The complete project will:
- Devise a methodology for local engagement that informs both the investment decisions of the DSO and of local decision-makers and other energy network owners to maximise the likelihood of investments and decisions that support an optimal whole system outcome
- Devise a methodology for whole-system energy scenario modelling which includes electricity, water and gas; distributed energy resources; EV uptake and other transport issues; housing and infrastructure development plans; and the Future Energy Scenarios
- Using the methodology, create a detailed, ground-up model of Generation and Demand growth scenarios from the present day to the year 2040, covering the distribution network served by specific Grid Supply Points in the three nominated areas of Scotland, from the Transmission/Distribution interface down to the 33kV level• Look beyond the current project pipeline of development for each technology considered, by using the National Grid Future Energy Scenarios as the basis of longer term modelling• Model the impact of the intentions and aspirations of wider local stakeholders, including the Scottish Government, local authorities and industries, and the wider communities within the areas concerned, especially the development of housing and infrastructure• Assess the effects of developments such as Gas Distribution Network extension on power flows, power import/export at the T/D interface, system stability and balancing services; similarly, the effects of planned developments by other infrastructure providers such as water and telecoms utilities• Overlay the results on our existing models of the network, and ask where flexible resources can be used. Use experience gained in previous projects (such as SAVE and NTVV), together with CMZ and Active Network Management deployments, to identify how these can provide option value and reduce total system costs over the range of future scenarios
- Develop a methodology for identifying the optimal holistic development strategy for the area concerned
- Identify the events and conditions which would trigger reinforcement investment and the optimum time to begin those investments in the four Future Energy Scenarios
- Assess the risks posed by increasing reliance on unconventional assets and virtual resources (such as aggregated demand response), to system stability and quality of service. Examine the failure modes and effects of these resources, when used in combination with other assets in the three areas concerned
- Document the methodology used in the modelling so that it can be repeated in other areas and the models updated over time as changes occur
Benefits
- A whole-system methodology is developed which enables a ground-up model to be constructed of a distribution area, looking forward for 20 years or more, under various scenarios, which can inform investment planning and decision-making
- The scenario analysis allows the company to examine the scope for applying flexible and distributed energy resources to meet the new DSO responsibilities in the areas modelled
- Improved understanding is gained of whole-system factors including the extension of the gas supply network and other utility developments
- Acknowledgment from local decision makers of the value of the methodology in allowing them to make the best decisions from a whole system perspective
- Dissemination of the outputs to all stakeholders, with continuing engagement