Enhanced Frequency Control Capability (EFCC)
- Status:
- Live
- Project Reference Number:
- NGETEN03
- START DATE:
- END DATE:
Project summary
- Funding mechanism:
-
- NIC
- Technology:
-
- Electricity Transmission Networks
- Expenditure:
- £9,344,000
- Third Party Collaborators:
-
- The University of Manchester
- University of Strathclyde
- Siemens
- BELECTRIC GmbH
- Centrica
- General Electric
- Flexitricity
- Orsted
Summary
Documents
Similar projects
Probabilistic Modelling for Connection Studies.
Start date:
End date:
Status:
Complete
Technology:
- Electricity Transmission Networks
- Modelling
Funding mechanism:
- NIA_RIIO-2
Future of the Transmission Network Charging Methodology.
Start date:
End date:
Status:
Live
Technology:
- Commercial
- Electricity Transmission Networks
Funding mechanism:
- NIA_RIIO-2

Optimum Wide Area Power Flow Control Solutions.
Start date:
End date:
Status:
Live
Technology:
- Electricity Transmission Networks
Funding mechanism:
- NIA_RIIO-2