Alternative Riser Pipe Jointing Method - Pyplok
- Status:
- Complete
- Project Reference Number:
- NIA_NGGD0021
- START DATE:
- END DATE:
Project summary
- Funding mechanism:
-
- Network Innovation Allowance
- Technology:
-
- Gas Distribution Networks
- Expenditure:
- £566,133
Summary
Documents
The scope of this project includes:
- Review current information regarding the Pyplok system
- Define functional requirements of alternative steel fittings for use on gas riser systems, such as Pyplok
- Conduct approval testing of Pyplok
- Field trial Pyplok
Benefits
Success of the project will be the passing of approval testing of Pyplok technology, as an alternative jointing method for riser pipe work, which removes the need for welding (which requires hot work permits) or screwed fittings which can only be used up to 2” diameter.
Similar projects
No Power Hot Water Phase 2.
Start date:
End date:
Status:
Complete
Technology:
- Gas Distribution Networks
Funding mechanism:
- Network Innovation Allowance
ACE (Advanced Condensing Exchanger) – Phase 2.
Start date:
End date:
Status:
Complete
Technology:
- Gas Distribution Networks
Funding mechanism:
- Network Innovation Allowance
Hydrogen Deblending in the GB Gas Network.
Start date:
End date:
Status:
Complete
Technology:
- Gas Distribution Networks
Funding mechanism:
- Network Innovation Allowance