TOTEM (Transmission Owner Tools for EMT Modelling) 2
- Status:
- Complete
- Project Reference Number:
- NIA_SHET_0045
- STRATEGY THEME:
-
- Net zero and the energy system transition
- START DATE:
- END DATE:
Project summary
- Funding mechanism:
-
- NIA_RIIO-2
- Technology:
-
- Control Systems
- Electricity Transmission Networks
- Fault Level
- Harmonics
- Meshed Networks
- Modelling
- System Security
- Voltage Control
- Expenditure:
- £100,000
- Preceding Projects:
Summary
Learnings
Documents
Similar projects
TOTEM (Transmission Owner Tools for EMT Modelling) Extension.
Start date:
End date:
Status:
Complete
Technology:
- Control Systems
- Electricity Transmission Networks
- Fault Level
- Harmonics
- Meshed Networks
- Modelling
- System Security
- Voltage Control
Funding mechanism:
- NIA_RIIO-2
Step Up - Sub-Transmission Enhanced Performance: Uprating Power to 220kV.
Start date:
End date:
Status:
Live
Technology:
- Active Network Management
- Asset Management
- Commercial
- Comms and IT
- Condition Monitoring
- Conductors
- Control Systems
- Demand Response
- Distributed Generation
- Electricity Transmission Networks
- Energy Storage
- Environmental
- Fault Current
- Fault Level
- Fault Management
- Harmonics
- Health and Safety
- High Voltage Technology
- Low Carbon Generation
- Maintenance & Inspections
- Meshed Networks
- Modelling
- Network Monitoring
- Overhead Lines
- Photovoltaics
- Protection
- Resilience
- Substation Monitoring
- Substations
- System Security
- Transformers
Funding mechanism:
- NIA_RIIO-2
Strength to Connect.
Start date:
End date:
Status:
Live
Technology:
- Control Systems
- Modelling
- System Security
- Voltage Control
Funding mechanism:
- NIA_RIIO-2
