Protection Solutions to perform for Lower Levels of Fault Current on AC Networks (PSL-FC)
Status:
Live
Project Reference Number:
NIA_SHET_0033
STRATEGY THEME:
  • Net zero and the energy system transition
START DATE:
END DATE:

Project summary
Funding Licensee(s):
  • SSEN - Scottish Hydro Electric Transmission
Funding mechanism:
  • NIA_RIIO-2
Technology:
  • Control Systems
  • Fault Current
  • Fault Level
  • Fault Management
  • Network Monitoring
  • Protection
  • Resilience
  • System Security
Expenditure:
£717,000
Summary
Learnings
Documents