TSO - DNO Real Time Data Exchange for Smartgrid Operation
- Status:
- Complete
- START DATE:
- END DATE:
Project summary
- Funding mechanism:
-
- IFI
- Technology:
-
- Gas Distribution Networks
- Expenditure:
- £59,000
Summary
Documents
The introduction of SMART Networks within GB will potentially introduce increased uncertainty in the operation of the overall transmission network, in terms of both the increased level of volatility in demand and the consequent impact on transmission network flows. Without adequate data exchange and the development of suitable analysis tools and data visualisation between both the Transmission company and the DNOs it will not be possible to ensure that appropriate levels of security are maintained across all networks, ultimately potentially impacting the reliability of supply in GB.
Objectives
The project will assess the requirements for, and demonstrate the viability of enhanced data exchange between National Grid (as Transmission System Operator) and the Distribution Network Operators to facilitate the secure and effective operation of the GB electricity networks following the introduction of Smart Grids.Similar projects
No Power Hot Water Phase 2.
Start date:
End date:
Status:
Complete
Technology:
- Gas Distribution Networks
Funding mechanism:
- Network Innovation Allowance
ACE (Advanced Condensing Exchanger) – Phase 2.
Start date:
End date:
Status:
Complete
Technology:
- Gas Distribution Networks
Funding mechanism:
- Network Innovation Allowance
Hydrogen Deblending in the GB Gas Network.
Start date:
End date:
Status:
Complete
Technology:
- Gas Distribution Networks
Funding mechanism:
- Network Innovation Allowance