Short Circuit Calculation in IBR Dominated Networks
- Status:
- Live
- Project Reference Number:
- NIA_SPEN_0112
- STRATEGY THEME:
-
- Optimised assets and practices
- START DATE:
- END DATE:
Project summary
- Funding mechanism:
-
- NIA_RIIO-2
- Technology:
-
- Electricity Transmission Networks
- Fault Current
- Fault Level
- Modelling
- Resilience
- Expenditure:
- £100,000
Summary
Documents
Similar projects
Protection Solutions to perform for Lower Levels of Fault Current on AC Networks (PSL-FC).
Start date:
End date:
Status:
Live
Technology:
- Control Systems
- Fault Current
- Fault Level
- Fault Management
- Network Monitoring
- Protection
- Resilience
- System Security
Funding mechanism:
- NIA_RIIO-2
System Short Circuit Tests.
Start date:
End date:
Status:
Live
Technology:
- Electricity Transmission Networks
- Fault Level
- Modelling
- Network Monitoring
Funding mechanism:
- NIA_RIIO-2
TOTEM (Transmission Owner Tools for EMT Modelling) Extension.
Start date:
End date:
Status:
Complete
Technology:
- Control Systems
- Electricity Transmission Networks
- Fault Level
- Harmonics
- Meshed Networks
- Modelling
- System Security
- Voltage Control
Funding mechanism:
- NIA_RIIO-2