Ignition Probability in Small Services
- Status:
- Complete
- Project Reference Number:
- NIA2_SGN0027
- STRATEGY THEME:
-
- Net zero and the energy system transition
- START DATE:
- END DATE:
Project summary
- Funding mechanism:
-
- NIA_RIIO-2
- Technology:
-
- Gas Distribution Networks
- Gas Transmission Networks
- Green Gas
- Health and Safety
- Hydrogen
- Expenditure:
- £93,700
Summary
Learnings
Documents
Similar projects
H100 Fife Phase 2 Village Pre-FEED .
Start date:
End date:
Status:
Complete
Technology:
- Energy Storage
- Environmental
- Gas Distribution Networks
- Green Gas
- Health and Safety
- Hydrogen
- Low Carbon Generation
- Stakeholder Engagement
Funding mechanism:
- NIA_RIIO-2
Ancillary Components Product Suitability for Use with Hydrogen - Verification Evidence.
Start date:
End date:
Status:
Live
Technology:
- Gas Transmission Networks
- Health and Safety
- Hydrogen
Funding mechanism:
- NIA_RIIO-2
RTSM - Phase 1 - Methodology Development .
Start date:
End date:
Status:
Live
Technology:
- Active Network Management
- Biomethane
- Control Systems
- Gas Distribution Networks
- Gas Transmission Networks
- Green Gas
- Hydrogen
- Measurement
- Modelling
- Stakeholder Engagement
Funding mechanism:
- NIA_RIIO-2