Real Time Fault Level Monitoring Stage 2 (ED-2)
- Status:
- Live
- Project Reference Number:
- NIA_SPEN_0097
- STRATEGY THEME:
-
- Optimised assets and practices
- START DATE:
- END DATE:
Project summary
- Funding Licensee(s):
-
- SPEN-D - SP Energy Networks Distribution
- UKPN - Eastern Power Networks Plc
- UKPN - London Power Networks Plc
- UKPN - South Eastern Power Networks Plc
- Funding mechanism:
-
- NIA_RIIO-2
- Technology:
-
- Fault Level
- Expenditure:
- £1,980,000
Summary
Documents
Similar projects
Real Time Fault Level Monitoring (RTFLM) - Stage 1.
Start date:
End date:
Status:
Complete
Technology:
- Fault Level
Funding mechanism:
- Network Innovation Allowance
Directional Earth Fault Passage Indicator Trial.
Start date:
End date:
Status:
Complete
Technology:
- Fault Level
Funding mechanism:
- Network Innovation Allowance
Powerful-CB: Power Electronic Fault Limiting Circuit Breaker.
Start date:
End date:
Status:
Live
Technology:
- Fault Level
Funding mechanism:
- NIC