LV Network Automation
- Status:
- Complete
- Project Reference Number:
- IFI 0607
- START DATE:
- END DATE:
Project summary
- Funding mechanism:
-
- IFI
- Technology:
-
- LV & 11kV Networks
- Expenditure:
- £257,775
Summary
Documents
The Low Voltage networks contribute 11% Customer Interruption (CI) and 15.5% Customer Minutes Lost (CML) between the SP-D / SP-M networks (taken from 2003/04 NaFIRs report).
- Both proposals aim to produce, install and test prototype systems on a trial network, providing a proof of concept and evaluating performance of the installation on the Low Voltage (LV) distribution network
- Application will be to focus on high customer density, worst performing LV circuits.
Objectives
The aim of a Low Voltage Automation (LVA) project is to provide a trial system on SPENs LV network, which will prove the benefits of implementing a larger scale LVA system across the LV networks. The trial system will consist of one LVA CCU (modified old CCU) and one phase LVA switch. It is two major parts that will be validated in the project. The first one is the communication from the control point to the LVA switch. The communication technique will be the Power Line Communication (PLC). The second part is the mechanical behaviour and the control of the Magnetic vacuum Switch from EPS.Similar projects
Interoperable LV Automation – Stage 1.
Start date:
End date:
Status:
Complete
Technology:
- LV & 11kV Networks
Funding mechanism:
- Network Innovation Allowance
Transition to low voltage DC distribution networks – Phase 1.
Start date:
End date:
Status:
Complete
Technology:
- LV & 11kV Networks
Funding mechanism:
- Network Innovation Allowance
Smart Data.
Start date:
End date:
Status:
Complete
Technology:
- LV & 11kV Networks
- Modelling
Funding mechanism:
- Network Innovation Allowance