networks Distribution

Respond (FLARE)

Start date: Jan 2015
End date: Aug 2018
Funding mechanism:
  • LCNF Tier 2
Electricity North West

Low Energy Automated Networks (LEAN)

Start date: Jan 2015
End date: Dec 2019
Funding mechanism:
  • LCNF Tier 2
Scottish and Southern Electricity Networks Distribution

Network Equilibrium

Start date: Mar 2015
End date: Jun 2019
Funding mechanism:
  • LCNF Tier 2
National Grid Electricity Distribution

Enhanced Frequency Control Capability (EFCC)

Start date: Jan 2015
End date: Mar 2018
Status:
Live
Funding mechanism:
  • NIC
National Energy System Operator

Modular Approach to Substation Construction (MASC)

Start date: Jan 2015
End date: Jun 2019
Funding mechanism:
  • NIC
Scottish and Southern Electricity Networks Transmission

In Line Robotic Inspection of High Pressure Installations

Start date: Jan 2015
End date: Nov 2018
Funding mechanism:
  • NIC
National Gas Transmission PLC

Offshore Cable Repair Vessel and Universal Joint

Start date: Jan 2015
End date: Jul 2018
Status:
Live
Funding mechanism:
  • NIC

Combined on-line Transformer Monitoring

Start date: Sep 2014
End date: Sep 2016
Funding mechanism:
  • LCNF Tier 1
Electricity North West

Digital Substation Platform - Phase 1

Start date: Jan 2015
End date: Mar 2015
Funding mechanism:
  • LCNF Tier 1
Scottish and Southern Electricity Networks Transmission

Fault Sense

Start date: Feb 2015
End date: Mar 2018
Funding mechanism:
  • LCNF Tier 1
Electricity North West

Protection and Control Roadmap

Start date: Jan 2010
End date: Oct 2014
Funding mechanism:
  • IFI
National Energy System Operator

Reactive Power Demand Trends

Start date: Jan 2013
End date: Jan 2014
Funding mechanism:
  • IFI
National Energy System Operator

ROGER

Start date: Jan 2013
End date: Jan 2014
Funding mechanism:
  • IFI
National Energy System Operator

Seismic Analysis of Electricity Towers and Substation Structures

Start date: Jan 2013
End date: Jul 2012
Funding mechanism:
  • IFI
National Grid Electricity Transmission

SF6 Capture and Leakage Repair Technology

Start date: Jan 2013
End date: Dec 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

Temporary Oil Containment

Start date: Jan 2013
End date: Mar 2013
Funding mechanism:
  • IFI
National Grid Electricity Transmission

ANGLE–DC

Start date: Jan 2016
End date: Apr 2020
Status:
Live
Funding mechanism:
  • NIC
SP Energy Networks Distribution

Celsius

Start date: Jan 2016
End date: Mar 2020
Funding mechanism:
  • NIC
Electricity North West

Offline Substation Environment for the Acceleration of Innovative Technologies (OSEAIT)

Start date: Jan 2016
End date: Oct 2020
Status:
Live
Funding mechanism:
  • NIC
National Grid Electricity Transmission

Future Intelligent Transmission NEtwork SubStation (FITNESS)

Start date: Apr 2016
End date: Mar 2020
Status:
Live
Funding mechanism:
  • NIC
SP Energy Networks Transmission

New Suite of Transmission Structures (NeSTS)

Start date: Jan 2016
End date: Mar 2022
Funding mechanism:
  • NIC
Scottish and Southern Electricity Networks Transmission

The City CNG Project

Start date: Dec 2015
End date: Oct 2019
Status:
Live
Funding mechanism:
  • NIC
Northern Gas Networks

Real-Time Networks

Start date: Apr 2016
End date: Apr 2020
Funding mechanism:
  • NIC
SGN

Commercial BioSNG Demonstration Plant

Start date: Dec 2015
End date: Nov 2018
Status:
Live
Funding mechanism:
  • NIC
Cadent

Project CLoCC - Customer Low Cost Connections

Start date: Feb 2016
End date: Oct 2018
Funding mechanism:
  • NIC
National Gas Transmission PLC

Powerful-CB: Power Electronic Fault Limiting Circuit Breaker

Start date: Jan 2017
End date: Aug 2021
Status:
Live
Funding mechanism:
  • NIC
UK Power Networks

OpenLV

Start date: Jan 2017
End date: Mar 2021
Funding mechanism:
  • NIC
National Grid Electricity Distribution

Phoenix - System Security and Synchronous Compensators

Start date: Jan 2017
End date: Mar 2021
Status:
Live
Funding mechanism:
  • NIC
SP Energy Networks Transmission

Transmission & Distribution Interface 2.0 (TDI 2.0)

Start date: Jan 2017
End date: Dec 2019
Status:
Live
Funding mechanism:
  • NIC
National Energy System Operator

Future Billing Methodology

Start date: Apr 2017
End date: Mar 2020
Funding mechanism:
  • NIC
Cadent

HyDeploy

Start date: Apr 2017
End date: Mar 2020
Funding mechanism:
  • NIC
Cadent

Secondary Telecommunications Phase 3 – Trial of Hybrid Telecoms

Start date: Nov 2017
End date: Mar 2024
Status:
Live
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Drones Within Visual Line Of Sight (Drone WVLOS)

Start date: Jan 2018
End date: Oct 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Eye In The Sky

Start date: Jan 2018
End date: Jan 2021
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

H21 – Field Trials Design

Start date: Jul 2018
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Active Response to Distribution Network Constraints

Start date: Jan 2018
End date: Nov 2023
Status:
Live
Funding mechanism:
  • NIC
UK Power Networks

LV Engine

Start date: Feb 2018
End date: Dec 2022
Status:
Live
Funding mechanism:
  • NIC
SP Energy Networks Distribution

TRANSITION

Start date: Jan 2018
End date: Jun 2021
Funding mechanism:
  • NIC
Scottish and Southern Electricity Networks Distribution

FUSION

Start date: Jan 2018
End date: Jan 2023
Status:
Live
Funding mechanism:
  • NIC
SP Energy Networks Distribution

Robotic Roadworks and Excavation System (RRES)

Start date: Apr 2018
End date: Apr 2022
Funding mechanism:
  • NIC
SGN

H21

Start date: Jan 2018
End date: Dec 2020
Funding mechanism:
  • NIC
Northern Gas Networks

Under Pressure Drilling Equipment for PE Construction Valves

Start date: Feb 2018
End date: Feb 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

Primary Networks Power Quality Analysis

Start date: Mar 2018
End date: Jun 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Electricity Flexibility and Forecasting System (EFFS)

Start date: Jan 2018
End date: Nov 2021
Funding mechanism:
  • NIC
National Grid Electricity Distribution

Visibility Plugs and Socket

Start date: Feb 2018
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

EZ Valve performance and material testing GIS V7-1

Start date: Feb 2018
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

End Load Restrain Capability

Start date: Feb 2018
End date: Feb 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Distributed Ledger Technology-enabled Distribution System Operation (Phase 1)

Start date: Mar 2018
End date: Mar 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Autodesign: LV Connections Self-Service Tool

Start date: Feb 2018
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Link Alert

Start date: Feb 2018
End date: Feb 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Mobile Field Control

Start date: Mar 2018
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Holistic Fault Prediction

Start date: Mar 2018
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Lightning Prediction

Start date: Mar 2018
End date: Sep 2020
Status:
Live
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Zebedee Sectionaliser Device

Start date: Mar 2018
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

TransPower

Start date: Apr 2018
End date: Jul 2022
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Pressure Control and Management

Start date: Apr 2018
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

Portable Radiometric Arc Fault Locator using battery powered field deployable equipment (RAFL2)

Start date: Apr 2018
End date: Jan 2022
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Investigation & Modelling of Fast Frequency Phenomena (“F2P”)

Start date: Apr 2018
End date: Apr 2019
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Long Term Stability Testing of Alternative Gases

Start date: Jan 2018
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Overhead Lines (P35) 2018-2021

Start date: Apr 2018
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Electric Road System for Dynamic Charging of Electric Vehicles

Start date: Jan 2018
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Solar PV Monitoring Phase 3

Start date: May 2018
End date: May 2021
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Network Vision

Start date: May 2018
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Ball Valve Replacement

Start date: May 2018
End date: Oct 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

The FMEA Studies and Risk-based Maintenance for Emerging Power Electronics Assets within GB Power Networks

Start date: Aug 2018
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Internal Live Service Insertion (ILSI)

Start date: Jun 2018
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

CALISTA - Cable Asset Life by Integrating Statistical Failure Models

Start date: Sep 2018
End date: Jun 2022
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Line Inspections by Semi-Autonomous Systems (LISAS)

Start date: Jun 2018
End date: Nov 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Hydrogen Grid to Vehicle (HG2V); Network purity for Transport.

Start date: Jul 2018
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Liquids for cable sealing ends (LiCaSE)

Start date: Jun 2018
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Electrical Characterisation of Silicone Oil (ECOSO)

Start date: Jun 2018
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Engineered Poles Products

Start date: Jul 2018
End date: Jan 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Resilient Homes

Start date: Jul 2018
End date: Jul 2021
Status:
Live
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

NCEWS2 – Network Constraint Early Warning System (Phase 2)

Start date: Oct 2018
End date: Dec 2023
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Transformer Care

Start date: Aug 2018
End date: Sep 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Centralock - remote access management system

Start date: Aug 2018
End date: Aug 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Submarine Cable Sensing (SUBsense)

Start date: Aug 2018
End date: Mar 2024
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

In Pipe NTS Liquid Monitoring Systems

Start date: Aug 2018
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Investigate integrity of plain dents in grade L555 pipe

Start date: Aug 2018
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Pragmatic Security

Start date: Sep 2018
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Mobile Condensate Tanks

Start date: Sep 2018
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

IEC 61850 Cyber Resilient Electric Substation Technologies

Start date: Nov 2018
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Storm Joint

Start date: Oct 2018
End date: Nov 2020
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

High Frequency Earthing and its Impact on the Transmission System

Start date: Nov 2018
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Switchgear Enhanced Rating

Start date: Sep 2018
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Industrial and Commercial Carbon Capture

Start date: Oct 2018
End date: Feb 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

Interface

Start date: Oct 2018
End date: Oct 2022
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Blended Hydrogen and Compressed Natural Gas for Transport

Start date: Oct 2018
End date: Feb 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Artificial Intelligence and Machine Learning

Start date: Oct 2018
End date: Oct 2021
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Zero Missing Phenomenon

Start date: Oct 2018
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Kobus Gas Pipe Puller Stage 2

Start date: Nov 2018
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

A Holistic Intelligent Control System for flexible technologies

Start date: Dec 2018
End date: Dec 2022
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Virtual Statcom

Start date: Dec 2018
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Frequency Response Auction Trial

Start date: Dec 2018
End date: Jun 2021
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Overload Rotation to Increase Capacity of Transmission Boundaries

Start date: Dec 2018
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Feasibility study to unlocking flexibility from within industrial and commercial users.

Start date: Mar 2019
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

HV OHL Assessment

Start date: Jan 2019
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Shift

Start date: Jan 2019
End date: Oct 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

OHL (Overhead Line) Power Pointer

Start date: Dec 2018
End date: May 2022
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

The Future of LTS

Start date: Jan 2019
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Derivation of a Risk Based Approach to High Pressure Filter & Pig Trap Closure Inspection Frequencies

Start date: Jan 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

Enhancing Energy Flexibility from Wastewater Catchments through a Whole System Approach

Start date: Mar 2019
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Project Zero

Start date: Feb 2019
End date: Jul 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Informed Lightning Protection

Start date: Mar 2019
End date: Feb 2024
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Underground fault predictive model and earthing assessments

Start date: Feb 2019
End date: Aug 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Reflect Uncertainties around E-Vehicle Charging to Optimize Network Forecasting

Start date: Mar 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

HV Feeder monitoring to pre-empt faults

Start date: Feb 2019
End date: Mar 2023
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Short-term System Inertia Forecast

Start date: Mar 2019
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

RecorDER

Start date: Feb 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Novel O-Ring Designs (NORD)

Start date: Mar 2019
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Electric Vehicle Uptake Modelling (EV-Up)

Start date: Feb 2019
End date: Aug 2021
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

System Health Map Phase 1

Start date: Jul 2019
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Health Index Study of Electrical Energy Storage Systems within Electricity Networks.

Start date: Mar 2019
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Multi Asset Demand Execution (MADE)

Start date: Mar 2019
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Intelligent Network meshing switch

Start date: Apr 2019
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
Electricity North West

Monitoring of real-time Fugitive Emissions (MORFE)

Start date: Mar 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Captivate – Proof of Concept

Start date: Mar 2019
End date: Oct 2020
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Unified Protection

Start date: Apr 2019
End date: Feb 2022
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Residential Response

Start date: Apr 2019
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Phase Switch System

Start date: Jun 2019
End date: Mar 2023
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Urban Energy Club

Start date: May 2019
End date: Feb 2022
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Low Voltage – Underground Fault Location Technologies (LV-UFLT)

Start date: Jun 2019
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

THOR Hammer

Start date: Jun 2019
End date: Dec 2022
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Long Term Asset Reliability Study for Hydrogen Blended Gas

Start date: May 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Boston Spa Energy Efficiency Trial

Start date: Jun 2019
End date: Jun 2021
Status:
Live
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Improving Storm Resilience and Readiness through Data Analytics

Start date: Jun 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Proof of concept Tarmac Reinstatement Tester

Start date: Jun 2019
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Novel Temporary Earthing & Bonding Solutions

Start date: Mar 2020
End date: Nov 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Demonstration of Virtual Synchronous Machine control of a battery system

Start date: Jun 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Sleeve Assessment Technology – Phase 1

Start date: Jul 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

Refase Circuit Protection

Start date: Jun 2019
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Enabling Monitoring and Control of Underground Assets

Start date: Jun 2019
End date: Jul 2024
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Impact of LCTs on the design of the LV networks

Start date: Jun 2019
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

E Tourism

Start date: Jul 2019
End date: Sep 2022
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

An Investigation of the Performance of Oxygen Depletion Sensors

Start date: Jul 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

400kV Dynamic Cable Rating Retrofit Project utilising RPMA Communications Technology

Start date: Jul 2019
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Environmental Exposure of Overhead Lines: Data Delivery for Physical Testing

Start date: Sep 2019
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Automatic Location of Arc-faults through Remote Monitoring (ALARM)

Start date: Sep 2019
End date: May 2022
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Gas Quality Blending Services

Start date: Aug 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

PCB Sniffer

Start date: Sep 2019
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Harmonic Mitigation

Start date: Sep 2019
End date: Feb 2022
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Energy Exchange: Market-Based Curtailment Management

Start date: Sep 2019
End date: Aug 2022
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Testing Coordinated DSO-ESO Procurement and Dispatch

Start date: Sep 2019
End date: Jul 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

ERS Module Regulator Conversion Phase 2

Start date: Sep 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

Power Electronic Enabled Transformers (PEETs)

Start date: Oct 2019
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Optimised Infra-Red Image Systems (OsIRIS)

Start date: Oct 2019
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Duraseal Repair Method

Start date: Sep 2019
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Phasor Instream Data Processing (IDP)

Start date: Sep 2019
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Expanding LoRa

Start date: Sep 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Multi energy vector modelling

Start date: Oct 2019
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Optimising Distribution of Hydrogen

Start date: Sep 2019
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
Cadent

Technical Interfaces to Scale as a DSO

Start date: Sep 2019
End date: Sep 2021
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Economic Ageing of Transformers

Start date: Oct 2019
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Wildlife Protection

Start date: Sep 2019
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

MERLIN (Modelling the Economic Reactions Linking Individual Networks)

Start date: Oct 2019
End date: Oct 2021
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Study of Advanced Modelling for Network Planning Under Uncertainty

Start date: Oct 2019
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Bethesda Home Hub

Start date: Oct 2019
End date: Jun 2022
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Satellite Infrastructure Monitoring (SIM) – Stage 1

Start date: Oct 2019
End date: Jul 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Debris In Pipe

Start date: Oct 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

An Electric Heat Pathway – Looking Beyond Heat Pumps

Start date: Oct 2019
End date: Apr 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Virtual Monitoring Data (VM-Data)

Start date: Oct 2019
End date: Oct 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Phasor Based Monitoring for HVDC Applications

Start date: Oct 2019
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Spatial GB Clean Heat Pathway Model

Start date: Oct 2019
End date: Jan 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

IntraFlex

Start date: Oct 2019
End date: Nov 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Hybrid-Hydrogen (HyHy)

Start date: Nov 2019
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Zero-2050: South Wales (Whole system analysis)

Start date: Nov 2019
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

A Transition to LVDC - Phase 2

Start date: Nov 2019
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Applications of convex optimisation to enhance National Grid’s NOA process

Start date: Oct 2019
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Future Flex

Start date: Nov 2019
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Combined CP and Pressure Remote Monitoring Phase II

Start date: Nov 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Advanced Gas Detector Implementation Trial (AGD-IT)

Start date: Dec 2019
End date: May 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Storm Resilience

Start date: Dec 2019
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Presumed Open Data (POD)

Start date: Jan 2020
End date: Jun 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Big Data Analytics for Cable Systems

Start date: Dec 2019
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Feasibility of Compressed Dry Air 33kV Insulated Switchgear

Start date: Dec 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Impact of System inertia on the Critical Clearance Times (CCT) on the GB Transmission Network

Start date: Jan 2020
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Short Term Voltage Stability Monitoring Using PMU Data

Start date: Jan 2020
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Impact of Long-duration Energy Storage Systems on GB Transmission Planning

Start date: Dec 2019
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

The Chatter Tool

Start date: Dec 2019
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

TACAMA

Start date: Dec 2019
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Sub/Near Synchronous Instability in the GB Network

Start date: Jan 2020
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Risk mitigation of power electronics connections

Start date: Mar 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

HyDeploy2

Start date: Apr 2019
End date: Mar 2024
Status:
Live
Funding mechanism:
  • NIC
Cadent

Electric Nation - PoweredUp

Start date: Jan 2020
End date: Jul 2022
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Whole System Growth Scenario Modelling Phase 2

Start date: Jan 2020
End date: Jun 2023
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

iDentify

Start date: Feb 2020
End date: Mar 2024
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

LTE| Connecting Futures

Start date: Jan 2020
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

EPRI Research Collaboration on Overhead Transmission (P35) and Substations (P37)

Start date: Jan 2020
End date: Jul 2023
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Sarco Stopper

Start date: Jan 2020
End date: Jan 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Advanced Weather Forecasts for Dynamic Line Rating

Start date: Jan 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Challenging Composite Insulator Design Rules (Champions)

Start date: Jan 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Vacuum Excavation for Local Transmission System (VELTS) - Stage 2

Start date: Nov 2019
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Future Power Network Simulations

Start date: Apr 2020
End date: Oct 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Smart Hammer

Start date: Feb 2020
End date: Mar 2024
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Arc Aid

Start date: Feb 2020
End date: Jan 2023
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Net Zero South Wales – Cross Vector Scenarios

Start date: Feb 2020
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Cold Start

Start date: Feb 2020
End date: Feb 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Schematics – Phase 2

Start date: Feb 2020
End date: Oct 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Overcrossing Sleeve Investigation Tool

Start date: Feb 2020
End date: Oct 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

New online tools for Assessment of Bushing Condition (Not-ABC)

Start date: Mar 2020
End date: Jun 2020
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Long Term Stability Testing of Alternative Gases 2: C5F10O

Start date: Apr 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Real Time Fault Level Monitoring Stage 2

Start date: May 2020
End date: Mar 2024
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Novel Seal PPE - Phase 2

Start date: Feb 2020
End date: Jan 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Mapping the Impacts and Visualization of Risks of extreme weather on system operation (MIVOR)

Start date: Mar 2020
End date: Jun 2021
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Pipeline Spacers

Start date: Mar 2020
End date: Sep 2022
Funding mechanism:
  • Network Innovation Allowance
Cadent

Future Fiscal Forecasting

Start date: Mar 2020
End date: Dec 2020
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Permanent Leak Repair Clamps Phase 2

Start date: Mar 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Circuit See

Start date: Feb 2020
End date: Apr 2022
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Optimise Prime

Start date: Jan 2019
End date: Jan 2022
Status:
Live
Funding mechanism:
  • NIC
UK Power Networks

Street Score – Customer Navigational Experience

Start date: Mar 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Vehicle Transition - CNG

Start date: Mar 2020
End date: Feb 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

TraDER

Start date: Mar 2020
End date: Feb 2023
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Wake Induced Vibration Modelling

Start date: Apr 2020
End date: Jan 2022
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Rhino OLM

Start date: Mar 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

LeakVision

Start date: Mar 2020
End date: Aug 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Universal IoT Monitoring

Start date: Mar 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Black Start from Distributed Energy Resources

Start date: Apr 2019
End date: Apr 2022
Status:
Live
Funding mechanism:
  • NIC
National Energy System Operator

Field Trials For Hydrogen Blended Gas Detection Equipment

Start date: Mar 2020
End date: Aug 2023
Funding mechanism:
  • Network Innovation Allowance
Cadent

DC Share

Start date: Jan 2020
End date: Apr 2022
Funding mechanism:
  • NIC
National Grid Electricity Distribution

All Terrain Low Ground Pressure Access Vehicle with 34m boom

Start date: Mar 2020
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Local Electric Vehicle Energy Loop (LEVEL)

Start date: Apr 2020
End date: Oct 2021
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

I-Branch Seal

Start date: Apr 2020
End date: Sep 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Take Charge

Start date: Apr 2020
End date: Jan 2023
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Assessing wearable technology applications for transmission operation and design

Start date: May 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

A Substation of the Future

Start date: May 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Evaluation of Travelling Wave based Transmission Line Protection for Low-Fault Level Networks

Start date: Jul 2020
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Forward Resilience Measures (Stage 1)

Start date: Jun 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

4D Heat

Start date: May 2020
End date: Nov 2020
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

SHEDD – System HILP Event Demand Disconnection

Start date: May 2020
End date: May 2022
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

TOTEM (Transmission Owner Tools for EMT Modelling)

Start date: May 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Transmission

Live Service Transfer

Start date: May 2020
End date: Aug 2020
Funding mechanism:
  • Network Innovation Allowance
SGN

Cyber Security Solutions for Legacy Equipment

Start date: Sep 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

CH4RGE – Methane Reduction from Gas Equipment

Start date: May 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Line Search

Start date: May 2020
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Corrosion Modelling

Start date: May 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

i40 Connectivity Project

Start date: May 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

EPRG (European Pipeline Research Group) 2020

Start date: May 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

PRCI (Pipeline Research Council International) 2020

Start date: May 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Stent Bag 2

Start date: Jun 2020
End date: Apr 2022
Funding mechanism:
  • Network Innovation Allowance
SGN

Project Synthesis – Effective Regional Inertia Monitoring and Automatic Control with a Whole System Approach

Start date: Jun 2020
End date: Dec 2022
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

DETECTS - Developing Enhanced Techniques to Evaluate Converter-dominated Transmission System Operability

Start date: May 2020
End date: May 2021
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Resin Mixing

Start date: May 2020
End date: Nov 2020
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Methane Alarms

Start date: Jun 2020
End date: Apr 2022
Funding mechanism:
  • Network Innovation Allowance
Cadent

HySCALE – Feasibility study of the use of LOHCs for bulk hydrogen storage and transport.

Start date: Jun 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

Feasibility Study on Upgrading Transmission Network Capability for Renewable Connection

Start date: Jul 2020
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Optimal Coordination of Active Network Management Schemes and Balancing Services Market

Start date: Jun 2020
End date: Jun 2021
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Miles better fault location

Start date: May 2020
End date: May 2023
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Probabilistic planning for stability constraints

Start date: Jun 2020
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

HyNTS Roadmap to FutureGrid

Start date: Jul 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

myDart Phase 2 – Digital Asset Records Tool

Start date: Jul 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

White Van Plan

Start date: Jul 2020
End date: Oct 2022
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Heat Street: Local System Planning

Start date: Jul 2020
End date: Aug 2021
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Geopolymer Injection for Ground Stabilisation and the re-levelling of buried assets

Start date: Jul 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Control REACT

Start date: Jul 2020
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

Radio Teleprotection

Start date: Aug 2020
End date: Aug 2023
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Odorant Monitoring

Start date: Aug 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

H21 - Understanding Industrial & Commercial Customers

Start date: Aug 2020
End date: May 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

H21 Occupied Trials – Phase One

Start date: Aug 2020
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Legacy Stubs

Start date: Aug 2020
End date: Feb 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

HyCompact

Start date: Aug 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Charge Collective

Start date: Aug 2020
End date: Dec 2022
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

I-0331 Optimising Distribution of Hydrogen Phase 2

Start date: Aug 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Integrated Calibration Solution

Start date: Sep 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Skyline

Start date: Sep 2020
End date: Jun 2022
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

3D Printing of Network Assets

Start date: Sep 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Flexible Generation Forecasting

Start date: Sep 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Safety & Operational Framework for the Temporary Provision of Alternative Natural Gas Systems 2 (SOFTPANG 2)

Start date: Sep 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Network Event and Alarm Transparency (NEAT)

Start date: Oct 2020
End date: Jun 2023
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Inline Flow Stop - Feasibility

Start date: Oct 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Cleaner Engines

Start date: Oct 2020
End date: Mar 2023
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

CommuniHeat

Start date: Oct 2020
End date: Dec 2022
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

HyTechnical – Literature, science review and subsequent revision technical standards for hydrogen pipelines

Start date: Jun 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

GIS temperature monitoring

Start date: Nov 2020
End date: Jun 2022
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Equal Electric Vehicles

Start date: Oct 2020
End date: Apr 2022
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Spatially Enabled Asset Management (SEAM)

Start date: Nov 2020
End date: Oct 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

I-0335 HyNet Basis of Design Project

Start date: Oct 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

DoorStop

Start date: Oct 2020
End date: May 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

FutureLink

Start date: Nov 2020
End date: Aug 2024
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Socially Green

Start date: Nov 2020
End date: Dec 2023
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Near Real-time Data Access (NeRDA)

Start date: Nov 2020
End date: Mar 2024
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Valve Care Toolbox 3

Start date: Nov 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

On-Site Non-Intrusive Polychlorinated Biphenyls (PCB) Tester

Start date: Oct 2021
End date: May 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Risk Assessment Methodologies for Pipelines and AGIs 2020

Start date: Apr 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Synaps 2 - Fault Detection, Classification & Location Solution

Start date: Dec 2020
End date: Mar 2024
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

H21 Initial Hydrogen Supply Strategy

Start date: Nov 2020
End date: Sep 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Envision

Start date: Dec 2020
End date: Feb 2023
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

I-0337 HyNet Operation and Control

Start date: Dec 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Dynamic Charging of Vehicles

Start date: Dec 2020
End date: Feb 2022
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Analytical Approach for Vegetation Management

Start date: Dec 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Temporary Event Charging

Start date: Dec 2020
End date: Oct 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Optimal Outage Planning System

Start date: Dec 2020
End date: Dec 2022
Funding mechanism:
  • Network Innovation Allowance
National Energy System Operator

I-0334 Hy4Transport

Start date: Nov 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

InTEGReL: Academic review of fuel poverty, vulnerability and GB research capability

Start date: Nov 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Low Voltage Feeder Cable Open Circuit Detection

Start date: Dec 2020
End date: Mar 2024
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

Covid Vulnerability

Start date: Dec 2020
End date: Jun 2021
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Future Control Room

Start date: Jan 2021
End date: Apr 2022
Strategy themes:
  • Data and digitalisation
Funding mechanism:
  • Network Innovation Allowance
Scottish and Southern Electricity Networks Distribution

I-0339 - Technical Review - KIWA

Start date: Dec 2020
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Smart Cable Guard

Start date: Feb 2021
End date: Feb 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

H21 – Hydrogen Ready Services

Start date: Jan 2021
End date: Aug 2021
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Voyage

Start date: Feb 2021
End date: Jun 2022
Strategy themes:
  • Net zero and the energy system transition
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Energy Planning Integrated with Councils

Start date: Feb 2021
End date: Dec 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Peak Heat

Start date: Feb 2021
End date: May 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

H21 - Hydrogen Ready Components

Start date: Jan 2021
End date: Jan 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

I-0342 Cumbrian Hydrogen vision and pathway – Phase 1 Feasibility

Start date: Jan 2021
End date: Jul 2021
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • Network Innovation Allowance
Cadent

Landslide Protection Asset

Start date: Mar 2021
End date: Jun 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Enable

Start date: Mar 2021
End date: Mar 2022
Strategy themes:
  • Consumer vulnerability
  • Net zero and the energy system transition
Funding mechanism:
  • Network Innovation Allowance
UK Power Networks

Re-Heat: Enabling Renewable Heat

Start date: Jun 2021
End date: Jun 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
SP Energy Networks Distribution

H2GO - Domestic Hydrogen Detector

Start date: Mar 2021
End date: Mar 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

TEENEE

Start date: Mar 2021
End date: Mar 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Printable Pressure Sensors

Start date: Sep 2019
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Safe Operational Framework for the Temporary Provision of Alternative Natural Gas Systems 3 (SOFTPANG 3)

Start date: Mar 2021
End date: Mar 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

DBS:Test, Review, Recommend

Start date: Mar 2021
End date: Mar 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Live & Dead Check Analyser

Start date: Oct 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Hydrogen Storage for Zero Carbon Fleet Transport

Start date: May 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Health and Safety Monitor – Phase Two

Start date: Dec 2019
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

ServiSWAP

Start date: Jun 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Gas Venting Research

Start date: Aug 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

EPRI Research Collaboration on Underground Transmission (P36+ P34 part) 2018 - 2021

Start date: Jan 2018
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

EPRI Research Collaboration on Substations (P37) 2017 - 2020

Start date: Jan 2017
End date: Apr 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

GRAID ART

Start date: Mar 2019
End date: Aug 2021
Funding mechanism:
  • Network Innovation Allowance
National Gas Transmission PLC

Project Conan

Start date: Mar 2021
End date: Jun 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Polesight

Start date: Mar 2021
End date: Mar 2023
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Northern Powergrid

Bonded Saddle V2

Start date: Mar 2021
End date: Mar 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Ramp Up

Start date: Dec 2019
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Tools Of Engagement

Start date: Mar 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Project MOLE (Minimising Our Launch Excavations)

Start date: Mar 2021
End date: Mar 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Zero emission odorant pumping system

Start date: Mar 2021
End date: Mar 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Wales & West Utilities

Mobile robot for automated identification of failures in HV substations

Start date: Oct 2016
End date: Jul 2021
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Transmission

Optinet

Start date: Oct 2018
End date: Mar 2024
Status:
Live
Funding mechanism:
  • Network Innovation Allowance
Cadent

I-0343 Calorific value and gas quality impact assessment of hydrogen and biomethane blends

Start date: Mar 2021
End date: Jul 2021
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • Network Innovation Allowance
Cadent

Large Diameter PE Pipe Cutter

Start date: Mar 2021
End date: Mar 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Digitisation of SCO Database

Start date: Jan 2021
End date: Mar 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Slow Strain Rate Test and Hydrogen Permeation Correlation

Start date: Mar 2021
End date: Sep 2021
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • Network Innovation Allowance
SGN

The Future of LTS: Evaluation of Vintage Pipeline Materials in Hydrogen Environments

Start date: Sep 2020
End date: Sep 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

Easy Assist ECV Phase 2

Start date: Sep 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
Cadent

EDGE-FCLi (Embedded Distributed Generation Electronic Fault Current Limiting interrupter)

Start date: Sep 2018
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
National Grid Electricity Distribution

Transmission OHL Crossing Protection Stage 1

Start date: Jul 2020
End date: Mar 2022
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

Energy Centre

Start date: Mar 2020
End date: Feb 2022
Funding mechanism:
  • Network Innovation Allowance
Cadent

Resilience as a Service

Start date: Jan 2020
End date: Sep 2024
Status:
Live
Funding mechanism:
  • NIC
Scottish and Southern Electricity Networks Distribution

Flexible Tower Block

Start date: Feb 2021
End date: May 2022
Strategy themes:
  • Flexibility and market evolution
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

ESeal 2 Extension

Start date: Jan 2021
End date: Mar 2022
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Northern Gas Networks

Hydrogen Gas Detection Instrument

Start date: Oct 2019
End date: Sep 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

Hydrogen Excess Flow Valve

Start date: Aug 2019
End date: Aug 2021
Funding mechanism:
  • Network Innovation Allowance
SGN

ServiBoost Phase 3

Start date: Mar 2020
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Remote Live Mains Insertion (RLMI)

Start date: Apr 2019
End date: Mar 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Decision Tool

Start date: Apr 2020
End date: Jun 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Composite repairs for through wall defects on metal pipes

Start date: Apr 2019
End date: Sep 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

SAFE-HD (Spatial Analysis of Future Electric Heat Demand)

Start date: Aug 2019
End date: Dec 2021
Funding mechanism:
  • Network Innovation Allowance
SP Energy Networks Distribution

I-0321 Transport Pathways

Start date: Jun 2020
End date: Feb 2021
Funding mechanism:
  • Network Innovation Allowance
Cadent

Connecting with Customers – Intelligent Virtual Surveying Tool for Vulnerable Customers

Start date: Mar 2021
End date: Oct 2021
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • Network Innovation Allowance
Cadent

Intelligent Governor Surveying and Monitoring

Start date: Mar 2021
End date: Feb 2022
Funding mechanism:
  • Network Innovation Allowance
Cadent

Smart Heat

Start date: Apr 2021
End date: Apr 2022
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-1
Electricity North West

On-line assessment of neutral conductor integrity

Start date: Apr 2021
End date: Dec 2023
Status:
Live
Strategy themes:
  • Optimised assets and practices
Funding mechanism:
  • NIA RIIO-1
Electricity North West

CrowdFlex

Start date: Apr 2021
End date: Mar 2022
Strategy themes:
  • Whole energy systems
Funding mechanism:
  • NIA RIIO-2
National Energy System Operator

Effect of 100% hydrogen on cast iron assets

Start date: May 2023
End date: Dec 2024
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
Cadent

Graphene Enhanced Maturity Site Trials and Optimal Network Evaluation​ (GEMSTONE)​

Start date: Sep 2024
End date: Feb 2025
Strategy themes:
  • Net zero and the energy system transition
Funding mechanism:
  • NIA RIIO-2
National Grid Electricity Transmission