Granular Voltage Control (GVC)
- Status:
- Complete
- Project Reference Number:
- NIA_NGET0134
- START DATE:
- END DATE:
Project summary
- Funding mechanism:
-
- Network Innovation Allowance
- Research area:
-
- ED - Network improvements and system operability
- Technology:
-
- Control Systems
- Expenditure:
- £396,050
Summary
Documents
Phase 1 – develop a working prototype of the GVC with the following deliverables;
- GVC concept proved and tested.
- Working prototype available.
- Report delivered on this phase (Report).
Phase 2 – small scale trial of the GVC to determine whether dynamic voltage control is a viable primary frequency response solution, dependent upon the successful completion of Phase 1 and with the following deliverables;
- Communications and frequency algorithms proved and tested in the field (Report).
- Testing and field trials completed (Report).
- Analysis report delivered (Report).
- Project completed (Full Report).
Benefits
To judge the success of the project the following success criteria are proposed:- Demonstrate the feasibility of 500ms response to provide Rapid Frequency Response and/or primary/secondary response from dynamic voltage control on demands.
- Aggregation of remote voltage control unit output to provide a virtual power plant; and
- Deliver a final report at the end of the project that demonstrates the technical merits of GVC and the validity of the CBA.
Similar projects
Quantifying benefits and risks of applying advanced network control and demand response technologies.
Start date:
End date:
Status:
Complete
Technology:
- Control Systems
Funding mechanism:
- Network Innovation Allowance

South East Smart Grids.
Start date:
End date:
Status:
Complete
Technology:
- Control Systems
Funding mechanism:
- Network Innovation Allowance

Harmonic Mitigation.
Start date:
End date:
Status:
Complete
Technology:
- Control Systems
Funding mechanism:
- Network Innovation Allowance